Federal Railroad Administration September 2011 – Federal Register Recent Federal Regulation Documents
Results 1 - 13 of 13
Program for Capital Grants for Rail Line Relocation and Improvement Projects
This notice details the application requirements and procedures for obtaining funding for eligible rail line relocation and improvement projects. The opportunities described in this notice are available under Catalog of Federal Domestic Assistance (CFDA) number 20.320. Notice to Applicants: FRA recommends applicants read this notice in its entirety prior to preparing application materials. There are several administrative prerequisites that applicants must comply with in order to submit an application (see Section 4 of this notice). Additionally, applicants should note that the required Project Narrative/Statement of Work component of the application package may not exceed 35 pages in length. Failure to adhere to this page limitation may result in the application being removed from consideration for award.
Track Safety Standards; Concrete Crossties
This document responds to petitions for reconsideration of FRA's final rule published on April 1, 2011, mandating specific requirements for effective concrete crossties, for rail fastening systems connected to concrete crossties, and for automated inspections of track constructed with concrete crossties. This document amends and clarifies the final rule.
Notice of the Extension of the Comment Period for the Draft Environmental Impact Report/Environmental Impact Statement for the California High-Speed Train Project Fresno to Bakersfield Section
FRA is issuing this notice to advise the public that the comment period for the Draft Environmental Impact Report (EIR)/ Environmental Impact Statement (EIS) that has been prepared for the California High-Speed Train (HST) Project Fresno to Bakersfield Section (Project) has been extended and shall now end on October 13, 2011. This decision was made by the Authority and FRA in response to requests for an extension of the comment period. FRA is the lead federal agency and the California High-Speed Rail Authority (Authority) is the lead state agency for the environmental review process. The Authority plans to construct and operate a fully grade- separated, dedicated double-track, electric powered, passenger rail, high-speed railroad along a 114-mile corridor between Fresno and Bakersfield, CA. The Project includes stations in downtown Fresno and Bakersfield, and a possible Kings/Tulare Regional Station east of Hanford, CA. A heavy maintenance facility for assembly, testing, and commissioning of trains, train inspection and service, and train overhaul may be constructed in the Fresno to Bakersfield Section. The Draft EIR/EIS presents the Project's purpose and need, identifies all reasonable alternatives including track alignments, stations, and heavy maintenance facilities as well as the no action alternative, describes the affected environment, analyzes the potential environmental impacts of all the reasonable alternatives and the no action alternative, and identifies appropriate mitigation measures to minimize the potential environmental impacts.
Notice of the Extension of the Comment Period for the Draft Environmental Impact Report/Environmental Impact Statement for the California High-Speed Rail Project Merced to Fresno Section
FRA is issuing this notice to advise the public that the comment period for the Draft Environmental Impact Report (EIR)/ Environmental Impact Statement (EIS) that has been prepared for the California High-Speed Train (HST) Project Merced to Fresno Section (Project) has been extended and shall now end on October 13, 2011. This decision was made by the Authority and FRA in response to requests for extension of the comment period. FRA is the lead federal agency and the California High-Speed Rail Authority (Authority) is the lead state agency for the environmental review process. The Authority proposes to construct and operate a reliable high- speed electric-powered passenger train system along an approximately 65-mile corridor, from Merced, CA, to Fresno, CA that links those cities by delivering predictable and consistent travel times. The Project includes high-speed track alignments, stations in downtown Merced and Fresno. A heavy maintenance facility for assembly, testing, and commissioning of trains, train inspection and service, and train overhaul may be constructed in the Merced to Fresno Section. The Draft EIR/EIS presents the Project's purpose and need, identifies all reasonable alternatives including track alignments, stations, and heavy maintenance facilities as well as the no action alternative, describes the affected environment, analyzes the potential environmental impacts of all the reasonable alternatives and the no action alternative, and identifies appropriate mitigation measures to minimize the potential environmental impacts.
Systems for Telephonic Notification of Unsafe Conditions at Highway-Rail and Pathway Grade Crossings
On March 4, 2011, FRA published a notice of proposed rulemaking that would require certain railroads to develop a system for telephonic notification of unsafe conditions at highway-rail and pathway grade crossings. FRA is announcing a public hearing to provide interested persons an opportunity to provide comments on the proposal and to discuss further development of the regulation. The Rail Safety Improvement Act of 2008 requires the development and implementation of these telephonic notification systems.
Proposed Agency Information Collection Activities; Comment Request
In accordance with the Paperwork Reduction Act of 1995 and its implementing regulations, the Federal Railroad Administration (FRA) hereby announces that it is seeking renewal of the following currently approved information collection activities. Before submitting these information collection requirements for clearance by the Office of Management and Budget (OMB), FRA is soliciting public comment on specific aspects of the activities identified below.
Alternate Passenger Rail Service Pilot Program
This NPRM is in response to a statutory mandate that FRA complete a rulemaking proceeding to develop a pilot program that permits a rail carrier or rail carriers that own infrastructure over which Amtrak operates certain passenger rail service routes to petition FRA to be considered as a passenger rail service provider over such a route in lieu of Amtrak for a period not to exceed five years after the date of enactment of the Passenger Rail Investment and Improvement Act of 2008. The proposed rule would develop this pilot program in conformance with the statutory directive.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.