Qualified Hydro 24, LLC; Notice of Cancellation of Scoping Meetings and Environmental Site Review, 35371-35372 [2012-14449]

Download as PDF erowe on DSK2VPTVN1PROD with NOTICES Federal Register / Vol. 77, No. 114 / Wednesday, June 13, 2012 / Notices Filed Date: 6/6/12. Accession Number: 20120606–5046. Comments Due: 5 p.m. ET 6/27/12. Docket Numbers: ER12–1964–000. Applicants: Wisconsin Electric Power Company. Description: Wisconsin Electric Power Company submits Notice of Cancellation. Filed Date: 6/6/12. Accession Number: 20120606–5092. Comments Due: 5 p.m. ET 6/27/12. Docket Numbers: ER12–1965–000. Applicants: Wisconsin Electric Power Company. Description: Wisconsin Electric Power Company submits Notice of Cancellation. Filed Date: 6/6/12. Accession Number: 20120606–5095. Comments Due: 5 p.m. ET 6/27/12. Docket Numbers: ER12–1966–000. Applicants: Wisconsin Electric Power Company. Description: Wisconsin Electric Power Company submits Notice of Cancellation. Filed Date: 6/6/12. Accession Number: 20120606–5096. Comments Due: 5 p.m. ET 6/27/12. Docket Numbers: ER12–1967–000. Applicants: Wisconsin Electric Power Company. Description: Wisconsin Electric Power Company submits Notice of Cancellation. Filed Date: 6/6/12. Accession Number: 20120606–5097. Comments Due: 5 p.m. ET 6/27/12. Take notice that the Commission received the following electric reliability filings. Docket Numbers: RD12–4–000. Applicants: North American Electric Reliability Corporation. Description: North American Electric Reliability Corporation Petition for Approval of Errata Changes to Seven Reliability Standards. Filed Date: 6/5/12. Accession Number: 20120605–5160. Comments Due: 5 p.m. ET 6/26/12. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing VerDate Mar<15>2010 14:45 Jun 12, 2012 Jkt 226001 requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 06, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–14364 Filed 6–12–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER12–1956–000. Applicants: Duke Energy Miami Fort, LLC. Description: MBR Filing to be effective 10/1/2012. Filed Date: 6/5/12. Accession Number: 20120605–5113. Comments Due: 5 p.m. ET 6/26/12. Docket Numbers: ER12–1957–000. Applicants: Duke Energy Miami Fort, LLC. Description: Reactive Filing to be effective 12/31/9998. Filed Date: 6/5/12. Accession Number: 20120605–5114. Comments Due: 5 p.m. ET 6/26/12. Docket Numbers: ER12–1958–000. Applicants: Duke Energy Piketon, LLC. Description: MBR Filing to be effective 10/1/2012. Filed Date: 6/5/12. Accession Number: 20120605–5115. Comments Due: 5 p.m. ET 6/26/12. Docket Numbers: ER12–1959–000. Applicants: Duke Energy Stuart, LLC. Description: MBR Filing to be effective 10/1/2012. Filed Date: 6/5/12. Accession Number: 20120605–5116. Comments Due: 5 p.m. ET 6/26/12. Docket Numbers: ER12–1960–000. Applicants: Duke Energy Stuart, LLC. Description: Reactive Filing to be effective 12/31/9998. Filed Date: 6/5/12. Accession Number: 20120605–5117. Comments Due: 5 p.m. ET 6/26/12. Docket Numbers: ER12–1961–000. Applicants: Duke Energy Zimmer, LLC. Description: MBR Filing to be effective 10/1/2012. Filed Date: 6/5/12. Accession Number: 20120605–5125. PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 35371 Comments Due: 5 p.m. ET 6/26/12. Docket Numbers: ER12–1962–000. Applicants: Duke Energy Zimmer, LLC. Description: Reactive Filing to be effective 12/31/9998. Filed Date: 6/5/12. Accession Number: 20120605–5128. Comments Due: 5 p.m. ET 6/26/12. Docket Numbers: ER12–1963–000. Applicants: Consolidated Edison Company of New York, Inc. Description: Consolidated Edison Company of New York, Inc notifies the Commission that it is cancelling FERC Rate Schedule No. 78 (RS 78) and FERC Rate Schedule No. 102 (RS 102). Filed Date: 6/5/12. Accession Number: 20120605–5151. Comments Due: 5 p.m. ET 6/26/12. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 06, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–14363 Filed 6–12–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13843–001] Qualified Hydro 24, LLC; Notice of Cancellation of Scoping Meetings and Environmental Site Review Take notice that Qualified Hydro 24, LLC, filed a request on June 4, 2012, to surrender the preliminary permit for the proposed Cle Elum Hydroelectric Project. The project would have been located at the U.S. Bureau of Reclamation’s Cle Elum dam on the Cle Elum River near Cle Elum, in Kittitas County, Washington. By separate notice, E:\FR\FM\13JNN1.SGM 13JNN1 35372 Federal Register / Vol. 77, No. 114 / Wednesday, June 13, 2012 / Notices the Integrated Licensing Process for the Cle Elum Project will be terminated. Therefore, the scoping meetings and environmental site visit scheduled for June 13, 2012 in Cle Elum, Washington are cancelled. Dated: June 6, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–14449 Filed 6–12–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12–1958–000] Dated: June 7, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. erowe on DSK2VPTVN1PROD with NOTICES Duke Energy Piketon, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization [FR Doc. 2012–14353 Filed 6–12–12; 8:45 am] BILLING CODE 6717–01–P This is a supplemental notice in the above-referenced proceeding of Duke Energy Piketon, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is June 27, 2012. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, VerDate Mar<15>2010 14:45 Jun 12, 2012 Jkt 226001 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12–1961–000] Duke Energy Zimmer, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Duke Energy Zimmer, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is June 27, 2012. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 7, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–14355 Filed 6–12–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12–1924–000] EverPower Commercial Services LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of EverPower Commercial Services LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to E:\FR\FM\13JNN1.SGM 13JNN1

Agencies

[Federal Register Volume 77, Number 114 (Wednesday, June 13, 2012)]
[Notices]
[Pages 35371-35372]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-14449]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13843-001]


Qualified Hydro 24, LLC; Notice of Cancellation of Scoping 
Meetings and Environmental Site Review

    Take notice that Qualified Hydro 24, LLC, filed a request on June 
4, 2012, to surrender the preliminary permit for the proposed Cle Elum 
Hydroelectric Project. The project would have been located at the U.S. 
Bureau of Reclamation's Cle Elum dam on the Cle Elum River near Cle 
Elum, in Kittitas County, Washington. By separate notice,

[[Page 35372]]

the Integrated Licensing Process for the Cle Elum Project will be 
terminated. Therefore, the scoping meetings and environmental site 
visit scheduled for June 13, 2012 in Cle Elum, Washington are 
cancelled.

    Dated: June 6, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-14449 Filed 6-12-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.