Coast Guard December 21, 2015 – Federal Register Recent Federal Regulation Documents
Results 1 - 3 of 3
Drawbridge Operation Regulation; Connecticut River, Old Lyme, CT
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Amtrak Old Saybrook-Old Lyme Bridge across the Connecticut River, mile 3.4, at Old Lyme, Connecticut. This deviation is necessary to perform gear box replacement. This deviation allows the bridge to remain in the closed position for approximately 5 days.
Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Wrightsville Beach, NC
The Coast Guard has issued a temporary deviation from the operating schedule that governs the SR 74 Bascule Bridge, across the Atlantic Intracoastal Waterway (AIWW), mile 283.1, at Wrightsville Beach, NC. The deviation is necessary to accommodate the 7th annual Quintiles Wrightsville Beach Marathon. This deviation allows the bridge to remain in the closed position during the race to facilitate the safe travels of the runners and bystanders.
Drawbridge Operation Regulation; Upper Mississippi River, Sabula, Iowa
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Sabula Railroad Drawbridge across the Upper Mississippi River, mile 535.0, at Sabula, Iowa. The deviation is necessary to allow the bridge owner time to perform preventive maintenance that is essential to the safe operation of the drawbridge, and is scheduled in the winter when there is less impact on navigation. This deviation allows the bridge to open on signal if at least 24-hours advance notice is given.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.