Department of Homeland Security July 30, 2013 – Federal Register Recent Federal Regulation Documents
Results 1 - 14 of 14
Agency Information Collection Activities: Proposed Collection; Comment Request
The Federal Emergency Management Agency, as part of its continuing effort to reduce paperwork and respondent burden, invites the general public and other Federal agencies to take this opportunity to comment on a revision of a currently approved information collection. In accordance with the Paperwork Reduction Act of 1995, this notice seeks comments concerning enrollment for students and score assessments for FEMA's Independent Study Program.
Proposed Flood Hazard Determinations
On April 30, 2012, FEMA published in the Federal Register a proposed flood hazard determination notice that contained an erroneous table. This notice provides corrections to that table, to be used in lieu of the information published at 77 FR 25498. The table provided here represents the proposed flood hazard determinations and communities affected for Harrison County, Texas, and Incorporated Areas.
Proposed Flood Hazard Determinations
On April 11, 2012, FEMA published in the Federal Register a proposed flood hazard determination notice that contained an erroneous table. This notice provides corrections to that table, to be used in lieu of the information published at 77 FR 21792. The table provided here represents the proposed flood hazard determinations and communities affected for Gregg County, Texas, and Incorporated Areas.
Final Flood Hazard Determinations
Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or regulatory floodways on the Flood Insurance Rate Maps (FIRMs) and where applicable, in the supporting Flood Insurance Study (FIS) reports have been made final for the communities listed in the table below. The FIRM and FIS report are the basis of the floodplain management measures that a community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the Federal Emergency Management Agency's (FEMA's) National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report are used by insurance agents and others to calculate appropriate flood insurance premium rates for buildings and the contents of those buildings.
Changes in Flood Hazard Determinations
This notice lists communities where the addition or modification of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or the regulatory floodway (hereinafter referred to as flood hazard determinations), as shown on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports, prepared by the Federal Emergency Management Agency (FEMA) for each community, is appropriate because of new scientific or technical data. The FIRM, and where applicable, portions of the FIS report, have been revised to reflect these flood hazard determinations through issuance of a Letter of Map Revision (LOMR), in accordance with Title 44, Part 65 of the Code of Federal Regulations (44 CFR Part 65). The LOMR will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes, the currently effective community number is shown in the table below and must be used for all new policies and renewals.
Agency Information Collection Activities: Proposed Collection; Comment Request; National Flood Insurance Program Claim Forms
The Federal Emergency Management Agency, as part of its continuing effort to reduce paperwork and respondent burden, invites the general public and other Federal agencies to take this opportunity to comment on a revision of a currently approved information collection. In accordance with the Paperwork Reduction Act of 1995, this notice seeks comments concerning the collection of information related to the flood insurance claims process.
Changes in Flood Hazard Determinations
New or modified Base (1% annual-chance) Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, and/or the regulatory floodway (hereinafter referred to as flood hazard determinations) as shown on the indicated Letter of Map Revision (LOMR) for each of the communities listed in the table below are finalized. Each LOMR revises the Flood Insurance Rate Maps (FIRMs), and in some cases the Flood Insurance Study (FIS) reports, currently in effect for the listed communities. The flood hazard determinations modified by each LOMR will be used to calculate flood insurance premium rates for new buildings and their contents.
Final Flood Hazard Determinations
Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or regulatory floodways on the Flood Insurance Rate Maps (FIRMs) and where applicable, in the supporting Flood Insurance Study (FIS) reports have been made final for the communities listed in the table below. The FIRM and FIS report are the basis of the floodplain management measures that a community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the Federal Emergency Management Agency's (FEMA's) National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report are used by insurance agents and others to calculate appropriate flood insurance premium rates for buildings and the contents of those buildings.
Final Flood Hazard Determinations
Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or regulatory floodways on the Flood Insurance Rate Maps (FIRMs) and where applicable, in the supporting Flood Insurance Study (FIS) reports have been made final for the communities listed in the table below. The FIRM and FIS report are the basis of the floodplain management measures that a community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the Federal Emergency Management Agency's (FEMA's) National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report are used by insurance agents and others to calculate appropriate flood insurance premium rates for buildings and the contents of those buildings.
Final Flood Elevation Determinations
Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).
Final Flood Elevation Determinations
Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).
Drawbridge Operation Regulation; Willamette River at Portland, OR
The Coast Guard has issued a temporary deviation from the operating schedule that govern four Multnomah County bridges: The Broadway Bridge, mile 11.7, the Burnside Bridge, mile 12.4, the Morrison Bridge, mile 12.8, and the Hawthorne Bridge, mile 13.1, all crossing the Willamette River at Portland, OR. This deviation is necessary to accommodate the annual Portland Providence Bridge Pedal event. This deviation allows the bridges to remain in the closed position to allow safe movement of event participants.
Drawbridge Operation Regulation; Atlantic Intracoastal Waterway (AICW), Elizabeth River, Southern Branch, Chesapeake and Portsmouth, VA
The Coast Guard has issued a temporary deviation from the operating schedule that governs the operation of the Belt Line Railroad Bridge, across the Elizabeth River Southern Branch, AICW, mile 2.6, at Chesapeake and Portsmouth, VA. This deviation is necessary to facilitate mechanical and electrical upgrades on the Belt Line Railroad drawbridge. This temporary deviation allows the drawbridge to remain in the closed to navigation position.
Domestic Nuclear Detection Office; Announcement of Requirements and Registration for the National Radiological and Nuclear Detection Challenge; Correction
DNDO published a notice in the Federal Register of May 8, 2013, to announce the National Radiological and Nuclear Detection Challenge (Rad/Nuc Challenge), a participation challenge being conducted under the America Competes Reauthorization Act, for state, local, and tribal law enforcement, other first responders, public safety officials, and Civil Support Team members. This event has been postponed requiring a change to the date and location information.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.