Department of Energy June 13, 2012 – Federal Register Recent Federal Regulation Documents
Results 1 - 27 of 27
Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Energy Conservation Standards for Residential Water Heaters
The U.S. Department of Energy (DOE) is requesting data and information about the impact of its recently amended energy conservation standards for residential electric water heaters on utility programs that use high-storage-volume (above 55 gallons) electric storage water heaters to reduce peak electricity demand. DOE amended its standards for residential water heaters on April 16, 2010, and compliance with the amended standards is required beginning on April 16, 2015. Of particular relevance, the amended standards for residential water heaters raised the minimum requirements for electric storage water heaters with storage volumes above 55 gallons to levels that are currently achieved through the use of heat pump water heater technology. Utilities have expressed concerns that the amended levels will negatively impact programs designed to reduce peak energy demand by heating water only during off-peak times and storing the water for use during peak demand periods. This request for information solicits feedback on the effects of the amended energy conservation standards for electric storage water heaters on such utility programs.
Albany-Eugene Transmission Line Rebuild Project
This notice announces the availability of the ROD to implement the Proposed Action Alternative, based on the Albany-Eugene Transmission Line Rebuild Project (DOE/EIS-0457, March 2012). BPA has decided to rebuild a 32-mile section of the existing Albany-Eugene 115- kV transmission line that extends from the Albany Substation in the City of Albany in Linn County, Oregon, to the Alderwood Tap near Junction City in Lane County, Oregon. Rebuild activities will include removing and replacing existing wood-pole structures and associated structural components and conductors, establishing better access to the line, improving access roads, developing staging areas for storage of materials, removing vegetation including danger trees, and revegetating areas disturbed by construction activities. The existing structures will be replaced with structures of similar design within or near to their existing locations. The line will continue to operate at 115 kV.
Proposed Subsequent Arrangement
This notice is being issued under the authority of section 131a.of the Atomic Energy Act of 1954, as amended. The Department is providing notice of a proposed subsequent arrangement under the Agreement for Cooperation Between the Government of the United States of America and the Government of Japan Concerning Peaceful Uses of Nuclear Energy and the Agreement for Cooperation Between the United States of America and the Republic of Kazakhstan Concerning Peaceful Uses of Nuclear Energy.
Agency Information Collection Extension
The Department of Energy (DOE) has submitted an information collection request to the OMB for extension under the provisions of the Paperwork Reduction Act of 1995. The information collection requests a three-year extension of its Historic Preservation for Energy Efficiency Programs, OMB Control Number 1910-5155. The proposed collection will allow DOE to continue data collection on the status of Weatherization Assistance Program (WAP), State Energy Program (SEP) and Energy Efficiency and Conservation Block Grant (EECBG) Program activities to ensure that recipients are compliant with Section 106 of the National Historic Preservation Act (NHPA).
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.