Environmental Protection Agency April 17, 2015 – Federal Register Recent Federal Regulation Documents

Establishment of a New System of Records Notice for the Superfund Enterprise Management System
Document Number: 2015-08926
Type: Notice
Date: 2015-04-17
Agency: Environmental Protection Agency
The U.S. Environmental Protections Agency's (EPA) Office of Solid Waste and Emergency Response, Office of Superfund Remediation and Technology Innovation (OSRTI), is giving notice that it proposes to create a new system of records pursuant to the provisions of the Privacy Act of 1974 (5 U.S.C. 552(a)). The EPA is implementing the Superfund Enterprise Management System (SEMS) system of records to provide project and program managers the ability to plan, manage, track and report on clean-up and enforcement activities taking place at Superfund sites. SEMS represents a joint development and ongoing collaboration between Superfund's Remedial, Removal, Federal Facilities, Enforcement, and Emergency Response programs.
Environmental Impact Statements; Notice of Availability
Document Number: 2015-08924
Type: Notice
Date: 2015-04-17
Agency: Environmental Protection Agency
Notice of Issuance of a Federal Operating Permit for G&K Services Inc.-Green Bay
Document Number: 2015-08910
Type: Notice
Date: 2015-04-17
Agency: Environmental Protection Agency
This notice announces that on March 23, 2015, pursuant to title V of the Clean Air Act, the Environmental Protection Agency (EPA) issued a Federal operating permit to G&K Services, Inc., for G&K Services, Inc.Green Bay. The permit authorizes the operation of industrial washers, industrial dryers, a natural gas-fired boiler, a steam tunnel, and other processes used to clean and recondition soiled industrial towels.
Streptomycin Sulfate; Receipt of Application for Emergency Exemption, Solicitation of Public Comment
Document Number: 2015-08908
Type: Notice
Date: 2015-04-17
Agency: Environmental Protection Agency
EPA has received a specific exemption request from the Florida Department of Agriculture and Consumer Services (FDACS) to use the pesticide streptomycin sulfate (CAS No. 3810-74-0) to treat up to 47,656 acres of grapefruit for fresh market to control citrus canker. The FDACS proposes a use of a pesticide which contains the active ingredient, streptomycin sulfate, also used in human and animal treatment as an antibiotic. EPA is soliciting public comment before making the decision whether or not to grant the exemption.
Approval and Promulgation of Implementation Plans; Idaho: Interstate Transport of Fine Particulate Matter
Document Number: 2015-08893
Type: Rule
Date: 2015-04-17
Agency: Environmental Protection Agency
On June 28, 2010, the State of Idaho submitted a State Implementation Plan (SIP) revision to the Environmental Protection Agency (EPA) to address certain interstate transport requirements of the Clean Air Act (CAA). The EPA finds that the Idaho SIP meets the CAA interstate transport requirements that the SIP contain adequate provisions prohibiting air emissions that will contribute significantly to nonattainment or interfere with maintenance of the 2006 24-hour PM2.5 NAAQS in any other state.
Approval and Promulgation of Air Quality Implementation Plans; Michigan; SO2
Document Number: 2015-08889
Type: Proposed Rule
Date: 2015-04-17
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing to approve a request by the Michigan Department of Environmental Quality (MDEQ) submitted on February 14, 2014, and supplemented on October 27, 2014, to revise the Michigan state implementation plan (SIP) to incorporate sulfur dioxide (SO2) limits found in ``Part 4: Emissions Limitations and ProhibitionsSulfur Bearing Compounds'' of Michigan's Air Pollution Control Rules. EPA is proposing to take no action on the provisions pertaining to the Federal Clean Air Interstate Rule (CAIR) SO2 trading program because CAIR is no longer in effect.
Approval and Promulgation of Air Quality Implementation Plans; Michigan; SO2
Document Number: 2015-08888
Type: Rule
Date: 2015-04-17
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is approving a request by the Michigan Department of Environmental Quality (MDEQ) submitted on February 14, 2014, and supplemented on October 27, 2014, to revise the Michigan state implementation plan (SIP) to incorporate sulfur dioxide (SO2) limits found in Michigan's Air Pollution Control Rules at Chapter 336, Part 4, ``Emissions Limitations and ProhibitionsSulfur Bearing Compounds.'' EPA will take no action on the provisions pertaining to the Federal Clean Air Interstate Rule (CAIR) SO2 trading program because CAIR is no longer in effect.
Approval and Promulgation of Air Quality Implementation Plans; Indiana; CO Monitoring
Document Number: 2015-08886
Type: Proposed Rule
Date: 2015-04-17
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing to approve a revision to Indiana's monitoring requirements as a revision to the State Implementation Plan (SIP). The SIP revision was submitted by Indiana to EPA on January 22, 2014. Once approved, the SIP would authorize emission units that combust sewage sludge to continuously monitor carbon monoxide emissions, consistent with Federal requirements.
Approval and Promulgation of Air Quality Implementation Plans; Indiana; CO Monitoring
Document Number: 2015-08885
Type: Rule
Date: 2015-04-17
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is approving a revision to Indiana's monitoring requirements as a revision to the State Implementation Plan (SIP). The SIP revision was submitted by Indiana to EPA on January 22, 2014. Once approved, the SIP would authorize emission units that combust sewage sludge to continuously monitor carbon monoxide emissions, consistent with Federal requirements.
Approval and Promulgation of Implementation Plans; Alabama: Non-Interference Demonstration for Federal Low-Reid Vapor Pressure Requirement for the Birmingham Area
Document Number: 2015-08884
Type: Rule
Date: 2015-04-17
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is approving the State of Alabama's November 14, 2014, State Implementation Plan (SIP) revision, submitted through the Alabama Department of Environmental Management (ADEM), in support of the State's request that EPA change the Federal Reid Vapor Pressure (RVP) requirements for Jefferson and Shelby Counties (hereinafter referred to as the ``Birmingham Area'' or ``Area''). Alabama's November 14, 2014, SIP revision evaluates whether changing the Federal RVP requirements in this Area would interfere with the Area's ability to meet the requirements of the Clean Air Act (CAA or Act). Specifically, Alabama's SIP revision concludes that relaxing the Federal RVP requirement from 7.8 pounds per square inch (psi) to 9.0 psi for gasoline sold between June 1 and September 15 of each year in the Area would not interfere with attainment or maintenance of the national ambient air quality standards (NAAQS) or with any other CAA requirement. EPA has determined that Alabama's November 14, 2014, SIP revision is consistent with the CAA.
Approval and Promulgation of Air Quality Implementation Plans; Arizona; Regional Haze Federal Implementation Plan; Reconsideration
Document Number: 2015-08883
Type: Rule
Date: 2015-04-17
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking final action to revise certain provisions in the Arizona Regional Haze (RH) Federal Implementation Plan (FIP) that apply to the Nelson Lime Plant. In response to a request for reconsideration from the plant's owner, Lhoist North America of Arizona, Inc. (LNA), we are replacing the control technology demonstration requirements for emissions of nitrogen oxides (NOX) applicable to Kilns 1 and 2 at the Nelson Lime Plant with revised recordkeeping and reporting requirements. We are not revising any of the emission limits that apply to these units, including the existing NOX emission limits, which can be met with selective non-catalytic reduction (SNCR) control technology. We also are taking final action to correct a misprint of the regulatory requirements in a table in the Arizona RH FIP that identifies the emission limits for NOX and sulfur dioxide (SO2) at each kiln.
New York State Prohibition of Discharges of Vessel Sewage; Proposed Determination
Document Number: 2015-08807
Type: Notice
Date: 2015-04-17
Agency: Environmental Protection Agency
By petition dated May 19, 2014 and submitted pursuant to 33 CFR 1322(f)(3) and 40 CFR 140.4(a), the State of New York certified that the protection and enhancement of the waters of Seneca Lake, Cayuga Lake, the Seneca River and tributaries thereto requires greater environmental protection than the applicable Federal standards provide and petitioned the Environmental Protection Agency (EPA), Region 2, for a determination that adequate facilities for the safe and sanitary removal and treatment of sewage from all vessels are reasonably available for those waters, so that the State may completely prohibit the discharge from all vessels of any sewage, whether treated or not, into such waters. Upon consideration of the petition, EPA proposes to make the requested determination and hereby invites the public to comment on the proposed determination.
Carbofuran; Reinstatement of Specific Tolerances and Removal of Expired Tolerances
Document Number: 2015-08784
Type: Rule
Date: 2015-04-17
Agency: Environmental Protection Agency
EPA is amending its regulations to reinstate four import tolerances for carbofuran, in order to comply with a DC Circuit decision and order vacating the Agency's revocation of those tolerances. EPA is also removing several carbofuran time-limited tolerances that have already expired. Because this action is being taken to conform the regulations to the court's order and to accurately reflect the current legal status of these tolerances, EPA is issuing this as a final order that is effective upon publication.
Reopening of Public Comment Period for Proposed Action; Texas; Revisions to the New Source Review State Implementation Plan; Flexible Permit Program
Document Number: 2015-08662
Type: Proposed Rule
Date: 2015-04-17
Agency: Environmental Protection Agency
On December 31, 2014, the Environmental Protection Agency (EPA) published in the Federal Register a proposed rule to fully approve the Texas New Source Review (NSR) State Implementation Plan (SIP) for establishing the Flexible Permit Program and requested comment by January 30, 2015. The EPA is reopening the original public comment period of 30 days for the proposed rule for an additional 30 days from the date of publication. The reopening is necessary because we neglected to include certain supporting materials in the electronic docket. All previously submitted comments will be responded to as appropriate, and members of the public who have submitted comments during the prior comment period need not resubmit them at this time.
Hazardous and Solid Waste Management System; Disposal of Coal Combustion Residuals From Electric Utilities
Document Number: 2015-00257
Type: Rule
Date: 2015-04-17
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA or the Agency) is publishing a final rule to regulate the disposal of coal combustion residuals (CCR) as solid waste under subtitle D of the Resource Conservation and Recovery Act (RCRA). The available information demonstrates that the risks posed to human health and the environment by certain CCR management units warrant regulatory controls. EPA is finalizing national minimum criteria for existing and new CCR landfills and existing and new CCR surface impoundments and all lateral expansions consisting of location restrictions, design and operating criteria, groundwater monitoring and corrective action, closure requirements and post closure care, and recordkeeping, notification, and internet posting requirements. The rule requires any existing unlined CCR surface impoundment that is contaminating groundwater above a regulated constituent's groundwater protection standard to stop receiving CCR and either retrofit or close, except in limited circumstances. It also requires the closure of any CCR landfill or CCR surface impoundment that cannot meet the applicable performance criteria for location restrictions or structural integrity. Finally, those CCR surface impoundments that do not receive CCR after the effective date of the rule, but still contain water and CCR will be subject to all applicable regulatory requirements, unless the owner or operator of the facility dewaters and installs a final cover system on these inactive units no later than three years from publication of the rule. EPA is deferring its final decision on the Bevill Regulatory Determination because of regulatory and technical uncertainties that cannot be resolved at this time.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.