Environmental Protection Agency November 30, 2018 – Federal Register Recent Federal Regulation Documents
Results 1 - 11 of 11
Registration Review; Draft Human Health and/or Ecological Risk Assessments for Several Pesticides; Notice of Availability
This notice announces the availability of EPA's draft human health and ecological risk assessments for the registration review of amitraz, bispyribac-sodium, bromoxynil, captan, chloropicrin, dazomet, diclosulam, florasulam, flucarbazone-sodium, fluroxypyr, formetanate, imazalil, imazamox, imazapic, imazaquin, imazethapyr, MCPA, metam sodium, metam potassium, methyl isothiocyanate (MITC), o-benzyl-p- chlorophenol, starlicide, tri-n butyl tetradecyl phosphonium chloride (TTPC), triphenyltin hydroxide (TPTH), and zinc salts. This notice also announces the availability of EPA's draft human health risk assessments for the registration review of para-dichlorobenzene and penoxsulam.
TSCA Science Advisory Committee on Chemicals (SACC); Notice of Public Meetings
This notice announces the peer review of the draft Risk Evaluation for Colour Index (C.I.) Pigment Violet 29 (PV29) and associated documents developed under EPA's existing chemical substance process under the Toxic Substances Control Act (TSCA). The peer review panel deliberations will be conducted during a 4-day, in-person, public meeting of the TSCA Science Advisory Committee on Chemicals (SACC). This in-person meeting will also include a general TSCA orientation for the TSCA SACC. A portion of the in-person meeting will be closed to the public for the committee's discussion of information claimed as confidential business information (CBI). Prior to the in-person meeting, there will be a public, 2-hour preparatory virtual meeting to consider the scope and clarity of the draft charge questions for this peer review. During these upcoming meetings, the public is invited to provide oral comments for the peer review on the draft risk evaluation for PV29 and related documents. Comments on the draft charge questions will be accepted prior to and during the 2-hour preparatory virtual meeting. The TSCA SACC peer review panel will consider these comments during their discussions.
Standards of Performance for New Residential Wood Heaters, New Residential Hydronic Heaters and Forced-Air Furnaces
In this action, the EPA proposes to amend the 2015 New Source Performance Standards (NSPS) for new residential hydronic heaters and new forced-air furnaces by adding a two-year ``sell-through'' period for all affected new hydronic heaters and forced-air furnaces that are manufactured or imported before the May 2020 compliance date to be sold at retail through May 2022. This will allow retailers additional time, after the May 2020 effective date of the ``Step 2'' standards, for the sale of ``Step 1'' compliant hydronic heaters and forced-air furnaces remaining in inventory. The EPA is also taking comment on whether a sell-through period for all affected new residential wood heaters is appropriate following the May 2020 compliance date and, if so, how long a sell-through period is needed and why. In addition, this action is taking comment on whether the current minimum pellet fuel requirements should be retained and, if so, whether they should be revised.
Standards of Performance for New Residential Wood Heaters, New Residential Hydronic Heaters and Forced-Air Furnaces
In this action, the Environmental Protection Agency (EPA) is soliciting comment on several aspects of the 2015 Standards of Performance for New Residential Wood Heaters, New Residential Hydronic Heaters and Forced-Air Furnaces (2015 NSPS) in order to inform future rulemaking to improve these standards and related test methods. This action does not propose any changes to the 2015 NSPS, but does take comment on a number of aspects of the rule, including the compliance date for the Step 2 emission limits, Step 2 emission limits for forced- air furnaces, hydronic heaters and wood heaters, Step 2 emission limits based on weighted averages versus individual burn rates, transitioning to cord wood certification test methods, compliance audit testing, third-party review, electronic reporting tool, and warranty requirements.
Information Collection Request Submitted To OMB for Review and Approval; Comment Request; NESHAP for Industrial, Commercial, and Institutional Boilers and Process Heaters (Renewal)
The Environmental Protection Agency (EPA) has submitted an information collection request (ICR), NESHAP for Industrial, Commercial, and Institutional Boilers and Process Heaters (EPA ICR No. 2028.09, OMB Control No. 2060-0551), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through November 30, 2018. Public comments were previously requested, via the Federal Register, on June 29, 2017, during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Approval and Promulgation of Implementation Plans; Arkansas; Approval of Regional Haze State Implementation Plan Revision and Partial Withdrawal of Federal Implementation Plan
Pursuant to the Federal Clean Air Act (CAA or the Act), the Environmental Protection Agency (EPA) is proposing to approve a portion of the revision to the Arkansas State Implementation Plan (SIP) that addresses certain requirements of the CAA and the EPA's regional haze rules for the protection of visibility in mandatory Class I Federal areas (Class I areas) for the first implementation period. The EPA is proposing to approve the portions of the SIP revision addressing the best available retrofit technology (BART) requirements for sulfur dioxide (SO2), particulate matter (PM) and nitrogen oxide (NOX) for seven electric generating units (EGUs) in Arkansas. The EPA is also proposing to approve the determination that no additional controls at any Arkansas sources are necessary under reasonable progress; calculation of the revised reasonable progress goals (RPGs) for Arkansas' Class I areas; certain components of the long-term strategy for making reasonable progress; the clarification that both the 6A and 9A Boilers at the Georgia-Pacific Crossett Mill are BART-eligible; and the additional information and technical analysis in support of the determination that the Georgia-Pacific Crossett Mill 6A and 9A Boilers are not subject to BART. In conjunction with our proposed approval of portions of the SIP revision, we are proposing to withdraw the corresponding federal implementation plan (FIP) provisions established in a prior action to address regional haze requirements for Arkansas.
Revisions to California State Implementation Plan; South Coast Air Quality Management District; Stationary Source Permits
The Environmental Protection Agency (EPA) is finalizing action on a revision to the South Coast Air Quality Management District (SCAQMD or District) portion of the California State Implementation Plan (SIP). We are finalizing a conditional approval of one rule governing issuance of permits for stationary sources, including review and permitting of major sources and major modifications under part D of title I of the Clean Air Act (CAA). Specifically, the revision pertains to SCAQMD Rule 1325Federal PM2.5 New Source Review Program.
Safe Management of Recalled Airbags
The Environmental Protection Agency (EPA) is issuing this interim final rule in response to the urgent public health issue posed by recalled Takata airbag inflators still installed in vehicles. With this rule, EPA is facilitating a more expedited removal of defective Takata airbag inflators from vehicles by dealerships, salvage yards and other locations for safe and environmentally sound disposal by exempting the collection of airbag waste from hazardous waste requirements so long as certain conditions are met. The Agency is also seeking comment on this interim final rule.
Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Plating and Polishing Area Sources (Renewal)
The Environmental Protection Agency (EPA) has submitted an information collection request (ICR), NESHAP for Plating and Polishing Area Sources (EPA ICR Number 2294.05, OMB Control Number 2060-0623), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through November 30, 2018. Public comments were previously requested, via the Federal Register, on June 29, 2017 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Friction Materials Manufacturing (Renewal)
The Environmental Protection Agency (EPA) has submitted an information collection request (ICR)NESHAP for Friction Materials Manufacturing (EPA ICR Number 2025.07, OMB Control Number 2060-0481) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through August 31, 2018. Public comments were requested previously, via the Federal Register on June 29, 2017 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.