Federal Register / Vol. 77, No. 121 / Friday, June 22, 2012 / Notices
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: July 6, 2012
Dated: June 15, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–15255 Filed 6–21–12; 8:45 am]
wreier-aviles on DSK7SPTVN1PROD with NOTICES
BILLING CODE 6717–01–P
VerDate Mar<15>2010
15:20 Jun 21, 2012
Jkt 226001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14217–000]
Ogden City Corporation; Notice of
Intent To File License Application,
Filing of Pre-Application Document,
and Approving Use of the Traditional
Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 14217–000.
c. Date Filed: June 28, 2011.
d. Submitted By: Ogden City
Corporation.
e. Name of Project: Pineview Water
Treatment Plant 25kW Hydroelectric
Project.
f. Location: On Wheeler Creek and the
Ogden River, in Weber County, Utah.
The proposed project may occupy of
United States lands administered by the
U.S. Department of Agriculture’s U.S.
Forest Service and/or the Department of
the Interior’s Bureau of Reclamation.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Ken
Gradner, Gardner Engineering
Alternative Energy Services, 5875 South
Adams Ave. Parkway, Ogden, Utah
84405; (801) 589–0447; email—
ken@gardner-energy.com.
i. FERC Contact: Kenneth Hogan at
(202) 502–8434; or email at:
kenneth.hogan@ferc.gov.
j. Ogden City Corporation filed its
request to use the Traditional Licensing
Process on June 28, 2011. Ogden City
Corporation provided public notice of
its request on March 29, 2012. In a letter
dated June 15, 2012, the Director of the
Division of Hydropower Licensing
approved Ogden City Corporation
request to use the Traditional Licensing
Process.
k. With this notice, we are initiating
informal consultation with: (a) The US
Fish and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at
50 CFR, Part 402; (b) NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920; and (c)
the Utah State Historic Preservation
Officer, as required by section 106,
National Historical Preservation Act,
and the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. Ogden City Corporation filed a PreApplication Document (PAD) with the
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
Commission, pursuant to 18 CFR 5.6 of
the Commission’s regulations.
m. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in paragraph h.
n. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: June 15, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–15252 Filed 6–21–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meetings related to
the transmission planning activities of
the PJM Interconnection, L.L.C. (PJM):
PJM Regional Transmission Planning
Task Force Conference Call
June 18, 2012, 9:30 a.m.–1 p.m., Local
Time.
Combined PJM Markets and Reliability
Committee/Members Committee
June 28, 2012, 9:00 a.m.–5 p.m., Local
Time.
The above-referenced meeting will be
held over conference call or at: The
Chase Center on the Riverfront,
Wilmington, DE.
The above-referenced meetings are
open to stakeholders.
Further information may be found at
www.pjm.com.
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
Docket No. EL05–121, PJM
Interconnection, L.L.C.
E:\FR\FM\22JNN1.SGM
22JNN1
wreier-aviles on DSK7SPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 121 / Friday, June 22, 2012 / Notices
Docket Nos. ER06–456, ER06–954,
ER06–1271, ER07–424, ER06–880,
EL07–57, ER07–1186, ER08–229,
ER08–1065, ER09–497, and ER10–
268, PJM Interconnection, L.L.C.
Docket No. ER10–253 and EL10–14,
Primary Power, L.L.C.
Docket No. EL10–52, Central
Transmission, LLC v. PJM
Interconnection, L.L.C.
Docket No. ER11–4070, RITELine
Indiana et. al.
Docket No. ER11–2875 and EL11–20,
PJM Interconnection, L.L.C.
Docket No. ER09–1256, PotomacAppalachian Transmission Highline,
L.L.C.
Docket No. ER09–1589, FirstEnergy
Service Company
Docket No. ER10–549, PJM
Interconnection, L.L.C.
Docket No. EL11–56, FirstEnergy
Service Company
Docket No. EL12–38, New York
Independent System Operator, Inc.
Docket No. ER11–1844, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER11–2140, PJM
Interconnection, L.L.C.
Docket No. ER11–2622, PJM
Interconnection, L.L.C.
Docket No. ER11–3106, PJM
Interconnection, L.L.C.
Docket No. ER11–4379, PJM
Interconnection, L.L.C.
Docket No. ER12–445, PJM
Interconnection, L.L.C.
Docket No. ER12–773, PJM
Interconnection, L.L.C.
Docket No. ER12–718, New York
Independent System Operator, Inc.
Docket No. ER12–1177, PJM
Interconnection, L.L.C.
Docket No. ER12–1178, PJM
Interconnection, L.L.C.
Docket No. ER12–1693, PJM
Interconnection, L.L.C.
Docket No. EL12–69, Primary Power
LLC v. PJM Interconnection, L.L.C.
Docket No. ER12–1700, PJM
Interconnection, L.L.C.
Docket No. ER12–1810, PJM
Interconnection, L.L.C.
Docket No. ER12–1901, GenOn Power
Midwest, LP
For more information, contact
Jonathan Fernandez, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission at (202) 502–
6604 or jonathan.fernandez@ferc.gov.
Dated: June 15, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–15250 Filed 6–21–12; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
15:20 Jun 21, 2012
Jkt 226001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meeting related to
the transmission planning activities of
the North Carolina Transmission
Planning Collaborative:
Transmission Advisory Group
June 19, 2012, 1:30 p.m., Local Time.
The above-referenced meeting will be
held at:
North Carolina Electric Membership
Corporation, 3400 Sumner Boulevard
Raleigh, North Carolina.
The above-referenced meeting is open
to stakeholders.
Further information may be found at
www.nctpc.org.
The discussions at the meeting
described above may address matters at
issue in the following proceeding:
Docket No. EC11–60, Duke Energy
Corporation and Progress Energy, Inc.
For more information, contact
Michael Lee, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (202) 502–8658 or
michael.lee@ferc.gov.
Dated: June 15, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–15251 Filed 6–21–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP12–72–000]
Notice of Availability of the
Environmental Assessment for the
Proposed Allegheny Storage Project;
Dominion Transmission, Incorporated
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
Environmental Assessment (EA) for the
Allegheny Storage Project, proposed by
Dominion Transmission, Incorporated
(DTI) in the above-referenced docket.
DTI requests authorization to construct
pipeline facilities in Maryland, Ohio,
West Virginia, and Pennsylvania. The
project would increase natural gas
storage capacity along DTI’s system by
125,000 dekatherms per day (Dth/d) and
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
37665
increase firm transportation service by
115,000 Dth/d.
The EA assesses the potential
environmental effects of the
construction and operation of the
Allegheny Storage Project in accordance
with the requirements of the National
Environmental Policy Act (NEPA). The
FERC staff concludes that approval of
the proposed project, with appropriate
mitigating measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
The proposed Allegheny Storage
Project includes the following facilities:
• A new 16,000-horsepower (hp)
Myersville Compressor Station, 0.6-mile
of 30-inch-diameter suction and
discharge pipelines, a new valve site,
and upgrades at the existing Tuscarora
Metering and Regulating (M&R) Station
in Frederick County, Maryland;
• A new 3,550-hp Mullett
Compressor Station, 0.5-mile of 16-inchdiameter suction and 10-inch-diameter
discharge pipelines, and upgrades at the
existing Mullett 1 M&R Station in
Monroe County, Ohio;
• Installation of additional
dehydration at the existing Wolf Run
Compressor Station in Lewis County,
West Virginia; and
• 1.8 miles of 16-inch-diameter
replacement pipeline, 1.3 miles of 20inch-diameter replacement pipeline,
and installation of ancillary equipment
at the Sabinsville Storage Station in
Tioga County, Pennsylvania.
The FERC staff mailed copies of the
EA to federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
newspapers and libraries in the project
area; and parties to this proceeding. In
addition, the EA is available for public
viewing on the FERC’s Web site
(www.ferc.gov) using the eLibrary link.
A limited number of copies of the EA
are available for distribution and public
inspection at:
Federal Energy Regulatory Commission,
Public Reference Room, 888 First
Street NE., Room 2A, Washington, DC
20426, (202) 502–8371.
Any person wishing to comment on
the EA may do so. Your comments
should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. The more
specific your comments, the more useful
they will be. To ensure that the
Commission has the opportunity to
E:\FR\FM\22JNN1.SGM
22JNN1
Agencies
[Federal Register Volume 77, Number 121 (Friday, June 22, 2012)]
[Notices]
[Pages 37664-37665]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-15250]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission Staff Attendance
The Federal Energy Regulatory Commission hereby gives notice that
members of the Commission's staff may attend the following meetings
related to the transmission planning activities of the PJM
Interconnection, L.L.C. (PJM):
PJM Regional Transmission Planning Task Force Conference Call
June 18, 2012, 9:30 a.m.-1 p.m., Local Time.
Combined PJM Markets and Reliability Committee/Members Committee
June 28, 2012, 9:00 a.m.-5 p.m., Local Time.
The above-referenced meeting will be held over conference call or
at: The Chase Center on the Riverfront, Wilmington, DE.
The above-referenced meetings are open to stakeholders.
Further information may be found at www.pjm.com.
The discussions at the meeting described above may address matters
at issue in the following proceedings:
Docket No. EL05-121, PJM Interconnection, L.L.C.
[[Page 37665]]
Docket Nos. ER06-456, ER06-954, ER06-1271, ER07-424, ER06-880, EL07-57,
ER07-1186, ER08-229, ER08-1065, ER09-497, and ER10-268, PJM
Interconnection, L.L.C.
Docket No. ER10-253 and EL10-14, Primary Power, L.L.C.
Docket No. EL10-52, Central Transmission, LLC v. PJM Interconnection,
L.L.C.
Docket No. ER11-4070, RITELine Indiana et. al.
Docket No. ER11-2875 and EL11-20, PJM Interconnection, L.L.C.
Docket No. ER09-1256, Potomac-Appalachian Transmission Highline, L.L.C.
Docket No. ER09-1589, FirstEnergy Service Company
Docket No. ER10-549, PJM Interconnection, L.L.C.
Docket No. EL11-56, FirstEnergy Service Company
Docket No. EL12-38, New York Independent System Operator, Inc.
Docket No. ER11-1844, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER11-2140, PJM Interconnection, L.L.C.
Docket No. ER11-2622, PJM Interconnection, L.L.C.
Docket No. ER11-3106, PJM Interconnection, L.L.C.
Docket No. ER11-4379, PJM Interconnection, L.L.C.
Docket No. ER12-445, PJM Interconnection, L.L.C.
Docket No. ER12-773, PJM Interconnection, L.L.C.
Docket No. ER12-718, New York Independent System Operator, Inc.
Docket No. ER12-1177, PJM Interconnection, L.L.C.
Docket No. ER12-1178, PJM Interconnection, L.L.C.
Docket No. ER12-1693, PJM Interconnection, L.L.C.
Docket No. EL12-69, Primary Power LLC v. PJM Interconnection, L.L.C.
Docket No. ER12-1700, PJM Interconnection, L.L.C.
Docket No. ER12-1810, PJM Interconnection, L.L.C.
Docket No. ER12-1901, GenOn Power Midwest, LP
For more information, contact Jonathan Fernandez, Office of Energy
Market Regulation, Federal Energy Regulatory Commission at (202) 502-
6604 or jonathan.fernandez@ferc.gov.
Dated: June 15, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-15250 Filed 6-21-12; 8:45 am]
BILLING CODE 6717-01-P