Department of Energy April 6, 2012 – Federal Register Recent Federal Regulation Documents
Results 1 - 16 of 16
Application to Export Electric Energy; PPL EnergyPlus, LLC
PPL EnergyPlus, LLC. (PPL EnergyPlus) has applied to renew its authority to transmit electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act (FPA).
Nationwide Categorical Waivers Under the American Recovery and Reinvestment Act of 2009 (Recovery Act)
The U.S. Department of Energy (DOE) is hereby granting a nationwide limited waiver of the Buy American requirements of section 1605 of the Recovery Act under the authority of Section 1605(b)(2), (iron, steel, and the relevant manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality), with respect to Recovery Act projects funded by EERE for pre-insulated district heating pipe system consisting of thin wall thickness steel pipe meeting the EN13941 standard, bonded to polyurethane foam insulation, bonded to an HDPE jacket, such that all the components operate as a single pipe (including two 1.5 mm squared area copper wires embedded in the insulation for leak detection and location); pre-insulated steel fittings with the same characteristics as the pre-insulated pipe; and pre-insulated maintenance free ball valves with an all welded valve body and a stainless steel valve ball in a spring loaded teflon seat, having the same insulation and jacket characteristics as the pipe.
Protective Force Personnel Medical, Physical Readiness, Training, and Access Authorization Standards
This document announces that the period for submitting comments on the proposed rule to amend the standards for medical, physical performance, training, and access authorizations for protective force (PF) personnel employed by contractors providing security services to the Department will be extended until April 13, 2012.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.