Nuclear Regulatory Commission October 13, 2011 – Federal Register Recent Federal Regulation Documents

Omaha Public Power District; Fort Calhoun Station, Unit 1; Exemption
Document Number: 2011-26488
Type: Notice
Date: 2011-10-13
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes
Document Number: 2011-26472
Type: Notice
Date: 2011-10-13
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is requesting public comment on chapters 1-6 of Draft Interim Staff Guidance (ISG), NPR-ISG-2011-002, that augments NUREG-1537, part 1, ``Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Format and Content,'' for the Production of Radioisotopes and NUREG-1537, part 2, ``Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Standard Review Plan and Acceptance Criteria,'' for the Production of Radioisotopes (chapters 7-18 of the ISG will be published in a future Federal Register notice). This ISG provides guidance to potential applicants for preparing an application to obtain a construction and operating license for a radioisotope production facility and the Research and Test Reactor Licensing Branch (PRLB) of the Division of Policy and Rulemaking (DPR) and the Office of Nuclear Reactor Regulation (NRR) on the information that should be included in such application.
Final Division of Safety Systems Interim Staff Guidance DSS-ISG-2010-01: Staff Guidance Regarding the Nuclear Criticality Safety Analysis for Spent Fuel Pools
Document Number: 2011-26468
Type: Notice
Date: 2011-10-13
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing the final Division of Safety Systems Interim Staff Guidance, (DSS-ISG) DSS- ISG-2010-01, ``Staff Guidance Regarding the Nuclear Criticality Safety Analysis for Spent Fuel Pools.'' This DSS-ISG provides updated guidance to the NRC staff reviewer to address the increased complexity of recent spent fuel pool (SFP) license application analyses and operations. The guidance is intended to reiterate existing guidance, clarify ambiguity in existing guidance, and identify lessons learned based on recent submittals.
Omaha Public Power District, Fort Calhoun Station, Unit 1; Exemption
Document Number: 2011-26466
Type: Notice
Date: 2011-10-13
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: 2011-26462
Type: Notice
Date: 2011-10-13
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: NRC Form 313, ``Application for Materials License'' and NRC Forms 313A (RSO), 313A (AMP), 313A (ANP), 313A (AUD), 313A (AUT), and 313A (AUS). 2. Current OMB approval number: 3150-0120. 3. How often the collection is required: There is a one-time submittal of the NRC Form 313 (which may include the NRC Form 313A series of forms) with information to receive a license. Once a specific license has been issued, there is a 10-year resubmittal of the NRC Form 313 (which may include the NRC form 313A series of forms) with information for renewal of the license. Amendment requests are submitted as needed by the licensee. There is a one-time submittal for all limited specific medical use applicants of a NRC Form 313A series form to have each new individual identified as a Radiation Safety Officer (RSO), authorized medical physicist (AMP), authorized nuclear pharmacist (ANP), or authorized user or a subsequent submittal of additional information for one of these individuals to be identified with a new authorization on a limited specific medical use license. NRC Form 313A (RSO) is also used by medical broad scope licensees when identifying a new individual as an RSO or adding an additional RSO authorization for the individual. This submittal may occur when applying for a new license, amendment, or renewal. NRC Form 313A (ANP) is also used by commercial nuclear pharmacy licensees when requesting an individual be identified for the first time as ANP. This submittal may occur when applying for a new license, amendment, or renewal. 4. Who is required or asked to report: All applicants requesting a license, amendment or renewal of a license for byproduct or source material. 5. The number of annual respondents: 19,432 (2,362 NRC licensees and 17,070 Agreement State licensees). 6. The number of hours needed annually to complete the requirement or request: 83,558 hours (10,157 NRC and 73,401 Agreement State hours). 7. Abstract: Applicants must submit NRC Form 313, which may include the six forms in the 313A series, to obtain a specific license to possess, use, or distribute byproduct or source material. These six forms in the 313A series are: (1) NRC Form 313A (RSO), ``Radiation Safety Officer Training and Experience and Preceptor Attestation;'' (2) NRC Form 313A (AMP), ``Authorized Medical Physicist Training and Experience and Preceptor Attestation;'' (3) NRC Form 313A (ANP), ``Authorized Nuclear Pharmacist Training and Experience and Preceptor Attestation;'' (4) NRC Form 313A (AUD), ``Authorized User Training and Experience and Preceptor Attestation (for uses defined under 35.100, 35.200, and 35.500);'' (5) NRC Form 313A (AUT), ``Authorized User Training and Experience and Preceptor Attestation (for uses defined under 35.300);'' and (6) NRC Form 313A (AUS), ``Authorized User Training and Experience and Preceptor Attestation (for uses defined under 35.400 and 35.600).'' The information is reviewed by the NRC to determine whether the applicant is qualified by training and experience, and has equipment, facilities, and procedures which are adequate to protect the public health and safety, and minimize danger to life or property. Submit, by December 12, 2011, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? The public may examine and have copied for a fee publicly available documents, including the draft supporting statement, at the NRC's Public Document Room, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. OMB clearance requests are available at the NRC Web site: https://www.nrc.gov/public-involve/doc- comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC- 2011-0227. You may submit your comments by any of the following methods. Electronic comments: Go to https://www.regulations.gov and search for Docket No. NRC-2011-0227. Mail comments to NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by telephone at 301-415-6258, or by e-mail to INFOCOLLECTS.Resource@NRC.GOV.
Design-Basis Hurricane and Hurricane Missiles for Nuclear Power Plants
Document Number: 2011-26420
Type: Rule
Date: 2011-10-13
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing a new regulatory guide, (RG) 1.221, ``Design-Basis Hurricane and Hurricane Missiles for Nuclear Power Plants.'' This regulatory guide provides licensees and applicants with new guidance that the staff of the NRC considers acceptable for use in selecting the design- basis hurricane and design-basis hurricane-generated missiles that a nuclear power plant should be designed to withstand to prevent undue risk to the health and safety of the public.
Event Reporting Guidelines
Document Number: 2011-26419
Type: Proposed Rule
Date: 2011-10-13
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is requesting comments on Draft NUREG-1022, Revision 3, ``Event Reporting Guidelines: 10 CFR 50.72 and 50.73''. The NUREG-1022 contains guidelines that the NRC staff considers acceptable for use in meeting the event reporting requirements for operating nuclear power reactors. Revision 3 to NUREG-1022 incorporates revisions to the guidelines for the purpose of clarification.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.