Department of Energy April 26, 2011 – Federal Register Recent Federal Regulation Documents

Combined Notice of Filings #2
Document Number: 2011-9978
Type: Notice
Date: 2011-04-26
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: 2011-9977
Type: Notice
Date: 2011-04-26
Agency: Department of Energy, Federal Energy Regulatory Commission
Electric Reliability Organization Interpretations of Interconnection Reliability Operations and Coordination and Transmission Operations Reliability Standards
Document Number: 2011-10011
Type: Rule
Date: 2011-04-26
Agency: Department of Energy, Federal Energy Regulatory Commission
Pursuant to section 215 of the Federal Power Act, the Federal Energy Regulatory Commission hereby approves the North American Electric Reliability Corporation's (NERC) interpretation of the Commission-approved Reliability Standards, IRO-005-1, Reliability CoordinationCurrent-Day Operations, Requirement R12, and TOP-005-1, Operational Reliability Information, Requirement R3. Specifically, the interpretation finds that a transmission owner must report a Special Protection System that is operating with only one communication channel in service to the reliability coordinator and neighboring systems upon request, or when the loss of the communication channel will result in the failure of the Special Protection System to operate as designed.
Electric Reliability Organization Interpretation of Transmission Operations Reliability
Document Number: 2011-10010
Type: Proposed Rule
Date: 2011-04-26
Agency: Department of Energy, Federal Energy Regulatory Commission
Under section 215 of the Federal Power Act (FPA), the Federal Energy Regulatory Commission (Commission) proposes to approve the North American Electric Reliability Corporation's (NERC's) proposed interpretation of Reliability Standard, TOP-001-1, Requirement R8.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.