Notice of Intent To Prepare an Environmental Impact Statement for the Continued Operation of the Department of Energy/National Nuclear Security Administration Nevada Test Site and Off-Site Locations in the State of Nevada
Document Number: E9-17751
Type: Notice
Date: 2009-07-24
Agency: Department of Energy, National Nuclear Security Administration
Pursuant to the National Environmental Policy Act (NEPA) of 1969, as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) and the U.S. Department of Energy (DOE) regulations implementing NEPA (40 CFR Parts 1500-1508 and 10 CFR Part 1021, respectively), the National Nuclear Security Administration (NNSA), a semi-autonomous agency within DOE, announces its intention to prepare a site-wide environmental impact statement (SWEIS) (DOE/EIS-0426) for the continued operation of DOE/NNSA activities at the Nevada Test Site (NTS) and certain off-site locations (the Remote Sensing Laboratory at Nellis Air Force Base, Las Vegas, Nevada, the DOE/NNSA campus in North Las Vegas, and the Nevada Test and Training Range (NTTR) including activities at the Tonopah Test Range (TTR)) in the State of Nevada. The purpose of this notice is to invite individuals, organizations, and government agencies and entities to participate in developing the scope of the SWEIS.
Interconnection of the Grapevine Canyon Wind Project, Coconino County, AZ
Document Number: E9-17700
Type: Notice
Date: 2009-07-24
Agency: Department of Energy, Western Area Power Administration
The Western Area Power Administration (Western), an agency of the DOE, intends to prepare an environmental impact statement (EIS) on the interconnection of the Grapevine Canyon Wind Project (Project) in Coconino County, near Flagstaff, Arizona. Foresight Flying M, LLC (Foresight) has applied to Western to interconnect the proposed Project to Western's power transmission system on its Glen Canyon-Pinnacle Peak Transmission Line. Western is issuing this notice to inform the public and interested parties about Western's intent to prepare an EIS, conduct a public scoping process, and invite the public to comment on the scope, proposed action, alternatives, and other issues to be
SLC Pipeline LLC; Notice of Filing
Document Number: E9-17698
Type: Notice
Date: 2009-07-24
Agency: Department of Energy, Federal Energy Regulatory Commission
Florida Gas Transmission Company, LLC; Notice of Filing
Document Number: E9-17697
Type: Notice
Date: 2009-07-24
Agency: Department of Energy, Federal Energy Regulatory Commission
Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization
Document Number: E9-17691
Type: Notice
Date: 2009-07-24
Agency: Department of Energy, Federal Energy Regulatory Commission
Colstrip Energy Limited Partnership; Notice of Filing
Document Number: E9-17690
Type: Notice
Date: 2009-07-24
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings No. 1
Document Number: E9-17664
Type: Notice
Date: 2009-07-24
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: E9-17625
Type: Notice
Date: 2009-07-24
Agency: Department of Energy, Federal Energy Regulatory Commission
Notice of an Additional Scoping Meeting for the Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury, Extension of the Public Comment Period, and Correction
Document Number: E9-17566
Type: Notice
Date: 2009-07-24
Agency: Department of Energy
On July 2, 2009, the Department of Energy (DOE or the Department) published its Notice of Intent to prepare an Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury (Mercury Storage EIS) (74 FR 31723). In that Notice of Intent, DOE invited public comments on the proposed scope of the Mercury Storage EIS during a 45-day public scoping period and announced seven public scoping meetings would be held in the vicinity of the sites proposed for evaluation in this EIS as candidate facilities for the long-term management and storage of elemental mercury generated within the United States. DOE is now announcing the addition of a public scoping meeting to be held on August 13, 2009, in Portland, Oregon, and an extension of the public scoping period. DOE also is correcting language contained in the July 2, 2009, Notice of Intent.
Standards for Business Practices for Interstate Natural Gas Pipelines
Document Number: E9-17333
Type: Proposed Rule
Date: 2009-07-24
Agency: Department of Energy, Federal Energy Regulatory Commission
The Federal Energy Regulatory Commission (Commission) is proposing to amend its regulations prescribing standards for interstate natural gas pipeline business practices and electronic communications (found at 18 CFR 284.12) to incorporate by reference standards adopted by the Wholesale Gas Quadrant of the North American Energy Standards Board (NAESB) for Index-Based Capacity Release and Flexible Delivery and Receipt Points. These standards can be obtained from NAESB at 1301 Fannin, Suite 2350, Houston, TX 77002, 713-356-0060, https:// www.naesb.org, and are available for viewing in the Commission's Public Reference Room.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.