Black Bear Hydro Partners, LLC; Notice of Application Accepted for Filing, Ready for Environmental Analysis, Soliciting Motions to Intervene, Protests, Comments, Recommendations, Terms and Conditions, and Fishway Prescriptions, 20808-20809 [2012-8266]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
20808
Federal Register / Vol. 77, No. 67 / Friday, April 6, 2012 / Notices
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
VerDate Mar<15>2010
16:17 Apr 05, 2012
Jkt 226001
and 7 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: April 6, 2012.
Dated: March 30, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–8267 Filed 4–5–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 2710–057; 2712–074]
Black Bear Hydro Partners, LLC;
Notice of Application Accepted for
Filing, Ready for Environmental
Analysis, Soliciting Motions to
Intervene, Protests, Comments,
Recommendations, Terms and
Conditions, and Fishway Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Amendment
of Licenses.
b. Project Nos.: 2710–057 and 2712–
074.
c. Date Filed: May 18, 2011,
supplemented on October 7, 2011,
January 20, 2012, and March 14, 2012.
d. Applicant: Black Bear Hydro
Partners, LLC.
e. Name of Projects: Orono Project
2710–057; Stillwater Project 2712–074.
f. Location: The projects are located
on the Stillwater Branch of the
Penobscot River in Penobscot County,
Maine.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Scott D.
Hall, Black Bear Hydro Partners, LLC,
P.O. Box 276, Davenport Street, Milford,
ME 04461, (207) 827–2247.
i. FERC Contact: Ms. Rachel Price at
(202) 502–8907 or
Rachel.Price@ferc.gov.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
j. Deadline for filing motions to
intervene, protests, comments,
recommendations, terms and
conditions, and fishway prescriptions is
60 days from the issuance date of this
notice; reply comments are due 105
days from the issuance date of this
notice.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments.
Please include the project numbers
(P–2710–057 and/or P–2712–074) on
any motions, protests, comments,
recommendations, terms and
conditions, or fishway prescriptions
filed.
k. Description of Application: At the
Orono Project the applicant proposes to:
construct and operate a second
powerhouse containing three turbinegenerator units with an installed
capacity of 3.738 megawatts (MW);
increase the normal maximum surface
elevation of the reservoir by 0.6 feet;
replace the existing downstream fish
passage facility and install a new fish
trapping facility (required by ordering
paragraphs D and E of the project
license); and extend the license term by
three years so that it would expire in
2048. At the Stillwater Project the
applicant proposes to: construct and
operate a second powerhouse
containing three turbine-generator units
with an installed capacity of 2.229 MW;
new downstream fish passage and
upstream eel passage facilities; and
extend the license term by 10 years so
that it would expire in 2048.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
E:\FR\FM\06APN1.SGM
06APN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 67 / Friday, April 6, 2012 / Notices
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call (866) 208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Motions to Intervene, Protests, and
Comments: Anyone may submit a
motion to intervene, protest, or
comments in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any motions to
intervene, protests, or comments must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must: (1) Bear in
all capital letters the title ‘‘MOTION TO
INTERVENE,’’ ‘‘PROTEST,’’
‘‘COMMENTS, ’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or ‘‘FISHWAY
PRESCRIPTIONS’’ as applicable; (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
intervening, protesting, or commenting;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All motions to
intervene, protests, or comments must
set forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). All motions to
intervene, protests, or comments should
relate to project works which are the
subject of the application. Agencies may
obtain copies of the application directly
from the applicant. A copy of any
motion to intervene or protest must be
served upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
VerDate Mar<15>2010
16:17 Apr 05, 2012
Jkt 226001
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: March 30, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–8266 Filed 4–5–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP12–538–000.
Applicants: CenterPoint Energy Gas
Transmission Company, LLC.
Description: CEGT LLC—Revenue
Crediting—May 2012 to be effective 5/
1/2012.
Filed Date: 3/29/12.
Accession Number: 20120329–5108.
Comments Due: 5 p.m. ET 4/10/12.
Docket Numbers: RP12–539–000.
Applicants: Elba Express Company,
L.L.C.
Description: 2012 Annual
Interruptible Revenue Crediting Report
of Elba Express Company, L.L.C.
Filed Date: 3/29/12.
Accession Number: 20120329–5116.
Comments Due: 5 p.m. ET 4/10/12.
Docket Numbers: RP12–540–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: HK 37731 to Texla 39715
Capacity Release Negotiated Rate
Agreement filing to be effective 4/1/
2012.
Filed Date: 3/29/12.
Accession Number: 20120329–5135.
Comments Due: 5 p.m. ET 4/10/12.
Docket Numbers: RP12–541–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: HK 37731 to Sequent
39725 Capacity Release Negotiated Rate
Agreement filing to be effective 4/1/
2012.
Filed Date: 3/29/12.
Accession Number: 20120329–5138.
Comments Due: 5 p.m. ET 4/10/12.
Docket Numbers: RP12–542–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: Capacity Release
Negotiated Rate HK 37731 to Spark
39714 to be effective 4/1/2012.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
20809
Filed Date: 3/29/12.
Accession Number: 20120329–5139.
Comments Due: 5 p.m. ET 4/10/12.
Docket Numbers: RP12–543–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: ONEOK 34951 to BG
39727 Capacity Release Negotiated Rate
Agreement filing to be effective 4/1/
2012.
Filed Date: 3/29/12.
Accession Number: 20120329–5142.
Comments Due: 5 p.m. ET 4/10/12.
Docket Numbers: RP12–544–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: Encana 37663–4
Amendment to Negotiated Rate
Agreement filing to be effective 4/1/
2012.
Filed Date: 3/29/12.
Accession Number: 20120329–5146.
Comments Due: 5 p.m. ET 4/10/12.
Docket Numbers: RP12–545–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: HK 37733 to Texla 39747
Capacity Release Negotiated Rate
Agreement filing to be effective 4/1/
2012.
Filed Date: 3/29/12.
Accession Number: 20120329–5155.
Comments Due: 5 p.m. ET 4/10/12.
Docket Numbers: RP12–546–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: Chesapeake 34683 to
Louis Dreyfus 39749 Negotiated Rate
and Capacity Release Agreement Filing
to be effective 4/1/2012.
Filed Date: 3/29/12.
Accession Number: 20120329–5157.
Comments Due: 5 p.m. ET 4/10/12.
Docket Numbers: RP12–547–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: ONEOK 34951 to BG
Energy 39751 Capacity Release
Negotiated Rate Agreement filing to be
effective 4/1/2012.
Filed Date: 3/29/12.
Accession Number: 20120329–5158.
Comments Due: 5 p.m. ET 4/10/12.
Docket Numbers: RP12–548–000.
Applicants: Gulf Crossing Pipeline
Company LLC.
Description: Antero 2 to Tenaska 452
Capacity Release Negotiated Rate
Agreement Filing to be effective 4/1/
2012.
Filed Date: 3/29/12.
Accession Number: 20120329–5159.
Comments Due: 5 p.m. ET 4/10/12.
Docket Numbers: RP12–549–000.
Applicants: Natural Gas Pipeline
Company of America, LLC.
Description: MidAmerican Negotiated
Rate to be effective 4/1/2012.
E:\FR\FM\06APN1.SGM
06APN1
Agencies
[Federal Register Volume 77, Number 67 (Friday, April 6, 2012)]
[Notices]
[Pages 20808-20809]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-8266]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 2710-057; 2712-074]
Black Bear Hydro Partners, LLC; Notice of Application Accepted
for Filing, Ready for Environmental Analysis, Soliciting Motions to
Intervene, Protests, Comments, Recommendations, Terms and Conditions,
and Fishway Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Amendment of Licenses.
b. Project Nos.: 2710-057 and 2712-074.
c. Date Filed: May 18, 2011, supplemented on October 7, 2011,
January 20, 2012, and March 14, 2012.
d. Applicant: Black Bear Hydro Partners, LLC.
e. Name of Projects: Orono Project 2710-057; Stillwater Project
2712-074.
f. Location: The projects are located on the Stillwater Branch of
the Penobscot River in Penobscot County, Maine.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Scott D. Hall, Black Bear Hydro Partners,
LLC, P.O. Box 276, Davenport Street, Milford, ME 04461, (207) 827-2247.
i. FERC Contact: Ms. Rachel Price at (202) 502-8907 or
Rachel.Price@ferc.gov.
j. Deadline for filing motions to intervene, protests, comments,
recommendations, terms and conditions, and fishway prescriptions is 60
days from the issuance date of this notice; reply comments are due 105
days from the issuance date of this notice.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be
filed electronically, documents may be paper-filed. To paper-file, an
original and seven copies should be mailed to: The Secretary, Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426. Commenters can submit brief comments up to 6,000 characters,
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and
contact information at the end of your comments.
Please include the project numbers (P-2710-057 and/or P-2712-074)
on any motions, protests, comments, recommendations, terms and
conditions, or fishway prescriptions filed.
k. Description of Application: At the Orono Project the applicant
proposes to: construct and operate a second powerhouse containing three
turbine-generator units with an installed capacity of 3.738 megawatts
(MW); increase the normal maximum surface elevation of the reservoir by
0.6 feet; replace the existing downstream fish passage facility and
install a new fish trapping facility (required by ordering paragraphs D
and E of the project license); and extend the license term by three
years so that it would expire in 2048. At the Stillwater Project the
applicant proposes to: construct and operate a second powerhouse
containing three turbine-generator units with an installed capacity of
2.229 MW; new downstream fish passage and upstream eel passage
facilities; and extend the license term by 10 years so that it would
expire in 2048.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online
[[Page 20809]]
at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via
email of new filings and issuances related to this or other pending
projects. For assistance, call (866) 208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Motions to Intervene, Protests, and Comments: Anyone may submit
a motion to intervene, protest, or comments in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any motions to intervene,
protests, or comments must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must: (1)
Bear in all capital letters the title ``MOTION TO INTERVENE,''
``PROTEST,'' ``COMMENTS, '' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``FISHWAY PRESCRIPTIONS'' as applicable; (2) set forth
in the heading the name of the applicant and the project number of the
application to which the filing responds; (3) furnish the name,
address, and telephone number of the person intervening, protesting, or
commenting; and (4) otherwise comply with the requirements of 18 CFR
385.2001 through 385.2005. All motions to intervene, protests, or
comments must set forth their evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b). All motions to intervene,
protests, or comments should relate to project works which are the
subject of the application. Agencies may obtain copies of the
application directly from the applicant. A copy of any motion to
intervene or protest must be served upon each representative of the
applicant specified in the particular application. If an intervener
files comments or documents with the Commission relating to the merits
of an issue that may affect the responsibilities of a particular
resource agency, they must also serve a copy of the document on that
resource agency. A copy of all other filings in reference to this
application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Dated: March 30, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-8266 Filed 4-5-12; 8:45 am]