Storage Development Partners, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 23322 [2011-9995]
Download as PDF
23322
Federal Register / Vol. 76, No. 80 / Tuesday, April 26, 2011 / Notices
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14126–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: April 20, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–9996 Filed 4–25–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14144–000]
srobinson on DSKHWCL6B1PROD with NOTICES
Storage Development Partners, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On April 1, 2011, Storage
Development Partners, LLC, filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Vandenberg #5 Project
(project) to be located on Vandenberg
Air Force Base, in Santa Barbara
County, California. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would be a
pumped storage project and consist of
the following: (1) An upper reservoir
having a total storage capacity of 5,737
acre-feet at a normal maximum
operating elevation of 1,600 feet mean
sea level (msl); (2) five 9,700-foot-long,
25-foot-diameter steel lined penstocks
extending between the upper reservoir’s
inlet/outlet and the pump/turbines
below; (3) a breakwater area within the
Pacific Ocean, serving as the lower
reservoir; (4) an underground
powerhouse with approximate
dimensions of 250-feet-long by 75-feetwide by 100-feet-high and containing
five reversible pump/turbine-motor/
generator units with a rated capacity of
239,282 kW each; (5) a 1000-foot-long,
VerDate Mar<15>2010
17:41 Apr 25, 2011
Jkt 223001
800-foot-diameter concrete lined tailrace
connecting the pump/turbine draft tubes
with the lower inlet/outlet; (6) a lower
inlet/outlet structure 100-feet below
msl; (7) a 13-mile-long, 230-kilovolt (kV)
transmission line extending from the
powerhouse to a planned AC–DC
converter; and (8) appurtenant facilities.
The estimated annual generation of the
Vandenberg #5 Project would be 3,496
gigawatt-hours.
Applicant Contact: Mr. James
Petruzzi, Managing Partner, Storage
Development Partners, LLC., 4900
Woodway, Suite 745, Houston, Texas
77056; Telephone: 713–840–9994.
FERC Contact: Kenneth Hogan 202–
502–8434.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14144) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: April 20, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–9995 Filed 4–25–11; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
FEDERAL RESERVE SYSTEM
Change in Bank Control Notices;
Acquisitions of Shares of a Bank or
Bank Holding Company
The notificants listed below have
applied under the Change in Bank
Control Act (12 U.S.C. 1817(j)) and
§ 225.41 of the Board’s Regulation Y (12
CFR 225.41) to acquire shares of a bank
or bank holding company. The factors
that are considered in acting on the
notices are set forth in paragraph 7 of
the Act (12 U.S.C. 1817(j)(7)).
The notices are available for
immediate inspection at the Federal
Reserve Bank indicated. The notices
also will be available for inspection at
the offices of the Board of Governors.
Interested persons may express their
views in writing to the Reserve Bank
indicated for that notice or to the offices
of the Board of Governors. Comments
must be received not later than May 11,
2011.
A. Federal Reserve Bank of Dallas (E.
Ann Worthy, Vice President) 2200
North Pearl Street, Dallas, Texas 75201–
2272:
1. Jonathan Ross Kasling of Hughes
Springs, Texas, Individually; Mayo
Givens Kasling III of Hughes Springs,
Texas, Individually; Jonathan Ross
Kasling of Hughes Springs, Texas; Mayo
Givens Kasling III of Hughes Springs,
Texas; Mayo Givens Kasling, Jr. of
Hughes Springs, Texas and Mayo
Givens Kasling, Jr. as Trustee for the
Mayo G. Kasling III 1996 Trust and as
Trustee for the Jonathan Ross Kasling
1996 Trust; Rebecca Lynn Kasling of
Hughes Springs, Texas; Mayo Givens
Kasling, Sr. of Hughes Springs, Texas;
Catherine Denise Kasling DeWitt of
Hughes Springs, Texas; Misty Morgan
Lake of Hughes Springs, Texas; Randall
Marc Morgan of Hughes Springs, Texas;
Sarah Virginia Kasling Shelton of
Hughes Springs, Texas and Sarah
Virginia Kasling as Trustee for the Ricky
Dub Shelton Jr. 1996 Trust and as
Trustee for the Shelby Shelton 1996
Trust and as Trustee for the Trenton
Shelton 1996 Trust; Roy Kemp Kasling
of Austin, Texas and Roy Kemp Kasling
as Trustee for the Alexandra Kasling
1996 Trust and as Trustee for the
Natalie Kasling 1996 Trust; all as
members of the Kasling Family Group,
to retain control of 25 percent or more
of the shares of Chalybeate Springs
Corporation, Hughes Springs, Texas and
thereby indirectly retain control of The
First National Bank of Hughes Springs,
Hughes Springs, Texas.
E:\FR\FM\26APN1.SGM
26APN1
Agencies
[Federal Register Volume 76, Number 80 (Tuesday, April 26, 2011)]
[Notices]
[Page 23322]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-9995]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14144-000]
Storage Development Partners, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On April 1, 2011, Storage Development Partners, LLC, filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Vandenberg 5 Project (project) to be located on Vandenberg Air
Force Base, in Santa Barbara County, California. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed project would be a pumped storage project and consist
of the following: (1) An upper reservoir having a total storage
capacity of 5,737 acre-feet at a normal maximum operating elevation of
1,600 feet mean sea level (msl); (2) five 9,700-foot-long, 25-foot-
diameter steel lined penstocks extending between the upper reservoir's
inlet/outlet and the pump/turbines below; (3) a breakwater area within
the Pacific Ocean, serving as the lower reservoir; (4) an underground
powerhouse with approximate dimensions of 250-feet-long by 75-feet-wide
by 100-feet-high and containing five reversible pump/turbine-motor/
generator units with a rated capacity of 239,282 kW each; (5) a 1000-
foot-long, 800-foot-diameter concrete lined tailrace connecting the
pump/turbine draft tubes with the lower inlet/outlet; (6) a lower
inlet/outlet structure 100-feet below msl; (7) a 13-mile-long, 230-
kilovolt (kV) transmission line extending from the powerhouse to a
planned AC-DC converter; and (8) appurtenant facilities. The estimated
annual generation of the Vandenberg 5 Project would be 3,496
gigawatt-hours.
Applicant Contact: Mr. James Petruzzi, Managing Partner, Storage
Development Partners, LLC., 4900 Woodway, Suite 745, Houston, Texas
77056; Telephone: 713-840-9994.
FERC Contact: Kenneth Hogan 202-502-8434.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14144) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: April 20, 2011.
Kimberly D. Bose,
Secretary.