National Park Service – Federal Register Recent Federal Regulation Documents

Results 6,651 - 6,700 of 7,570
Notice of Inventory Completion: Alutiiq Museum and Archaeological Repository, Kodiak, AK
Document Number: E7-14583
Type: Notice
Date: 2007-07-30
Agency: Department of the Interior, National Park Service
Notice of Inventory Completion: Alutiiq Museum and Archaeological Repository, Kodiak, AK
Document Number: E7-14580
Type: Notice
Date: 2007-07-30
Agency: Department of the Interior, National Park Service
Notice of Inventory Completion: Alutiiq Museum and Archaeological Repository, Kodiak, AK
Document Number: E7-14577
Type: Notice
Date: 2007-07-30
Agency: Department of the Interior, National Park Service
Notice of Inventory Completion: Alutiiq Museum and Archaeological Repository, Kodiak, AK
Document Number: E7-14576
Type: Notice
Date: 2007-07-30
Agency: Department of the Interior, National Park Service
National Register of Historic Places; Notification of Pending Nominations and Related Actions
Document Number: E7-14138
Type: Notice
Date: 2007-07-23
Agency: Department of the Interior, National Park Service
Rocky Mountain National Park; Proposed Exchange of Federal Land for Non-Federal Land, All Within Larimer County, Colorado
Document Number: E7-13943
Type: Notice
Date: 2007-07-18
Agency: Department of the Interior, National Park Service
Pursuant to the authority contained in the Act of October 26, 2005 (Pub. L. 109-93, 119 Stat. 2104), the Secretary of the Interior has been authorized to acquire certain lands by exchange, and is authorized, upon completion of said exchange, to revise the boundaries of Rocky Mountain National Park accordingly.
National Register of Historic Places; Notification of Pending Nominations and Related Actions
Document Number: E7-13849
Type: Notice
Date: 2007-07-18
Agency: Department of the Interior, National Park Service
Flight 93 National Memorial Advisory Commission
Document Number: 07-3488
Type: Notice
Date: 2007-07-18
Agency: Department of the Interior, National Park Service
This notice sets forth the date of the July 28, 2007 meeting of the Flight 93 Advisory Commission.
Resource Protection Study, Draft Environmental Impact Statement, Curecanti National Recreation Area, CO
Document Number: 07-3487
Type: Notice
Date: 2007-07-17
Agency: Department of the Interior, National Park Service
Pursuant to the National Environmental Policy Act of 1969, 42 U.S.C. 4332(2)(C), the National Park Service announces the availability of a Draft Environmental Impact Statement for the Resource Protection Study for Curecanti National Recreation Area, Colorado.
Temporary Concession Contract for Great Sand Dunes National Park and Preserve, CO
Document Number: 07-3449
Type: Notice
Date: 2007-07-16
Agency: Department of the Interior, National Park Service
Pursuant to 36 CFR 51.24, public notice is hereby given that the National Park Service proposes to award a temporary concession contract for the sale of firewood and incidental visitor items within Great Sand Dunes National Park and Preserve, Colorado, for a term not to exceed 2 years and 8 months, from May 1, 2007 through December 31, 2009. This action is necessary to avoid an interruption of visitor services.
30-Day Notice of Submission of Study Package to the Office of Management and Budget; Opportunity for Public Comment (OMB # 1024-0236)
Document Number: 07-3448
Type: Notice
Date: 2007-07-16
Agency: Department of the Interior, National Park Service
Under provisions of the Paperwork Reduction Act of 1995 [44 U.S.C. 3507(a)(1)(D)] and 5 CFR part 1320, Reporting and Record Keeping Requirements, the National Park Service (NPS) invites public comments on a revision of a currently approved collection of information (OMB 1024-0236). The 30-Day Federal Register Notice for this collection of information that was published on June 26, 2007 (Volume 72, Number 122, Pages 35065-35066), was published in error and should be recognized as an incorrect version. The correct publication of the 30-Day Federal Register Notice for this collection of information was published on June 25, 2007 (Volume 72, Number 121, Pages 34722-34723), and should be recognized as the correct version. If you have any questions or concerns regarding this matter, please contact Mr. Leonard E. Stowe, NPS, Information Collection Clearance Officer, 1849 C St., NW. (2605), Washington, DC 20240; or via e-mail at leonard stowe@nps.gov.
Fire Management Plan, Final Environmental Impact Statement, Saguaro National Park, AZ
Document Number: 07-3288
Type: Notice
Date: 2007-07-13
Agency: Department of the Interior, National Park Service
Pursuant to Section 102(2)(C) of the National Environmental Policy Act of 1969, 83 Stat. 852, 853, codified as amended at 42 U.S.C. 4332(2)(C), the National Park Service announces the availability of the Record of Decision for the Fire Management Plan, Saguaro National Park, Arizona. On April 25, 2007, the Director, Intermountain Region approved the Record of Decision for the project. As soon as practicable, the National Park Service will begin to implement the Preferred Alternative contained in the FEIS issued on October 7, 2005. The following course of action will occur under the preferred alternative, a fire management program utilizing wildland fire use fires, prescribed fire, non-fire treatments and suppression. This course of action and 2 alternatives were analyzed in the Draft and Final Environmental Impact Statements. The full range of foreseeable environmental consequences was assessed, and appropriate mitigating measures were identified. The Record of Decision includes a statement of the decision made, synopses of other alternatives considered, the basis for the decision, a description of the environmentally preferable alternative, a finding on impairment of park resources and values, a listing of measures to minimize environmental harm, and an overview of public involvement in the decision-making process.
Availability of Funding for Acquisition of Civil War Battlefield Land
Document Number: E7-13527
Type: Notice
Date: 2007-07-12
Agency: Department of the Interior, National Park Service
The National Park Service (NPS) announces the availability of funds to assist States and local communities in acquiring for permanent protection lands, or interests in lands, at significant Civil War battlefield sites. Under Public Law (Pub. L.) 110-5, making appropriations to the Department of Interior in FY 2007, Congress appropriated $4 million from the Land & Water Conservation Fund (LWCF) to assist non-federal efforts to acquire and preserve Civil War battlefield lands. NPS seeks proposals from State and local governmentsor from qualified non- profit historic preservation organizations acting through an agency of State or local governmentfor the non-federal acquisition of significant Civil War battlefield land. Project proposals are subject to the following requirements. 1. These funds must be matched on a dollar-for-dollar basis with non-federal dollars. That is, the federal dollars can pay for no more than one-half of the acquisition cost. 2. The purchase price must be supported by a qualified appraisal that has been approved by NPS as meeting the Uniform Appraisal Standards for Federal Land Acquisitions. 3. The battlefield land acquired with the assistance of these funds must be permanently protected from inappropriate development through conveyance of a perpetual easement to a public historic preservation agency. NPS will give priority to acquisition of land, or interests in land, within the ``core'' areas of Priority I and Priority II battlefields, as identified by the Congressionally-chartered Civil War Sites Advisory Commission (CWSAC). Among potential projects, NPS will give highest priority to acquisition projects that can be completed within the immediate future. Proposals may be submitted at any time, and must include: (1) CWSAC Priority Listing and Map The applicant must include the CWSAC priority listing and document that the proposed acquisition lies within the battlefield core and/or study area, as defined by the CWSAC. Applicants must submit a U.S. Geological Survey quadrangle map with the boundaries of the proposed acquisition clearly drawn. (2) Threat to the Battlefield The applicant must demonstrate that the battlefield is imminently threatened. The nature, the extent, and the level of severity of the threat to the battlefield must be clearly and convincingly stated. Further, the applicant must describe how and to what extent the proposed acquisition addresses the described threat. In cases where there is minimal threat, applications will be considered if there is a stated compelling reason why the acquisition of the property at this time is a better use of LWCF funds than waiting for a more threatened property. (3) Ability To Secure Non-Federal Match An applicant that has secured matching funds must list all sources of those funds. The applicant must certify that the non-federal matching funds are either ``in-hand'' or otherwise committed in writing at the time of application. Third-party matching share commitments must be documented by letter from the third party. Matching share commitments contingent upon receipt of federal funds from this program are acceptable. An applicant that has not yet secured matching funds must submit a specific, credible plan for raising the necessary matching funds. The plan must identify potential sources of funds. It must include a proposed schedule, usually not more than 120 days, for securing funds or commitments of funds. (4) Immediacy of Acquisition The applicant must demonstrate that the owner of the property to be acquired is willing to sell the land at an agreed-upon price. Acceptable documentation includes a contract or contingent contract to buy the land, or a letter from the owner indicating willingness to enter into such a contract at a specified price. The applicant should include a schedule for completion of the acquisition within the near future.
National Register of Historic Places; Notification of Pending Nominations and Related Actions
Document Number: E7-13388
Type: Notice
Date: 2007-07-11
Agency: Department of the Interior, National Park Service
Notice of Availability of a Record of Decision on the Final Environmental Impact Statement for the Dayton Aviation Heritage National Historical Park General Management Plan Amendment
Document Number: E7-12715
Type: Notice
Date: 2007-07-02
Agency: Department of the Interior, National Park Service
Pursuant to section 102(2)(C) of the National Environmental Policy Act of 1969, 83 Stat. 852, 853, the National Park Service (NPS) announces the availability of the Record of Decision (ROD) on the Final Environmental Impact Statement (EIS) for the Dayton Aviation Heritage National Historical Park General Management Plan Amendment, Dayton Aviation Heritage National Historical Park, Ohio. On May 16, the Regional Director, Midwest Region, approved the ROD for the project. As soon as practicable, the NPS will begin to implement the Preferred Alternative contained in the Final EIS issued on April 13. The following course of action will occur under the Preferred Alternative. The park will continue to serve traditional visitors to national parks; however, the primary goal will be to increase regional involvement, particularly in interpretation, education, and outreach. Visitors can expect an active participatory experience that will broaden and expand the park's literary and aviation significance. There will be a new at-grade entrance to the Huffman Prairie Flying Field and a maintenance facility shared by the park and partners. This course of action and two other alternatives were analyzed in the Draft and Final EIS. The full range of foreseeable environmental consequences was assessed and appropriate mitigating measures were identified. The ROD includes a statement of the decision made, synopses of other alternatives considered, the basis for the decision, a description of the environmentally preferable alternative, a finding on impairment of park resources and values, a listing of measures to minimize environmental harm, an overview of public involvement in the decisionmaking process, and a conclusion.
Final Environmental Impact Statement and Environmental Impact Report; Giacomini Wetlands Restoration Project; Point Reyes National Seashore, Marin County, CA; Notice of Availability
Document Number: E7-12714
Type: Notice
Date: 2007-07-02
Agency: Department of the Interior, National Park Service
Pursuant to Sec. 102(2)(C) of the National Environmental Policy Act of 1969 (Pub. L. 91-190, as amended), and the Council on Environmental Quality Regulations (40 CFR part 1500-1508), the National Park Service, Department of the Interior, has prepared a Final Environmental Impact Statement (FEIS) identifying and evaluating the no-action alternative and four action alternatives for the restoration of the Giacomini wetlands. When approved, the plan will guide the National Park Service in restoration and public access actions for lands at the headwaters of Tomales Bay, Marin County, California. Because some of the proposed restoration project area includes state, county and private lands, the document also fulfills California Environmental Quality Act (CEQA) requirements as a Final Environmental Impact Report (EIR). The California State Lands Commission (CALC) is the CEQA lead agency for this project. Through the FEIS/EIR, the potential impacts of the five alternatives are assessed and, where appropriate, measures to avoid or reduce the intensity of potential effects are identified. Three preliminary restoration options that were considered, but rejected because they did not achieve restoration objectives or were infeasible, are also described in the FEIS/EIR. Project Planning Background: Point Reyes National Seashore is a unit of the National Park Service (NPS) located in western Marin County, California. It was established by Congress on September 13, 1962, ``to save and preserve, for the purpose of public recreation, benefit, and inspiration, a portion of the diminishing seashore of the United States that remains undeveloped'' (Pub. L. 87-657). A large portion of Tomales Bay watershed lands were acquired by the NPS in the 1960s and 1970s for establishment of two neighboring parksPoint Reyes National Seashore (Seashore) and Golden Gate National Recreation Area (GGNRA). In 1980, the boundary for GGNRA was expanded to include the Waldo Giacomini Ranch (Giacomini Ranch) and the eastern portion of Tomales Bay. The Giacomini Ranch falls within the north district of the GGNRA, which is administered by the Seashore. The Seashore and CALC are proposing to restore historic wetlands at Giacomini Ranch in Tomales Bay, an embayment that borders the Seashore to the east and north. The Giacomini Ranch property was once part of a large tidal marsh complex at the southern end of Tomales Bay that also encompassed portions of Olema Marsh (a 60-acre freshwater marsh that is partially owned by the NPS). The Giacomini property was diked in 1946 and has been used by the Waldo Giacomini family as a dairy since then. The property was purchased from the Giacomini family in 2000. Partial funding for the purchase came from the California Department of Transportation (CalTrans), which was under obligation to the California Coastal Commission (CCC) to mitigate for impacts resulting from the Lone Tree road repair along State Route 1 conducted in the early 1990s. The CCC eventually allowed CalTrans to fulfill mitigation obligations by making funds available to the NPS to purchase, restore, and manage a replacement wetland site. While the NPS is obligated under its agreement with CalTrans and CCC to mitigate only a total of 3.6 acres, the Seashore believes that the potential value of the historic salt marsh is significant not only to the NPS and its resource conservation objectives, but to the Tomales Bay watershed ecosystem as a whole. Tomales Bay was recently declared impaired for sediment, nutrients, and fecal coliform by the San Francisco Regional Water Quality Control Board under Sec. 303(d) of the Clean Water Act. Coastal wetlands act as both a food source and filtering system for estuarine and marine systems, and the loss of these wetlands in many parts of the bay has contributed to this designation. The diking of the Giacomini property resulted in the loss of hydrologic connectivity and diminished delta functionality for more than 50 percent of the coastal tidal wetlands present in Tomales Bay in the late 1800s. Restoration would reestablish hydrologic connectivity between Tomales Bay and the project area, resulting in increased wetland functionality. The project purpose and goals reflect a broad ecosystem-level approach to restoration. The purpose of the proposed project is to restore natural hydrologic processes within a significant portion of the project area, thereby promoting restoration of ecological processes and functions. Three goals, which further support the overall purpose, were also developed, as follows: Restore natural, self-sustaining tidal, fluvial (streamflow), and groundwater hydrologic processes, thereby enabling reestablishment of some of the ecological processes and functions associated with wetland and riparian areas, such as water quality improvement, floodwater storage, food chain support, and wildlife habitat. Pursue a watershed-based approach to restoration so as to emphasize opportunities to improve ecological conditions within the entire Tomales Bay watershed, not just in the project area itself. To the extent possible, incorporate opportunities for the public to experience and enjoy the restoration process as long as opportunities do not conflict with the project's purpose or with NPS, CALC, or other agency legislation or policies. For these reasons, the NPS and CALC propose to restore natural hydrologic and ecological processes on most or all of the 563-acre property. The NPS and CALC developed a range of alternatives for accomplishing this restoration project that encompass a spectrum of hydrologic and topographic changes. However, there are a series of activities that would be conducted under all five alternatives, including: Discontinuation of agricultural land management on the property, removal of general agricultural infrastructure and buildings from upland areas, and periodic maintenance of creeks to ensure that sediment deposition does not elevate flood risk to adjacent properties. In addition, the Giacomini family would remove all personal property from the project area, including worker housing trailers near Mesa Road. Water rights to Lagunitas Creek, acquired as part of the transfer of ownership, would be dedicated to in-stream flow. The NPS would also enter into a lease agreement with the CALC for leasing of subtidal lands in Lagunitas Creek within the project area. Finally, the NPS will be working with the USGS on an effort to expand the tidewater Goby population within the southern portions of Tomales Bay. Proposed Giacomini Wetlands Restoration: Extensive Restoration of the Giacomini Ranch East Pasture, Full Restoration of the West Pasture, and Restoration of Olema Marsh with Limited Public Access (Alternative D). This alternative has been determined to be ``environmentally preferred'', and involves complete removal of levees in both the West and East Pasture. In general, this alternative builds upon the actions proposed in Alternative B and Alternative C (see below) by fully realigning one of the leveed creeks within the Giacomini Ranch; excavating a portion of the ranch pasture into active intertidal marshplain and floodplain; increasing the amount of culvert replacement to improve hydraulic connectivity, streamflow, and passage of salmonid species; and increasing active revegetation and invasive non-native plant removal efforts. In addition, this alternative incorporates adaptive restoration of Olema Marsh (which is located south of Giacomini Ranch and White House Pool and is owned by Audubon Canyon Ranch (ACR) and the NPS); this would include a phased approach to shallow channel excavation, vegetated berm removal, and potential replacement of Levee Road and/or Bear Valley Road culverts in the future should initial restoration efforts not achieve the desired degree of success. Public access components of Alternative D include an improved spur trail leading to the edge of the Dairy Mesa; an improved spur trail extension of the existing Tomales Bay Trail; an improved spur trail on the southern perimeter following the existing alignment of an informal social path; and an ADA-compliant path in White House Pool County Park. The NPS would also pursue working with Marin County (through separate environmental compliance) to consider additional public access facilities on the southern perimeter of the project area, including reevaluation of a trail along Levee Road, extension of a trail to Inverness Park, and, should other options not prove viable, a non- vehicular bridge across Lagunitas Creek. Alternatives to Proposed Project: Under the No Action Alternative, levees, tidegates, and culverts in the Giacomini Ranch will remain. An 11-acre area will be restored on the northeast corner of the east pasture to satisfy mitigation requirements for aquatic habitat impacts caused by CalTrans due to road repairs on State Route 1 in Marin County in exchange for the NPS receiving monies to purchase and restore the Giacomini Ranch. The remainder of the levees in the East Pasture and West Pasture would no longer be maintained. Under the No Action Alternative only, there is potential for limited grazing, with consultation conducted under a separate compliance process. Olema Marsh would not be restored, and there would be no new public access facilities. Alternative ALimited Restoration of the Giacomini Ranch East Pasture Only with Expanded Public Access, Including Culverted Earthen Fill Trail on Eastern Perimeter. This alternative involves selective breaching of the East Pasture levee, while levees and tidegates in the West Pasture would not be removed. A limited amount of tidal channel creation, creek bank grading, and revegetation would also be performed in the East Pasture. Most of the actions under this alternative focus on removing agricultural infrastructure such as filling of ditches, ripping of compacted roads, fence removal, and removal of pumps, pipelines, and concrete spillways, as well as removal of ranch buildings. For future public access, the southern perimeter trail would include a prefabricated bridge across Lagunitas Creek, near the old summer dam location across from White House Pool County Park. The bridge design would place footings outside of the active channel, so as to not impinge on hydrologic processes. Future extension of the southern perimeter trail, in collaboration with the County of Marin, would connect White House Pool County Park with a path along Sir Francis Drake Boulevard (that would either run alongside the road or move off the road at the southern end of the unrestored West Pasture onto a low-elevation boardwalk that would join back with Sir Francis Drake Boulevard in Inverness Park). Other infrastructure constructed is a culverted berm through-trail on the eastern perimeter of the East Pasture. Alternative BModerate Restoration of the Giacomini Ranch East Pasture and Limited Restoration of the West Pasture with Expanded Public Access, Including Boardwalk Trail on the Eastern Perimeter. This alternative would completely remove the East Pasture levees and create several breaches in the West Pasture levee, as well as remove the tidegate on Fish Hatchery Creek. More tidal channel creation, grading, and revegetation would occur than under Alternative A. There would be no activities taken at Olema Marsh. Most of the new public access facilities would continue to be limited to the eastern and southern perimeters of the East Pasture, including construction of the pedestrian access bridge across Lagunitas Creek near the old summer dam, and extension of the southern perimeter trail to Inverness Park. The culverted berm through-trail on the eastern perimeter in Alternative A would instead be a boardwalk. On the West Pasture north levee, a viewing area would replace the existing informal trail. Alternative CFull Restoration of the Giacomini Ranch East and West Pastures and Restoration of Olema Marsh, with Moderate Public Access. This alternative involves complete removal of levees in both the West and East Pasture. In general, this alternative would result in more tidal channel creation, grading, and revegetation than Alternative B. In addition, the project boundary is expanded to include Olema Marsh, which is located south of the Giacomini Ranch and White House Pool and is owned by ACR and the NPS. Olema Marsh and the Giacomini Ranch once formed an integrated tidal wetland complex. In Alternative C, there would be an adaptive approach for Olema Marsh restoration that would include phased shallow channel excavation and vegetated berm removal. Levee Road and Bear Valley Road culverts could be replaced in the future should initial restoration efforts not achieve the desired degree of success. Public access components include the southern perimeter path and proposed future trails as described under Alternative A and Alternative B, but there would be two spur trails rather than a through-trail on the eastern perimeter of the Giacomini Ranch. Principal Differences Between the Draft and Final EIS/EIR: Change in Preferred Alternative: The alternative preferred by the NPS and CALC has been changed to Alternative D from Alternative C. The lead agencies initially chose Alternative C as the Preferred Alternative as it appeared to best meet both wetland restoration goals and community public access needs. During public review of the DEIS/ EIR, a large number of responses from the public, organizations, and agencies advocated selecting Alternative D because it was more compatible with restoration and would have less traffic, noise, pollution, and land use impacts. Changes to Alternative D: Alternative D has been modified slightly in the FEIS/EIR in response to public feedback so as to slightly decrease the degree of excavation, to remove eucalyptus from Tomasini Creek, and to construct an ADA-compliant trail and viewing platform at the nearby White House Pool County Park. In addition, this alternative now also incorporates the option for NPS to collaborate with Marin County in a separate environmental process on possible additional public access facilities on the southern perimeter of the project area (as noted above). Change in Impact Determinations: Because of refinement of construction scheduling and project design (identified in Chapter 2), the NPS and CALC have re-assessed some levels of impact identified, although none of these changes results in any ``Significant, Unavoidable Impacts'', such that all major impacts are mitigated to moderate or lesser intensities. Construction-related air quality impacts under Alternative C have been reduced to moderate, although Alternative D still would have major or substantial impacts that are mitigated to moderate levels through implementation of recommended Best Management Practices. Alternative A and Alternative B would have major impacts on riparian habitat due to construction of the eastern perimeter trail that could conflict with state and local policies on riparian habitat protection, but these impacts would be mitigated to minor or moderate through active and passive revegetation efforts. Major restoration actions in Olema Marsh identified as part of the adaptive restoration under Alternative C and Alternative D such as culvert replacement would not be implemented until the NPS can confirm these actions would not cause major impacts to municipal water supply through increasing water salinities in the portion of the Lagunitas Creek that is adjacent to municipal groundwater wells. Summary of Public Engagement: On September 23, 2002, a Notice of Intent (NOI) to conduct public scoping to inform preparation of an EIS was published in the Federal Register. On September 25, 2002, a copy of the NOI and scoping information was sent to 45 landowners adjacent to the project area, and 163 persons and organizations on a public review request list maintained by the Seashore. On October 4, 2002, the NOI was sent to the Governor's Office of Planning and Research State Clearinghouse for distribution to relevant state agencies (SCH 2002114002). Following agreement by CALC to act as the lead CEQA agency, a Notice of Preparation (NOP) for preparation of a joint EIS/ EIR was prepared by CALC, and distributed to the State Clearinghouse, which circulated the NOP between May 29 and June 30, 2003. The extensive public scoping period also closed on June 30, 2003. Oral comments were heard at a public information meeting at the October 19, 2002 Advisory Commission held at the Point Reyes Dance Palace where approximately 30 to 40 members of the public attended. In addition to the oral comments obtained, approximately 86 individuals or private organizations provided written comments regarding the proposed restoration. Regulatory scoping meetings were conducted on November 6, 2002 and November 8, 2002 during the public scoping period. The NPS and CALC received comments from seven local, state, or federal agencies. After the public scoping phase concluded on June 30, 2003, a staff report was prepared that summarized all information derived from the public scoping process. After a series of internal post-scoping discussions in spring 2004, the NPS and CALC hosted a series of information meetings with regulatory and local and state agencies, adjacent landowners, and local technical experts in the field of wetland restoration, to present and receive feedback on preliminary restoration and public access concepts. This phase culminated in a public workshop on June 22, 2004, at the Seashore Red Barn attended by more than 110 people. Following the June public workshop, all interested individuals and organizations were encouraged to submit comments to the NPS and CALC on the restoration concepts and scope of the proposed DEIS/EIR. Through July 23, 2004 written letters or e-mails from 58 individuals and 14 private organizations were received, as well as two petitions with a total of approximately 450 signatures. NPS staff also met with representatives of stakeholder groups from Marin County and interested agencies that requested briefings. In response to the comments received, the NPS and CALC contracted for two additional studies on public access options within the project area that evaluated potential impacts on resources and adjacent land uses, as well as technical feasibility and costs. As part of this effort, additional meetings were held with adjacent landowners and the general public in February-March, 2005. The Seashore's Notice of Availability for the DEIS/EIR was published in the Federal Register on November 3, 2006. The EPA's notification of filing of the DEIS/EIR was published in the Federal Register on December 15, 2006, formally initiating the 60-day public comment period. A notice that the DEIS/EIR had been also filed with the State Clearinghouse was published on December 18, 2006. The Seashore mailed over 450 letters regarding availability of the DEIS/EIR for public review on December 13, 2006 (this letter also announced a public meeting scheduled for January 25, 2007, at the Seashore Red Barn, and confirmed that the public comment period would end February 14, 2007). On December 14, 2006, a press release announcing the public meeting was distributed to the Point Reyes Light, Marin Independent Journal, and Press Democrat, as well as 28 other media outlets, including newspapers, radio stations, and television stations. Details about the public meeting were also posted on the Seashore's Web site. The Marin Independent Journal and Point Reyes Light published articles about release of the DEIS/EIR and the pending public meeting. Approximately 100 members of the public attended the January 25, 2007 meeting. The Point Reyes Light published an account of the meeting on February 1, 2007. Altogether approximately 180 interested individuals and organizations responded to release of the DEIS/EIR; approximately 170 were from private individuals. There were no form letters. More than 99 percent of the letters submitted were from residents of Marin County. Organizations providing comments included the Environmental Action Committee of Marin; Point Reyes Lodging Association; Marin County Bicycle Coalition/Community Pathways Committee/Access 4 Bikes; California Native Plant Society; Point Reyes Village Association; Sierra Club, Marin Chapter; and Tomales Bay Association. Ten responses were received from local, state, or federal agenciesthe California Coastal Commission; the California Regional Water Quality Control Board; the Gulf of the Farallones National Marine Sanctuary; the North Marin Water District; the Marin/Sonoma Mosquito and Vector Control District; the County of Marin Department of Public Works; the County of Marin Department of Parks and Open Space District; the State Department of Conservation; the State of California Department of Fish and Game; and the EPA. More than 90 percent of the oral and written comments received during the public meeting and throughout the comment period concerned the choice of Alternative C as the Preferred Alternative. A large number of comments also advocated modifications to either the existing Preferred Alternative or to Alternative D, with most of these proposed modifications focusing on changes to the public access components on the eastern and southern perimeters of the project area. On March 2, 2007, the EPA published its Lack of Objection (LO) findings regarding the DEIS/EIR, noting that the ``EPA supports the proposed project and believes it will significantly improve the hydrologic and ecological processes and functions in the Tomales Bay Watershed.'' All written comments received and a summary of commentary from the January 25, 2007, public meeting are available for inspection at the Seashore Administration Building, 1 Bear Valley Road, Point Reyes Station, CA. Substantive comments and responses are documented in the FEIS/EIR. Copies of the FEIS/EIR may be obtained from the Superintendent, Point Reyes National Seashore, Point Reyes, CA 94956, Attn: Giacomini Wetlands Restoration Project, or by e-mail request to: poreplanning@nps.gov (in the subject line, type: Giacomini Wetlands Restoration Project). The document will be sent directly to those who have requested it, and also will be posted on the Internet at the Seashore's Web site https://www.nps.gov/pore; and both the printed document and digital version on compact disk will be available at the park headquarters and local libraries. Decision: As a delegated EIS/EIR, the official responsible for the final decision is the Regional Director, Pacific West Region. A Record of Decision, fully documenting the entire conservation planning and environmental decision-making process, will be prepared not sooner than 30 days following publication in the Federal Register of the EPA's notice of filing and availability of the Final EIS/EIR. Subsequently and prior to implementation, notice of approval of the Record of Decision will likewise be published in the Federal Register, as well as announced via local and regional news media. Following approval of the Giacomini Wetlands Restoration Project, the official responsible for project implementation will be the Superintendent, Point Reyes National Seashore.
Notice of Inventory Completion: University of Colorado Museum, Boulder, CO; Correction
Document Number: E7-12713
Type: Notice
Date: 2007-07-02
Agency: Department of the Interior, National Park Service
Notice of Inventory Completion: Pierce College District, Lakewood, WA; Correction
Document Number: E7-12712
Type: Notice
Date: 2007-07-02
Agency: Department of the Interior, National Park Service
Notice of Inventory Completion: University of Colorado Museum, Boulder, CO
Document Number: E7-12711
Type: Notice
Date: 2007-07-02
Agency: Department of the Interior, National Park Service
Notice of Intent To Prepare a Draft Environmental Impact Statement (EIS) for the Special Resource Study (SRS) for Sites Related to the Civil War Battle of Franklin, Near Franklin, Tennessee
Document Number: 07-3205
Type: Notice
Date: 2007-07-02
Agency: Department of the Interior, National Park Service
Pursuant to section 102(2)(C) of the National Environmental Policy Act of 1969 and National Park Service policy in Director's Order 2 (Park Planning) and Director's Order 12 (Conservation Planning, Environmental Impact Analysis, and Decision-making) the National Park Service (NPS) will prepare an EIS for the SRS for sites related to the Civil War Battle of Franklin (BoF) located in Franklin, Tennessee. The statement will assess potential environmental impacts associated with various types and levels of visitor use and resources management for sites related to the BoF. The authority for publishing this notice is contained in 40 CFR 1506.6 which prescribes the regulations for implementing the provisions of the National Environmental Policy Act. The process by which the Secretary of the Interior will conduct SRSs is contained in 16 U.S.C. 1a-5. New areas are typically added to the National Park System by an Act of Congress. The National Park Service is often tasked by Congress to evaluate potential new areas for compliance with the established criteria for designation. The NPS documents its findings in a SRS Report. On December 1, 2005, Congress passed the Franklin National Battlefield Study Act (Pub. L. 109-120) directing the Secretary of the Interior to conduct a SRS for certain sites in Tennessee including the cities of Brentwood, Franklin, Triune, Thompson Station, and Spring Hill, Tennessee. The NPS is currently accepting comments from interested parties on issues, concerns, and suggestions pertinent to the BoF. Suggestions and ideas for managing the cultural and natural resources associated with the BoF are encouraged. Comments may be submitted in writing to the address listed at the end of this notice or through the NPS Planning, Environment, and Public Comment (PEPC) Web site at https:// parkplanning.nps.gov. The NPS will publish periodic newsletters on the PEPC Web site to present scoping issues and preliminary management concepts to the public as they are developed. Public meetings to present management concepts will be conducted in the local area. Specific locations, dates, and times will be announced in local media and on the PEPC Web site. If you wish to comment, you may submit your comments by any one of several methods. You may mail comments to: Tim Bemisderfer, Battle of Franklin SRS, NPS Southeast Regional Office, Planning and Compliance Division, 100 Alabama Street, 6th Floor 1924 Building, Atlanta, Georgia 30303. You may also comment via the Internet to https://parkplanning.nps.gov/sero. Please submit Internet comments as a plain text file, avoiding the use of special characters and any form of encryption. Please also include your name and return address in your Internet message. If you do not receive a confirmation from the system that we have received your Internet message, contact us directly at 404-562-3124, extension 693. Before including your address, phone number, e-mail address, or other personal identifying information in your comment, you should be aware that your entire commentincluding your personal identifying informationmay be made publicly available at any time. While you can ask us in your comment to withhold your personal identifying information from public review, we cannot guarantee that we will be able to do so. We will always make submissions from organizations or businesses, and from individuals identifying themselves as representatives of or officials of organizations or businesses, available for public inspection in their entirety.
Notice of Intent (NOI) to Expand the Scope of the General Management Plan (GMP)/Environmental Impact Statement (EIS) Being Prepared for Fort Pulaski National Monument
Document Number: 07-3204
Type: Notice
Date: 2007-07-02
Agency: Department of the Interior, National Park Service
The National Park Service (NPS) is expanding the scope of the GMP/EIS being prepared for Fort Pulaski National Monument. As part of this planning effort, the NPS will include a wilderness study to determine if any portions of the park should be recommended for inclusion in the National Wilderness Preservation System as defined in the Wilderness Act of 1964. The study will be included as part of the GMP/EIS currently in preparation. A NOI to prepare an EIS for the GMP was originally published in the Federal Register on February 24, 2005, (Volume 70, Number 36). That EIS now will be expanded to include an evaluation of the impacts associated with possible designation of wilderness at Fort Pulaski. This notice is being furnished as required by National Environmental Policy Act (NEPA) regulations 40 CFR 1501.7. To facilitate sound planning and analysis of environmental impact, the NPS is gathering information necessary for the preparation of the GMP, the wilderness study, and the associated EIS and is obtaining suggestions and information from other agencies and the public on the scope of issues to be addressed. Comments and participation in this scoping process are invited.
National Register of Historic Places; Notification of Pending Nominations and Related Actions
Document Number: E7-12489
Type: Notice
Date: 2007-06-28
Agency: Department of the Interior, National Park Service
Cape Hatteras National Seashore; Off-Road Vehicle Management
Document Number: E7-12012
Type: Proposed Rule
Date: 2007-06-28
Agency: Department of the Interior, National Park Service
The Secretary of the Interior is giving notice of intent to establish the Negotiated Rulemaking Advisory Committee for Off-Road Vehicle Management at Cape Hatteras National Seashore (Committee) to negotiate and develop special regulations (proposed rule) for management of off-road vehicles (ORV) at Cape Hatteras National Seashore (Seashore).
30-Day Notice of Submission to the Office of Management and Budget; Opportunity for Public Comment
Document Number: 07-3108
Type: Notice
Date: 2007-06-26
Agency: Department of the Interior, National Park Service
Under provisions of the Paperwork Reduction Act of 1994 (44 U.S.C. 3507) and 5 CFR part 1320, Reporting and Recordkeeping Requirements, the National Park Service (NPS) invites public comments on a revision of a currently approved collection of information (OMB No. 1024-0236).
National Register of Historic Places; Notification of Pending Nominations and Related Actions
Document Number: E7-12169
Type: Notice
Date: 2007-06-25
Agency: Department of the Interior, National Park Service
30-Day Notice of Submission of Study Package to the Office of Management and Budget; Opportunity for Public Comment
Document Number: 07-3095
Type: Notice
Date: 2007-06-25
Agency: Department of the Interior, National Park Service
Under provisions of the Paperwork Reduction Act of 1995 [44 U.S.C. 3507(a)(1)(D)] and 5 CFR Part 1320, Reporting and Record keeping Requirements, the National Park Service (NPS) invites public comments on a revision of a currently approved collection of information (OMB number 1024-0236).
30 Day Notice of Submission to the Office of Management and Budget; Opportunity for Public Comment
Document Number: 07-3094
Type: Notice
Date: 2007-06-25
Agency: Department of the Interior, National Park Service
Under the provisions of the Paperwork Reduction Act of 1995 (Pub. L. 104-13, 44 U.S.C. 3507) and 5 CFR part 1320, Reporting and Record Keeping Requirements, the National Park Service (NPS) invites public comments on an extension of a currently approved collection of information (OMB number 1024-0022).
30-Day Notice of Submission to the Office of Management and Budget; Opportunity for Public Comment
Document Number: 07-3093
Type: Notice
Date: 2007-06-25
Agency: Department of the Interior, National Park Service
Under the provisions of the Paperwork Reduction Act of 1995 (Pub. L. 104-13, 44 U.S.C. 3507) and 5 CFR part 1320, Reporting and Record keeping Requirements, the National Park Service (NPS) invites public comments on an extension of a currently approved collection of information (OMB No. 1024-0245).
30-Day Notice of Submission to the Office of Management and Budget; Opportunity for Public Comment
Document Number: 07-3092
Type: Notice
Date: 2007-06-25
Agency: Department of the Interior, National Park Service
Under the provisions of the Paperwork Reduction Act of 1995 (Pub. L. 104-13, 44 U.S.C. 3507) and 5 CFR part 1320, Reporting and Recordkeeping Requirements, the National Park Service (NPS) invites public comments on a revision of a currently approved collection of information (OMB 1024-0021).
30-Day Notice of Submission to the Office of Management and Budget; Opportunity for Public Comment
Document Number: 07-3089
Type: Notice
Date: 2007-06-25
Agency: Department of the Interior, National Park Service
Under provisions of the Paperwork Reduction Act of 1995 and 5 CFR Part 1320, Reporting and Recordkeeping Requirements, the National Park Service (NPS) invites comments on an extension of a currently approved collection of information (OMB Control Number 1024-0233).
Environmental statements; availability, etc.: American Museum of Natural History, New York, NY
Document Number: E7-11986
Type: Notice
Date: 2007-06-21
Agency: National Park Service, Department of the Interior
National Register of Historic Places; Notification of Pending Nominations and Related Actions
Document Number: E7-11726
Type: Notice
Date: 2007-06-19
Agency: Department of the Interior, National Park Service
Authentic Native Handicrafts
Document Number: E7-11274
Type: Rule
Date: 2007-06-12
Agency: Department of the Interior, National Park Service
The National Parks Omnibus Management Act of 1998 encourages the sale of authentic United States Indian, Alaska Native, Native Samoan and Native Hawaiian handicrafts relating to the cultural, historical, and geographic characteristics of units of the national park system. This final rule implements the requirements of the act.
General Management Plan, Final Environmental Impact Statement, Great Sand Dunes National Park and Preserve, Colorado
Document Number: 07-2895
Type: Notice
Date: 2007-06-12
Agency: Department of the Interior, National Park Service
Pursuant to National Environmental Policy Act of 1969, 42 U.S.C. 4332(2)(C), the National Park Service (NPS) announces the availability of a Final Environmental Impact Statement for the General Management Plan and Wilderness Study, Great Sand Dunes National Park and Preserve, Colorado. The NPS preferred alternative was developed with substantial public, interagency, and staff participation between 2002 and 2006. The NPS preferred option includes options for new trails to allow for dispersed hiking and horseback riding and educational opportunities on the expansion lands. Cooperative or joint facilities, such as future access routes and trailheads with the U.S. Forest Service, U.S. Fish and Wildlife Service, and private partners are emphasized. A large portion of the park expansion lands was studied and will be recommended for future wilderness designation. Additional wilderness in the Sand Dunes National Park was very popular with the public.
Draft Environmental Impact Statement for the Marin Headlands-Fort Baker, Transportation Infrastructure and Management Plan, Golden Gate National Recreation Area, Marin County, CA; Notice of Availability
Document Number: 07-2880
Type: Notice
Date: 2007-06-12
Agency: Department of the Interior, National Park Service
Pursuant to section 102(2)(C) of the National Environmental Policy Act of 1969 (Pub. L. 91-190, 42 U.S.C. 4321-4347, January 1, 1970, as amended), and the Council on Environmental Quality Regulations (40 CFR parts 1500 through 1508), the National Park Service, Department of the Interior, has prepared a Draft Environmental Impact Statement for the Marin Headlands-Fort Baker Transportation Infrastructure and Management Plan. The project would provide greater access to and within the Marin Headlands and Fort Baker areas for a variety of users in a way that minimizes or avoids impacts to the rich natural diversity and cultural resources of these areas within Golden Gate National Recreation Area (GGNRA). Roadway infrastructure would be rehabilitated or reconstructed with non-character altering roadway widening, and parking facilities would be improved. Additional transit options would be provided to and within areas to improve access to visitor sites. Pedestrian and bicycle facilities would be improved through closure and rerouting of existing trails and construction of new trails. A successful project would meet the following goals: (1) Promote public transit, pedestrian, and bicycle travel to and within GGNRA to improve visitor experience and enhance environmental quality; (2) Rehabilitate the Marin Headlands-Fort Baker transportation road and trail infrastructure in a manner that protects resources and improves safety and circulation; (3) Reduce traffic congestion at key GGNRA locations and connecting roads. Proposal and Alternatives: As noted, this Draft Environmental Impact Statement (EIS) describes and analyzes four alternatives. Alternative 1, the No Action Alternative, would not deviate from the existing management direction; it serves as an environmental baseline from which potential effects of the three ``action'' alternatives may be compared. Alternative 2 would provide basic multi-modal access. Roadway infrastructure would be rehabilitated within the existing roadway width; parking facilities would be improved; transit service to the Marin Headlands would be expanded on weekends; and minor pedestrian and bicycle facility enhancements would be implemented to improve access to these GGNRA areas. Alternative 4 would provide maximum multi- modal access. Roadway infrastructure would be reconstructed throughout the study area, and parking facilities would be improved. Transit options would include the addition of connections to regional transit centers outside of GGNRA. Extensive pedestrian and bicycle facility enhancements would be implemented, including closure and rerouting of existing trails, construction of new trails, and road widening to allow for bicycle lane construction on nearly all major roads. Alternative 3 is the Agency Preferred alternative. Alternative 3 would provide enhanced multi-modal access. Roadway infrastructure would be rehabilitated or reconstructed with non-character altering roadway widening, and parking facilities would be improved. Additional transit options would be provided to and within the Marin Headlands and Fort Baker (MH/FB) areas to improve access. Pedestrian and bicycle facilities would be improved through closure and rerouting of existing trails and construction of new trails. Key project elements include the following: Roadways and Vehicular Circulation: At selected sites within the area of potential effect, roads and intersections will be modified to improve safety and operations. Modifications include widening the road widths from two to four feet to allow for the provision of Class 2 bicycle lanes or improved safety on Class 3 bike routes, and reconstructing intersections from a ``Y'' to a ``T'' configuration. In addition GGNRA would implement a wayfinding program and ``intelligent transportation system'' (ITS) technologies to improve visitor information and reduce traffic congestion at key locations. Parking Management and Fees: In many MH/FB locations parking areas would be reconfigured, delineated, and formalized, in order to improve parking operations, reduce congestion, better match parking supply with demand, and reduce natural resource impacts. A parking fee program would be implemented to provide enhanced transit service operations. Bicycle and Pedestrian Improvements: Class 1 bicycle path and Class 2 bicycle lanes would be added in several locations, and extensive improvements to pedestrian trails would be implemented. A new bicycle/ pedestrian trail would be constructed to provide a separate facility connecting Fort Baker to the bike lanes at Barry-Baker tunnel and the Marin Headlands. Rodeo Valley Trail would be widened with a hardened surface between Capehart Housing and Bunker Road at Rodeo Lagoon to provide a Class 1 bicycle path and hiking trail. The Coastal Trail would be rerouted from its current interior Rodeo Valley alignment to a more coastal alignment with spectacular views. Transit Services: Existing transit services in the MH/FB areas would be enhanced to improve access to and within these areas. The goal would be to provide transit access seven days a week by expanding MUNI and Golden Gate Transit service on existing routes, and by implementing additional park shuttle service. Car-Free Days and Special Events: A program of car-free days would be established on selected days on a trial basis; after review of the demonstration program, GGNRA may adjust the number of car-free days or the scheduled times and operations. This program would allow visitors to experience these areas with minimal vehicular traffic and would encourage visitors to use alternative modes of transportation to access and travel within GGNRA. Natural Resource Enhancements: Efforts to protect and enhance natural resources would include restoring the wetland community at the unpaved parking lot at Rodeo Beach; repairing gullies that have eroded due to past poor drainage along Conzelman roadway; and removing fill and restoring wetlands along Rodeo Lagoon/Lake on selected portions of Smith and Bunker Roads. Scoping and Public Involvement: The Notice of Intent to prepare an EIS was published in the Federal Register on April 10, 2002. Early in the EIS scoping phase three public meetings were hosted in San Francisco, Marin City, and Oakland. The San Francisco meeting occurred on March 26, 2002 during a meeting of the GGNRA Advisory Committee (approximately ten members of the public attended the meeting). The Marin City meeting occurred on April 10, 2002 at the Manzanita Community Center in Marin City (approximately 20 members of the public attended). The Oakland meeting occurred on April 11, 2002 at the Metropolitan Transportation Commission Auditorium in Oakland. Three members of the public attended, along with several agency staff members. In addition GGNRA hosted two Alternatives Refinement Workshops for the public in order to solicit early feedback on the four preliminary alternatives. The workshops were conducted on November 19, 2002 at Tamalpais High School in Mill Valley (approximately 11 community members attended) and on November 26, 2002 at GGNRA Headquarters in San Francisco (approximately 15 community members attended). GGNRA staff prepared and distributed announcements of the meetings to 2,000 individuals and organizations (and these were also distributed at Marin Headlands Visitor Center and posted widely on bulletin boards in Marin County). Summaries of oral comments received at each workshop and written comments from the public have been documented (``Summary of November 2002 Alternatives Refinements Workshops'', Nelson/Nygaard 2003). Comments from these workshops were used to further refine the alternatives and identify the main issues to be addressed in finalizing the Draft EIS. GGNRA also hosted a public forum March 14, 2003 to review initial findings of the Fort Baker Cultural Landscape Report and Marin Headlands-Fort Baker Historic Roads Characterization Study (two individuals attended). The most recent public outreach efforts included updates on project alternatives at the last four of GGNRA's quarterly public meetings beginning with a May 16, 2006 meeting at the Mill Valley Community Center. Regular posting of information updates occurs on GGNRA's Web site (https:// parkplanning.nps.gov/goga). Comments: Copies of the Draft EIS will be sent to affected Federal, Tribal, State and local government agencies, to all interested parties, and those requesting copies. Printed and digital copies (compact disc) of the Draft EIS will be available at GGNRA headquarters and at local libraries. The complete document will be posted on GGNRA's Web site (noted above). All written comments must be postmarked or transmitted no later than sixty days from the date of EPA's notice of filing published in the Federal Register (as soon as this occurs, the confirmed closing date for the comment period will be posted on GGNRA's Web site, and also publcized in all other GGNRA announcements). Written comments may be sent by letter addressed to: General Superintendent, GGNRA, Fort Mason, Bldg. 201, San Francisco, CA 94123 (Attn: MH-FB Transportation Plan). Comments will also be accepted via the Internet at https://parkplanning.nps.gov/goga (click on the project title and follow instructions) or e-mail at gogaplanning@nps.gov. All submissions from organizations or businesses, and from individuals identifying themselves as representatives of or officials of organizations or businesses, are maintained in the project administrative record and will be available for public inspection in their entirety. Before including your address, phone number, e-mail address, or other personal identifying information in your comment, you should be aware that your entire responseincluding your personal identifying informationmay be made publicly available at any time. While you can ask us in your comment to withhold your personal identifying information from public review, we cannot guarantee that we will be able to do so. A public meeting will be scheduled to hear comments on the Draft EIS, approximately 30 days after publication of this notice in the Federal Register. Please visit GGNRA's Web site (noted above) to learn more about the project or the conservation planning/environmental impact analysis process, or to obtain information updates regarding the logistics of the public meeting. Questions regarding the Draft EIS may also be directed at any time to Mr. Steve Ortega at (415) 561-4841 (or gogaplanning@nps.gov. Decision Process: Following the careful analysis of all comments received concerning the Draft EIS, it is anticipated that the Final EIS for the proposed Transportation Infrastructure and Management Plan would be completed in fall 2007. Availability of the Final EIS will be announced in the Federal Register, and also publicized via local and regional press media, direct mailings, and Web site postings. Not sooner than thirty days after release of the Final EIS, a Record of Decision may be executed (at this time it is anticipated that a recommended decision would be developed during winter 2007-08). As a delegated EIS the approving official is the Regional Director, Pacific West Region. Subsequently, the official responsible for implementation of the approved plan will be the General Superintendent, Golden Gate National Recreation Area.
National Register of Historic Places; Notification of Pending Nominations and Related Actions
Document Number: E7-11066
Type: Notice
Date: 2007-06-08
Agency: Department of the Interior, National Park Service
National Register of Historic Places; Notification of Pending Nominations and Related Actions
Document Number: E7-10728
Type: Notice
Date: 2007-06-05
Agency: Department of the Interior, National Park Service
Notice of Inventory Completion: Denver Museum of Nature & Science, Denver, CO
Document Number: E7-10719
Type: Notice
Date: 2007-06-04
Agency: Department of the Interior, National Park Service
Notice of Inventory Completion: Colorado Archaeological Society, Denver Chapter, Denver, CO
Document Number: E7-10717
Type: Notice
Date: 2007-06-04
Agency: Department of the Interior, National Park Service
Notice of Inventory Completion: University of Colorado Museum, Boulder, CO
Document Number: E7-10716
Type: Notice
Date: 2007-06-04
Agency: Department of the Interior, National Park Service
Notice of Intent to Repatriate Cultural Items: American Museum of Natural History, New York, NY
Document Number: E7-10713
Type: Notice
Date: 2007-06-04
Agency: Department of the Interior, National Park Service
Chesapeake and Ohio Canal National Historical Park; Notice of Public Meeting
Document Number: 07-2751
Type: Notice
Date: 2007-06-04
Agency: Department of the Interior, National Park Service
Notice is hereby given that a meeting of the Chesapeake and Ohio Canal National Historical Park Advisory Commission will be held at 9:30 a.m., on Friday, June 22, 2007, at the Chesapeake and Ohio Canal National Historical Park Headquarters, 1850 Dual Highway, Hagerstown, Maryland 21740.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.