Drawbridge Operation Regulation; Upper Mississippi River, Sabula, Iowa, 79260 [2015-31917]
Download as PDF
79260
Federal Register / Vol. 80, No. 244 / Monday, December 21, 2015 / Rules and Regulations
Lhorne on DSK5TPTVN1PROD with RULES
unfairly hamper law enforcement
processes. It is the nature of law
enforcement to uncover the commission
of illegal acts at diverse stages. It is often
impossible to determine initially what
information is accurate, relevant, timely,
and least of all complete. With the
passage of time, seemingly irrelevant or
untimely information may acquire new
significance as further details are
brought to light.
(I) From subsection (e)(8) because the
requirement to serve notice on an
individual when a record is disclosed
under compulsory legal process could
unfairly hamper law enforcement
processes. It is the nature of law
enforcement that there are instances
where compliance with these provisions
could alert the subject of an
investigation of the fact and nature of
the investigation, and/or the
investigative interest of intelligence or
law enforcement agencies; compromise
sensitive information related to national
security; interfere with the overall law
enforcement process by leading to the
destruction of evidence, improper
influencing of witnesses, fabrication of
testimony, and/or flight of the subject;
reveal a sensitive investigative or
intelligence technique; or constitute a
potential danger to the health or safety
of law enforcement personnel,
confidential informants, and witnesses.
(J) From subsection (f) because
requiring the Agency to grant access to
records and establishing agency rules
for amendment of records would
unfairly impede the agency’s law
enforcement mission. To require the
confirmation or denial of the existence
of a record pertaining to a requesting
individual may in itself provide an
answer to that individual relating to the
existence of an on-going investigation.
The investigation of possible unlawful
activities would be jeopardized by
agency rules requiring verification of the
record, disclosure of the record to the
subject, and record amendment
procedures.
(K) From subsection (g) to the extent
that the system is exempt from other
specific subsections of the Privacy Act.
Dated: December 2, 2015.
Aaron Siegel,
Alternate OSD Federal Register Liaison
Officer, Department of Defense.
[FR Doc. 2015–31868 Filed 12–18–15; 8:45 am]
BILLING CODE 5001–06–P
VerDate Sep<11>2014
15:24 Dec 18, 2015
Jkt 238001
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2015–1099]
Drawbridge Operation Regulation;
Upper Mississippi River, Sabula, Iowa
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Sabula
Railroad Drawbridge across the Upper
Mississippi River, mile 535.0, at Sabula,
Iowa. The deviation is necessary to
allow the bridge owner time to perform
preventive maintenance that is essential
to the safe operation of the drawbridge,
and is scheduled in the winter when
there is less impact on navigation. This
deviation allows the bridge to open on
signal if at least 24-hours advance notice
is given.
DATES: This deviation is effective
without actual notice from December
21, 2015 through 7 a.m., March 4, 2016.
For the purposes of enforcement, actual
notice will be used from 7 a.m.,
December 16, 2015 until December 21,
2015.
ADDRESSES: The docket for this
deviation, [USCG–2015–1099] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH’’.
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Eric A.
Washburn, Bridge Administrator,
Western Rivers, Coast Guard; telephone
314–269–2378, email Eric.Washburn@
uscg.mil.
SUMMARY:
The
Canadian Pacific Railroad requested a
temporary deviation for the Sabula
Railroad Drawbridge, across the Upper
Mississippi River, mile 535.0, at Sabula,
Iowa to open on signal if at least 24hours advance notice is given for 78
days from 7 a.m., December 16, 2015
until 7 a.m., March 4, 2016 for
scheduled maintenance on the bridge.
The Sabula Railroad Drawbridge
currently operates in accordance with
33 CFR 117.5, which states the general
requirement that the drawbridge shall
open on signal.
There are no alternate routes for
vessels transiting this section of the
SUPPLEMENTARY INFORMATION:
PO 00000
Frm 00030
Fmt 4700
Sfmt 4700
Upper Mississippi River. The bridge
cannot open in case of emergency.
Winter conditions on the Upper
Mississippi River coupled with the
closure of Army Corps of Engineer’s
Lock No. 13 (Mile 522.5 UMR) and Lock
No. 21 (Mile 324.9 UMR) from 7 a.m.
January 4, 2016 until 12 p.m., March 4,
2016 will preclude any significant
navigation demands for the drawspan
opening. In addition, Army Corps Lock
No. 14 (Mile 493.3 UMR) and Lock No.
17 (Mile 437.1 UMR) will be closed
from 7 a.m. December 14, 2015 until 12
p.m. March 2, 2016.
The Sabula Railroad Drawbridge
provides a vertical clearance of 18.1 feet
above normal pool in the closed-tonavigation position. Navigation on the
waterway consists primarily of
commercial tows and recreational
watercraft and will not be significantly
impacted. The drawbridge will open if
at least 24-hours advance notice is
given. This temporary deviation has
been coordinated with waterway users.
No objections were received.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: December 15, 2015.
Eric A. Washburn,
Bridge Administrator, Western Rivers.
[FR Doc. 2015–31917 Filed 12–18–15; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2015–1064]
Drawbridge Operation Regulation;
Atlantic Intracoastal Waterway,
Wrightsville Beach, NC
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the SR 74 Bascule
Bridge, across the Atlantic Intracoastal
Waterway (AIWW), mile 283.1, at
Wrightsville Beach, NC. The deviation
is necessary to accommodate the 7th
annual Quintiles Wrightsville Beach
Marathon. This deviation allows the
bridge to remain in the closed position
during the race to facilitate the safe
travels of the runners and bystanders.
SUMMARY:
E:\FR\FM\21DER1.SGM
21DER1
Agencies
[Federal Register Volume 80, Number 244 (Monday, December 21, 2015)]
[Rules and Regulations]
[Page 79260]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-31917]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2015-1099]
Drawbridge Operation Regulation; Upper Mississippi River, Sabula,
Iowa
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Sabula Railroad Drawbridge across
the Upper Mississippi River, mile 535.0, at Sabula, Iowa. The deviation
is necessary to allow the bridge owner time to perform preventive
maintenance that is essential to the safe operation of the drawbridge,
and is scheduled in the winter when there is less impact on navigation.
This deviation allows the bridge to open on signal if at least 24-hours
advance notice is given.
DATES: This deviation is effective without actual notice from December
21, 2015 through 7 a.m., March 4, 2016. For the purposes of
enforcement, actual notice will be used from 7 a.m., December 16, 2015
until December 21, 2015.
ADDRESSES: The docket for this deviation, [USCG-2015-1099] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH''. Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Eric A. Washburn, Bridge
Administrator, Western Rivers, Coast Guard; telephone 314-269-2378,
email Eric.Washburn@uscg.mil.
SUPPLEMENTARY INFORMATION: The Canadian Pacific Railroad requested a
temporary deviation for the Sabula Railroad Drawbridge, across the
Upper Mississippi River, mile 535.0, at Sabula, Iowa to open on signal
if at least 24-hours advance notice is given for 78 days from 7 a.m.,
December 16, 2015 until 7 a.m., March 4, 2016 for scheduled maintenance
on the bridge.
The Sabula Railroad Drawbridge currently operates in accordance
with 33 CFR 117.5, which states the general requirement that the
drawbridge shall open on signal.
There are no alternate routes for vessels transiting this section
of the Upper Mississippi River. The bridge cannot open in case of
emergency.
Winter conditions on the Upper Mississippi River coupled with the
closure of Army Corps of Engineer's Lock No. 13 (Mile 522.5 UMR) and
Lock No. 21 (Mile 324.9 UMR) from 7 a.m. January 4, 2016 until 12 p.m.,
March 4, 2016 will preclude any significant navigation demands for the
drawspan opening. In addition, Army Corps Lock No. 14 (Mile 493.3 UMR)
and Lock No. 17 (Mile 437.1 UMR) will be closed from 7 a.m. December
14, 2015 until 12 p.m. March 2, 2016.
The Sabula Railroad Drawbridge provides a vertical clearance of
18.1 feet above normal pool in the closed-to-navigation position.
Navigation on the waterway consists primarily of commercial tows and
recreational watercraft and will not be significantly impacted. The
drawbridge will open if at least 24-hours advance notice is given. This
temporary deviation has been coordinated with waterway users. No
objections were received.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: December 15, 2015.
Eric A. Washburn,
Bridge Administrator, Western Rivers.
[FR Doc. 2015-31917 Filed 12-18-15; 8:45 am]