Department of Transportation May 14, 2007 – Federal Register Recent Federal Regulation Documents
Results 1 - 8 of 8
Notice of Request for Extension of Currently Approved Information Collection
The FHWA has forwarded the information collection request described in this notice to the Office of Management and Budget (OMB) to renew an information collection. We published a Federal Register Notice with a 60-day public comment period on this information collection on February 26, 2007. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Revision of Class E Airspace; Port Heiden, AK
This action revises Class E airspace at Port Heiden, AK to provide adequate controlled airspace to contain aircraft executing Standard Instrument Approach Procedures (SIAPs). Two new Standard Instrument Approach Procedures (SIAPs) are being developed, and two procedures are being amended for the Port Heiden Airport. A Departure Procedure (DP) is also being amended. This action revises existing Class E airspace upward from 700 feet (ft.) and 1,200 ft. above the surface at Port Heiden Airport, Port Heiden, AK.
Revision of Class E Airspace; Kodiak, AK
This action revises Class E airspace at Kodiak, AK to provide adequate controlled airspace to contain aircraft executing Standard Instrument Approach Procedures (SIAPs). Four Standard Instrument Approach Procedures (SIAPs) are being amended for the Kodiak Airport. A Standard Instrument Departure (SID) and a Departure Procedure (DP) are also being amended. This action revises existing Class E airspace upward from the surface, from 700 feet (ft.) and 1,200 ft. above the surface at Kodiak Airport, Kodiak, AK.
Notice of Final Agency Actions on Proposed Highways in Colorado
This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(1)(1). The actions relate to various proposed highway projects in the State of Colorado. Those actions grant licenses, permits, and approvals for the projects.
Office of Hazardous Materials Safety; Notice of Delays in Processing of Special Permits Applications
In accordance with the requirements of 49 U.S.C. 5117(c), PHMSA is publishing the following list of special permit applications that have been in process for 180 days or more. The reason(s) for delay and the expected completion date for action on each application is provided in association with each identified application.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.