Drawbridge Operation Regulation; Atlantic Intracoastal Waterway (AICW), Elizabeth River, Southern Branch, Chesapeake and Portsmouth, VA, 45863 [2013-18226]
Download as PDF
Federal Register / Vol. 78, No. 146 / Tuesday, July 30, 2013 / Rules and Regulations
withdrawn will not fulfill the
requirements under paragraph (g)(8) of
this section.
(h) Withdrawal of filing. A pipeline
may withdraw in its entirety a filing
pursuant to this section that has not
been approved by filing a withdrawal
motion with the Commission.
(1) The withdrawal motion must state
that any amounts collected subject to
refund in excess of the rates authorized
the Commission will be refunded with
interest calculated and a refund report
filed with the Commission in
accordance with § 154.501 of this
chapter. The refunds must be made
within 60 days of the date the
withdrawal motion becomes effective.
(2) The withdrawal motion will
become effective, and the filing will be
deemed withdrawn at the end of 15
days from the date of filing of the
withdrawal motion, if no order
disallowing the motion is issued within
that period. If an answer in opposition
is filed within the 15-day period, the
withdrawal is not effective until an
order accepting the withdrawal is
issued.
[FR Doc. 2013–17822 Filed 7–29–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2013–0633]
Drawbridge Operation Regulation;
Atlantic Intracoastal Waterway (AICW),
Elizabeth River, Southern Branch,
Chesapeake and Portsmouth, VA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the operation of
the Belt Line Railroad Bridge, across the
Elizabeth River Southern Branch, AICW,
mile 2.6, at Chesapeake and Portsmouth,
VA. This deviation is necessary to
facilitate mechanical and electrical
upgrades on the Belt Line Railroad
drawbridge. This temporary deviation
allows the drawbridge to remain in the
closed to navigation position.
DATES: This deviation is effective from
1 p.m. on August 12, 2013 to 7 p.m. on
August 15, 2013.
ADDRESSES: The docket for this
deviation, [USCG–2013–0633] is
available at https://www.regulations.gov.
emcdonald on DSK67QTVN1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
17:12 Jul 29, 2013
Jkt 229001
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mr. Jim
Rousseau, Bridge Administration
Branch Fifth District, Coast Guard;
telephone (757) 398–6557, email
James.L.Rousseau2@uscg.mil. If you
have questions on reviewing the docket,
call Barbara Hairston, Program Manager,
Docket Operations, (202) 366–9826.
SUPPLEMENTARY INFORMATION: The
Norfolk and Portsmouth Belt Line
Railroad Company, who owns and
operates this drawbridge, has requested
a temporary deviation from the current
operating regulations set out in 33 CFR
117.997(a) to facilitate replacement and
update of the motor and drive system
located in the bridge house.
Under the regular operating schedule,
the Belt Line Railroad Bridge across the
Elizabeth River Southern Branch, AICW
mile 2.6, between Portsmouth and
Chesapeake, VA, the draw normally is
open and only closes for train crossings
or periodic maintenance. The Belt Line
Railroad Bridge has a vertical clearance
in the closed to vessels position of 6 feet
above mean high water.
Under this temporary deviation, the
drawbridge will be maintained in the
closed to navigation position, from 1
p.m. to 7 p.m., on Monday August 12,
2013 and each day from 8 a.m. to 7 p.m.,
on Tuesday, Wednesday, and Thursday,
August 13, 14, and 15, 2013,
respectively. The bridge will operate
under its normal operating schedule at
all other times. The bridge normally is
maintained in the open to navigation
position with several vessels transiting
a week and only closes when trains
transit. The Elizabeth River Southern
Branch is used by a variety of vessels
including military, tugs, commercial,
and recreational vessels. The Coast
Guard has carefully coordinated the
restrictions with these waterway users.
Vessels able to pass under the bridge
in the closed position may do so at
anytime and are advised to proceed
with caution. The bridge will be able to
open for emergencies with a one hour
advanced notification on marine
channel 13 or calling 757–271–1741 or
757–633–2241. There is no immediate
PO 00000
Frm 00023
Fmt 4700
Sfmt 4700
45863
alternate route for vessels transiting this
section of the Elizabeth River but
vessels may pass before and after the
closure each day. The Coast Guard will
also inform additional waterway users
through our Local and Broadcast
Notices to Mariners of the closure
periods for the bridge so that vessels can
arrange their transits to minimize any
impacts caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
Dated: July 18, 2013.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard
District.
[FR Doc. 2013–18226 Filed 7–29–13; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2013–0679]
Drawbridge Operation Regulation;
Willamette River at Portland, OR
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that govern four Multnomah
County bridges: The Broadway Bridge,
mile 11.7, the Burnside Bridge, mile
12.4, the Morrison Bridge, mile 12.8,
and the Hawthorne Bridge, mile 13.1, all
crossing the Willamette River at
Portland, OR. This deviation is
necessary to accommodate the annual
Portland Providence Bridge Pedal event.
This deviation allows the bridges to
remain in the closed position to allow
safe movement of event participants.
DATES: This deviation is effective from
5 a.m. on August 11, 2013 to 12:30 p.m.
August 11, 2013.
ADDRESSES: The docket for this
deviation, [USCG–2013–0679] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
SUMMARY:
E:\FR\FM\30JYR1.SGM
30JYR1
Agencies
[Federal Register Volume 78, Number 146 (Tuesday, July 30, 2013)]
[Rules and Regulations]
[Page 45863]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-18226]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2013-0633]
Drawbridge Operation Regulation; Atlantic Intracoastal Waterway
(AICW), Elizabeth River, Southern Branch, Chesapeake and Portsmouth, VA
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the operation of the Belt Line Railroad
Bridge, across the Elizabeth River Southern Branch, AICW, mile 2.6, at
Chesapeake and Portsmouth, VA. This deviation is necessary to
facilitate mechanical and electrical upgrades on the Belt Line Railroad
drawbridge. This temporary deviation allows the drawbridge to remain in
the closed to navigation position.
DATES: This deviation is effective from 1 p.m. on August 12, 2013 to 7
p.m. on August 15, 2013.
ADDRESSES: The docket for this deviation, [USCG-2013-0633] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140 on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Mr. Jim Rousseau, Bridge
Administration Branch Fifth District, Coast Guard; telephone (757) 398-
6557, email James.L.Rousseau2@uscg.mil. If you have questions on
reviewing the docket, call Barbara Hairston, Program Manager, Docket
Operations, (202) 366-9826.
SUPPLEMENTARY INFORMATION: The Norfolk and Portsmouth Belt Line
Railroad Company, who owns and operates this drawbridge, has requested
a temporary deviation from the current operating regulations set out in
33 CFR 117.997(a) to facilitate replacement and update of the motor and
drive system located in the bridge house.
Under the regular operating schedule, the Belt Line Railroad Bridge
across the Elizabeth River Southern Branch, AICW mile 2.6, between
Portsmouth and Chesapeake, VA, the draw normally is open and only
closes for train crossings or periodic maintenance. The Belt Line
Railroad Bridge has a vertical clearance in the closed to vessels
position of 6 feet above mean high water.
Under this temporary deviation, the drawbridge will be maintained
in the closed to navigation position, from 1 p.m. to 7 p.m., on Monday
August 12, 2013 and each day from 8 a.m. to 7 p.m., on Tuesday,
Wednesday, and Thursday, August 13, 14, and 15, 2013, respectively. The
bridge will operate under its normal operating schedule at all other
times. The bridge normally is maintained in the open to navigation
position with several vessels transiting a week and only closes when
trains transit. The Elizabeth River Southern Branch is used by a
variety of vessels including military, tugs, commercial, and
recreational vessels. The Coast Guard has carefully coordinated the
restrictions with these waterway users.
Vessels able to pass under the bridge in the closed position may do
so at anytime and are advised to proceed with caution. The bridge will
be able to open for emergencies with a one hour advanced notification
on marine channel 13 or calling 757-271-1741 or 757-633-2241. There is
no immediate alternate route for vessels transiting this section of the
Elizabeth River but vessels may pass before and after the closure each
day. The Coast Guard will also inform additional waterway users through
our Local and Broadcast Notices to Mariners of the closure periods for
the bridge so that vessels can arrange their transits to minimize any
impacts caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period.
This deviation from the operating regulations is authorized under
33 CFR 117.35.
Dated: July 18, 2013.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2013-18226 Filed 7-29-13; 8:45 am]
BILLING CODE 9110-04-P