Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4, Inspections, Tests, Analyses, and Acceptance Criteria, 55658-55659 [2017-25298]
Download as PDF
55658
Federal Register / Vol. 82, No. 224 / Wednesday, November 22, 2017 / Notices
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The ISG,
‘‘Clarification of Licensee Actions in
Receipt of Enforcement Discretion
Memorandum 15–002, ‘‘Enforcement
Discretion for Tornado-Generated
Missile Protection Noncompliance,’’
Revision 1, is available in ADAMS
under Accession No. ML17128A344.
Enforcement Guidance Memorandum,
EGM 15–002, ‘‘Enforcement Discretion
for Tornado-Generated Missile
Protection Noncompliance,’’ Revision 1
is available in ADAMS under Accession
No. ML16355A286.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
James Hickey, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory
Commission, Washington DC 20555–
0001; telephone: 301–415–2180, email:
James.Hickey@nrc.gov.
SUPPLEMENTARY INFORMATION: The NRC
published a Federal Register notice
requesting public comment on this
interim staff guidance (ISG) on February
23, 2017 (82 FR 11483). The agency
received five total comments. The NRC
considered the comments, which
resulted in no changes to the ISG. The
evaluation of these comments is
discussed in the last appendix of the
ISG.
asabaliauskas on DSKBBXCHB2PROD with NOTICES
I. Background
The Office of Nuclear Reactor
Regulation (NRR), Division of Risk
Analysis (DRA) completed a generic
bounding risk analysis (ADAMS
Accession No. ML14114A556) that
concluded that the issues associated
with the inoperability of a Structure,
System, or Component due to a tornadogenerated missile are likely to be of low
risk significance, and do not require
immediate plant shutdown. Based on
the conclusions of the NRR/DRA
analysis, the staff issued EGM 15–002,
dated June 10, 2015. In its
implementation of EGM 15–002, the
NRC staff found that additional
refinements are needed to address
reportability, enforcement of long
standing design issues, and the duration
of the enforcement discretion resulting
from all the non-conforming conditions
being assessed together. As a result, the
staff issued EGM 15–002, Revision 1,
dated February 7, 2017.
This revised ISG adds additional
information for inspection and review
staff to support implementation of the
changes made in EGM 15–002, Revision
1. This revised ISG provides an
VerDate Sep<11>2014
18:57 Nov 21, 2017
Jkt 244001
approach to extending the discretion.
The revisions to this ISG also revise
provisions concerning reportability
requirements under § 50.72 of title 10 of
the Code of Federal Regulations (10
CFR), discusses enforcement discretion
for long-term design non conformances,
and reinforces the need for licensees to
follow the corrective action program
when dispositioning the impact of
identified tornado missile nonconformances on operability. This
revised ISG will expire with the
expiration of EGM 15–002, Revision 1.
II. Backfit Discussion
Issuance of this ISG in final form does
not constitute backfitting as defined in
10 CFR 50.109 (the Backfit Rule). As
discussed in the ‘‘Backfitting’’ section of
DSS–ISG- 2016–001, Revision 1, this
ISG contains guidance for the NRC staff
for implementing EGM–15–002. This
ISG does not constitute backfitting as
defined in the Backfit Rule and is not
otherwise inconsistent with the issue
finality provisions in 10 CFR part 52,
and the NRC staff did not prepare a
backfit analysis. This because this ISG
requires no response by licensees, and
concerns only NRC staff implementation
of enforcement discretion pursuant to
EGM–15–002.
III. Congressional Review Act
This ISG is a rule as defined in the
Congressional Review Act (5 U.S.C.
801–808). However, the Office of
Management and Budget has not found
it to be a major rule as defined in the
Congressional Review Act.
Dated at Rockville, Maryland, this 16th day
of November, 2017.
For the Nuclear Regulatory Commission.
Alexander H. Schwab,
Project Manager, ROP Support and Generic
Communications Branch, Division of
Inspection and Regional Support, Office of
Nuclear Reactor Regulation.
[FR Doc. 2017–25271 Filed 11–21–17; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 52–025 and 52–026; NRC–
2008–0252]
Southern Nuclear Operating Company,
Inc., Vogtle Electric Generating Plant,
Units 3 and 4, Inspections, Tests,
Analyses, and Acceptance Criteria
Nuclear Regulatory
Commission.
ACTION: Determination of the successful
completion of inspections, tests, and
analyses.
AGENCY:
PO 00000
Frm 00106
Fmt 4703
Sfmt 4703
The U.S. Nuclear Regulatory
Commission (NRC) staff has determined
that the inspections, tests, and analyses
have been successfully completed, and
that the specified acceptance criteria are
met for the Vogtle Electric Generating
Plant (VEGP), Units 3 and 4.
DATES: The applicable date for
determining successful completion of
inspections, tests, and analyses for
VEGP Units 3 and 4 is November 22,
2017.
ADDRESSES: Please refer to Docket ID
NRC–2008–0252 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2008–0252. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced (if it is available in
ADAMS) is provided the first time that
it is mentioned in this document.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
Chandu Patel, Office of New Reactors,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–3025; email: Chandu.Patel@
nrc.gov.
SUPPLEMENTARY INFORMATION:
SUMMARY:
I. Licensee Notification of Completion
of ITAAC
Southern Nuclear Operating
Company, Inc. (SNC), Georgia Power
Company, Oglethorpe Power
Corporation, MEAG Power SPVM, LLC.,
MEAG Power SPVJ, LLC., MEAG Power
SPVP, LLC., and the City of Dalton,
E:\FR\FM\22NON1.SGM
22NON1
Federal Register / Vol. 82, No. 224 / Wednesday, November 22, 2017 / Notices
Georgia, (hereafter called the licensee)
has submitted inspections, tests,
analyses, and acceptance criteria
(ITAAC) closure notifications (ICNs)
under § 52.99(c)(1) of title 10 of the
Code of Federal Regulations (10 CFR),
informing the NRC that the licensee has
successfully performed the required
inspections, tests, and analyses, and that
the acceptance criteria are met for:
VEGP Unit 3 ITAAC
2.1.02.08a.i (28), 2.1.02.08d.iii (34),
2.2.04.08a.i (235), 2.2.04.08a.ii (236),
2.5.01.03d (514), 2.5.02.07a (534),
2.5.02.07d (537), 2.5.02.07e (538),
2.5.02.14 (553), C.2.6.12.06 (676),
3.2.00.01a (739), and 3.2.00.01b (740)
asabaliauskas on DSKBBXCHB2PROD with NOTICES
VEGP Unit 4 ITAAC
2.1.02.08a.i (28), 2.1.02.08d.iii (34),
2.5.01.03d (514), 2.5.02.07a (534),
2.5.02.07d (537), 2.5.02.07e (538),
2.5.02.14 (553), 3.2.00.01a (739), and
3.2.00.01b (740)
The ITAAC for VEGP Unit 3 are in
Appendix C of the VEGP Unit 3
combined license (ADAMS Accession
No. ML14100A106). The ITAAC for
VEGP Unit 4 are in Appendix C of VEGP
Unit 4 combined license (ADAMS
Accession No. ML14100A135).
II. NRC Staff Determination of
Completion of ITAAC
The NRC staff has determined that the
specified inspections, tests, and
analyses have been successfully
completed, and that the specified
acceptance criteria are met. The
documentation of the NRC staff’s
determination is in the ITAAC Closure
Verification Evaluation Form (VEF) for
each ITAAC. The VEF is a form that
represents the NRC staff’s structured
process for reviewing ICNs. Each ICN
presents a narrative description of how
the ITAAC was completed. The NRC’s
ICN review process involves a
determination on whether, among other
things: (1) Each ICN provides sufficient
information, including a summary of the
methodology used to perform the
ITAAC, to demonstrate that the
inspections, tests, and analyses have
been successfully completed; (2) each
ICN provides sufficient information to
demonstrate that the acceptance criteria
of the ITAAC are met; and (3) any NRC
inspections for the ITAAC have been
completed and any ITAAC findings
associated with that ITAAC have been
closed.
The NRC staff’s determination of the
successful completion of these ITAAC is
based on information available at this
time and is subject to the licensee’s
ability to maintain the condition that
the acceptance criteria are met. If the
VerDate Sep<11>2014
18:57 Nov 21, 2017
Jkt 244001
staff receives new information that
suggests the staff’s determination on any
of these ITAAC is incorrect, then the
staff will determine whether to reopen
that ITAAC (including withdrawing the
staff’s determination on that ITAAC).
The NRC staff’s determination will be
used to support a subsequent finding,
pursuant to 10 CFR 52.103(g), at the end
of construction that all acceptance
criteria in the combined license are met.
The ITAAC closure process is not
finalized for these ITAAC until the NRC
makes an affirmative finding under 10
CFR 52.103(g). Any future updates to
the status of these ITAAC will be
reflected on the NRC’s Web site at
https://www.nrc.gov/reactors/newreactors/oversight/itaac.html.
This notice fulfills the staff’s
obligations under 10 CFR 52.99(e)(1) to
publish a notice in the Federal Register
of the NRC staff’s determination of the
successful completion of inspections,
tests and analyses.
Vogtle Electric Generating Plant Unit 3,
Docket No. 5200025
A complete list of the review status
for VEGP Unit 3 ITAAC, including the
submission date and ADAMS Accession
Number for each ICN received, the
ADAMS Accession Number for each
VEF, and the ADAMS Accession
Numbers for the inspection reports
associated with these specific ITAAC,
can be found on the NRC’s Web site at
https://www.nrc.gov/reactors/newreactors/new-licensing-files/vog3icnsr.pdf.
Vogtle Electric Generating Plant Unit 4,
Docket No. 5200026
A complete list of the review status
for VEGP Unit 4 ITAAC, including the
submission date and ADAMS Accession
Number for each ICN received, the
ADAMS Accession No. for each VEF,
and the ADAMS Accession Numbers for
the inspection reports associated with
these specific ITAAC, can be found on
the NRC’s Web site at https://
www.nrc.gov/reactors/new-reactors/
new-licensing-files/vog4-icnsr.pdf.
Dated at Rockville, Maryland, this 17th day
of November, 2017.
For the Nuclear Regulatory Commission.
Jennifer L. Dixon-Herrity,
Chief, Licensing Branch 4, Division of New
Reactor Licensing, Office of New Reactors.
[FR Doc. 2017–25298 Filed 11–21–17; 8:45 am]
BILLING CODE 7590–01–P
PO 00000
Frm 00107
Fmt 4703
Sfmt 4703
55659
POSTAL REGULATORY COMMISSION
[Docket No. CP2018–55]
New Postal Product
Postal Regulatory Commission.
Notice.
AGENCY:
ACTION:
The Commission is noticing a
recent Postal Service filing for the
Commission’s consideration concerning
a negotiated service agreement. This
notice informs the public of the filing,
invites public comment, and takes other
administrative steps.
DATES: Comments are due: November
28, 2017.
ADDRESSES: Submit comments
electronically via the Commission’s
Filing Online system at https://
www.prc.gov. Those who cannot submit
comments electronically should contact
the person identified in the FOR FURTHER
INFORMATION CONTACT section by
telephone for advice on filing
alternatives.
FOR FURTHER INFORMATION CONTACT:
David A. Trissell, General Counsel, at
202–789–6820.
SUPPLEMENTARY INFORMATION:
SUMMARY:
Table of Contents
I. Introduction
II. Docketed Proceeding(s)
I. Introduction
The Commission gives notice that the
Postal Service filed request(s) for the
Commission to consider matters related
to negotiated service agreement(s). The
request(s) may propose the addition or
removal of a negotiated service
agreement from the market dominant or
the competitive product list, or the
modification of an existing product
currently appearing on the market
dominant or the competitive product
list.
Section II identifies the docket
number(s) associated with each Postal
Service request, the title of each Postal
Service request, the request’s acceptance
date, and the authority cited by the
Postal Service for each request. For each
request, the Commission appoints an
officer of the Commission to represent
the interests of the general public in the
proceeding, pursuant to 39 U.S.C. 505
(Public Representative). Section II also
establishes comment deadline(s)
pertaining to each request.
The public portions of the Postal
Service’s request(s) can be accessed via
the Commission’s Web site (https://
www.prc.gov). Non-public portions of
the Postal Service’s request(s), if any,
can be accessed through compliance
with the requirements of 39 CFR
3007.40.
E:\FR\FM\22NON1.SGM
22NON1
Agencies
[Federal Register Volume 82, Number 224 (Wednesday, November 22, 2017)]
[Notices]
[Pages 55658-55659]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-25298]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 52-025 and 52-026; NRC-2008-0252]
Southern Nuclear Operating Company, Inc., Vogtle Electric
Generating Plant, Units 3 and 4, Inspections, Tests, Analyses, and
Acceptance Criteria
AGENCY: Nuclear Regulatory Commission.
ACTION: Determination of the successful completion of inspections,
tests, and analyses.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has
determined that the inspections, tests, and analyses have been
successfully completed, and that the specified acceptance criteria are
met for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4.
DATES: The applicable date for determining successful completion of
inspections, tests, and analyses for VEGP Units 3 and 4 is November 22,
2017.
ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0252. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The
ADAMS accession number for each document referenced (if it is available
in ADAMS) is provided the first time that it is mentioned in this
document.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Chandu Patel, Office of New Reactors,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001;
telephone: 301-415-3025; email: Chandu.Patel@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Licensee Notification of Completion of ITAAC
Southern Nuclear Operating Company, Inc. (SNC), Georgia Power
Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC., MEAG
Power SPVJ, LLC., MEAG Power SPVP, LLC., and the City of Dalton,
[[Page 55659]]
Georgia, (hereafter called the licensee) has submitted inspections,
tests, analyses, and acceptance criteria (ITAAC) closure notifications
(ICNs) under Sec. 52.99(c)(1) of title 10 of the Code of Federal
Regulations (10 CFR), informing the NRC that the licensee has
successfully performed the required inspections, tests, and analyses,
and that the acceptance criteria are met for:
VEGP Unit 3 ITAAC
2.1.02.08a.i (28), 2.1.02.08d.iii (34), 2.2.04.08a.i (235),
2.2.04.08a.ii (236), 2.5.01.03d (514), 2.5.02.07a (534), 2.5.02.07d
(537), 2.5.02.07e (538), 2.5.02.14 (553), C.2.6.12.06 (676), 3.2.00.01a
(739), and 3.2.00.01b (740)
VEGP Unit 4 ITAAC
2.1.02.08a.i (28), 2.1.02.08d.iii (34), 2.5.01.03d (514), 2.5.02.07a
(534), 2.5.02.07d (537), 2.5.02.07e (538), 2.5.02.14 (553), 3.2.00.01a
(739), and 3.2.00.01b (740)
The ITAAC for VEGP Unit 3 are in Appendix C of the VEGP Unit 3
combined license (ADAMS Accession No. ML14100A106). The ITAAC for VEGP
Unit 4 are in Appendix C of VEGP Unit 4 combined license (ADAMS
Accession No. ML14100A135).
II. NRC Staff Determination of Completion of ITAAC
The NRC staff has determined that the specified inspections, tests,
and analyses have been successfully completed, and that the specified
acceptance criteria are met. The documentation of the NRC staff's
determination is in the ITAAC Closure Verification Evaluation Form
(VEF) for each ITAAC. The VEF is a form that represents the NRC staff's
structured process for reviewing ICNs. Each ICN presents a narrative
description of how the ITAAC was completed. The NRC's ICN review
process involves a determination on whether, among other things: (1)
Each ICN provides sufficient information, including a summary of the
methodology used to perform the ITAAC, to demonstrate that the
inspections, tests, and analyses have been successfully completed; (2)
each ICN provides sufficient information to demonstrate that the
acceptance criteria of the ITAAC are met; and (3) any NRC inspections
for the ITAAC have been completed and any ITAAC findings associated
with that ITAAC have been closed.
The NRC staff's determination of the successful completion of these
ITAAC is based on information available at this time and is subject to
the licensee's ability to maintain the condition that the acceptance
criteria are met. If the staff receives new information that suggests
the staff's determination on any of these ITAAC is incorrect, then the
staff will determine whether to reopen that ITAAC (including
withdrawing the staff's determination on that ITAAC). The NRC staff's
determination will be used to support a subsequent finding, pursuant to
10 CFR 52.103(g), at the end of construction that all acceptance
criteria in the combined license are met. The ITAAC closure process is
not finalized for these ITAAC until the NRC makes an affirmative
finding under 10 CFR 52.103(g). Any future updates to the status of
these ITAAC will be reflected on the NRC's Web site at https://www.nrc.gov/reactors/new-reactors/oversight/itaac.html.
This notice fulfills the staff's obligations under 10 CFR
52.99(e)(1) to publish a notice in the Federal Register of the NRC
staff's determination of the successful completion of inspections,
tests and analyses.
Vogtle Electric Generating Plant Unit 3, Docket No. 5200025
A complete list of the review status for VEGP Unit 3 ITAAC,
including the submission date and ADAMS Accession Number for each ICN
received, the ADAMS Accession Number for each VEF, and the ADAMS
Accession Numbers for the inspection reports associated with these
specific ITAAC, can be found on the NRC's Web site at https://www.nrc.gov/reactors/new-reactors/new-licensing-files/vog3-icnsr.pdf.
Vogtle Electric Generating Plant Unit 4, Docket No. 5200026
A complete list of the review status for VEGP Unit 4 ITAAC,
including the submission date and ADAMS Accession Number for each ICN
received, the ADAMS Accession No. for each VEF, and the ADAMS Accession
Numbers for the inspection reports associated with these specific
ITAAC, can be found on the NRC's Web site at https://www.nrc.gov/reactors/new-reactors/new-licensing-files/vog4-icnsr.pdf.
Dated at Rockville, Maryland, this 17th day of November, 2017.
For the Nuclear Regulatory Commission.
Jennifer L. Dixon-Herrity,
Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of
New Reactors.