Department of Energy June 22, 2012 – Federal Register Recent Federal Regulation Documents

Amended Notice of Intent To Prepare the Environmental Impact Statement for a Proposed Federal Loan Guarantee for the Indiana Gasification, LLC, Industrial Gasification Facility in Rockport, IN, and CO2
Document Number: 2012-15374
Type: Notice
Date: 2012-06-22
Agency: Department of Energy
The U.S. Department of Energy (DOE) announces its intent to expand the scope of an environmental impact statement (EIS) (DOE/EIS- 0429) to analyze the environmental impacts for its proposed action of issuing a Federal loan guarantee to Indiana Gasification, LLC, (IG) for the construction and startup of both a proposed coal-to-substitute natural gas (SNG) gasification facility in Rockport, Indiana, and a proposed carbon dioxide (CO2) pipeline. On November 12, 2009, DOE issued a Notice of Intent (NOI) to prepare an EIS, titled ``Environmental Impact Statement for a Proposed Federal Loan Guarantee for the Indiana Gasification, LLC, Industrial Gasification Facility in Rockport, Indiana,'' to analyze the construction and startup of the SNG facility. The NOI invited comments on the proposed scope and content of the EIS. DOE also conducted a scoping meeting in Rockport on December 3, 2009. IG originally intended to capture and sell the CO2 produced during the gasification process to a third party, Denbury Resources, Inc., (Denbury), which would construct a pipeline to transport CO2 from the SNG facility in Rockport to storage facilities or oil fields, where it would be used for enhanced oil recovery (EOR) operations. In the event a CO2 pipeline was not constructed by Denbury and there was no other reasonable alternative to sequester the CO2, the CO2 would have been released to the atmosphere. In October 2011, IG requested an increase in the amount of DOE's loan guarantee for the proposed project to cover additional costs to incorporate the construction and startup of a proposed 441-mile CO2 pipeline. This pipeline would transport as liquefied gas 85% to 90% of the CO2 generated at the proposed SNG facility (approximately 6.4 million tons annually), from Rockport, Indiana, across Kentucky and Tennessee, to Tinsley in Yazoo County, Mississippi. At Tinsley the pipeline would connect to Denbury's existing Delta CO2 Pipeline for distribution of CO2 for eventual use by Denbury in EOR operations in the Gulf Coast region. Accordingly, DOE is issuing this Amended NOI to invite Federal agencies, state and local governments, Native American tribes, other organizations, and members of the public to submit comments that identify environmental issues associated with adding the CO2 pipeline to the original project (the SNG facility). DOE hereby invites public participation in shaping the broadened scope of the ongoing EIS, now retitled ``Environmental Impact Statement for a Proposed Federal Loan Guarantee for the Indiana Gasification, LLC, Industrial Gasification Facility in Rockport, Indiana, and CO2 Pipeline.'' DOE also provides notice of the intent to prepare a floodplain and wetland assessment. DOE invites those agencies with jurisdiction by law, or special expertise related to the modified proposed action, to request cooperating agency status to assist with the preparation of the EIS.
Natural Gas Pipeline Company of America LLC; Notice of Request Under Blanket Authorization
Document Number: 2012-15257
Type: Notice
Date: 2012-06-22
Agency: Department of Energy, Federal Energy Regulatory Commission
CenterPoint Energy Gas Transmission Company, LLC; Notice of Request Under Blanket Authorization
Document Number: 2012-15256
Type: Notice
Date: 2012-06-22
Agency: Department of Energy, Federal Energy Regulatory Commission
Northwest Pipeline GP; Notice of Application
Document Number: 2012-15255
Type: Notice
Date: 2012-06-22
Agency: Department of Energy, Federal Energy Regulatory Commission
Notice of Commission Staff Attendance
Document Number: 2012-15251
Type: Notice
Date: 2012-06-22
Agency: Department of Energy, Federal Energy Regulatory Commission
Notice of Commission Staff Attendance
Document Number: 2012-15250
Type: Notice
Date: 2012-06-22
Agency: Department of Energy, Federal Energy Regulatory Commission
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.