Domtar Maine Corporation and Domtar Maine LLC; Notice of Applications for Transfer of Licenses, Substitution of Relicense Applicant, and Soliciting Comments, Motions To Intervene, and Protests, 36687-36688 [E9-17694]
Download as PDF
Federal Register / Vol. 74, No. 141 / Friday, July 24, 2009 / Notices
under the ‘‘e-filing’’ link. For a simpler
method of submitting text only
comments, click on ‘‘Quick Comment.’’
p. Although our current intent is to
prepare an environmental assessment
(EA), there is the possibility that an
Environmental Impact Statement (EIS)
will be required. Nevertheless, this
meeting will satisfy the NEPA scoping
requirements, irrespective of whether an
EA or EIS is issued by the Commission.
participate should meet at the John H.
Overton Lock and Dam Recreation Area
(west) at 9 a.m. For directions, and to
appropriately accommodate persons
interested in attending the site visit,
participants should contact Erik Steimle
by August 6, 2009 [e-mail,
erik.steimle@symbioticsenergy.com or
phone, (503) 235–3424]. All participants
are responsible for their own
transportation.
Scoping Meetings
Meeting Objectives
Commission staff will hold two
scoping meetings in the vicinity of the
project at the time and place noted
below. The daytime meeting will focus
on resource agency, Indian tribes, and
non-governmental organization
concerns, while the evening meeting is
primarily for receiving input from the
public. We invite all interested
individuals, organizations, and agencies
to attend one or both of the meetings,
and to assist staff in identifying
particular study needs, as well as the
scope of environmental issues to be
addressed in the environmental
document. The times and locations of
these meetings are as follows:
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in item
n. of this document.
Daytime Scoping Meeting
Date: Wednesday August 12, 2009.
Time: 7 p.m.
Location: Sai Convention Center, 2301
N. MacArthur Drive, Alexandria, LA,
71301.
Phone: (318) 619–3300.
srobinson on DSKHWCL6B1PROD with NOTICES
Evening Scoping Meeting
Date: Thursday August 13, 2009.
Time: 10 a.m.
Location: Sai Convention Center, 2301
N. MacArthur Drive, Alexandria, LA,
71301.
Phone: (318) 619–3300.
Scoping Document 1 (SD1), which
outlines the subject areas to be
addressed in the environmental
document, was mailed to the
individuals and entities on the
Commission’s mailing list. Copies of
SD1 will be available at the scoping
meetings, or may be viewed on the Web
at https://www.ferc.gov, using the
‘‘eLibrary’’ link. Follow the directions
for accessing information in paragraph
n. Based on all oral and written
comments, a Scoping Document 2 (SD2)
may be issued. SD2 may include a
revised process plan and schedule, as
well as a list of issues, identified
through the scoping process.
Site Visit
The potential applicant and
Commission staff will conduct a site
visit of the project on Wednesday,
August 12, 2009. Those wishing to
VerDate Nov<24>2008
18:55 Jul 23, 2009
Jkt 217001
Meeting Procedures
The meetings will be recorded by a
stenographer and will become part of
the formal record of the Commission
proceeding on the project.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–17693 Filed 7–23–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 2492–010, 2618–020 and –021,
and 2660–024 and –025]
Domtar Maine Corporation and Domtar
Maine LLC; Notice of Applications for
Transfer of Licenses, Substitution of
Relicense Applicant, and Soliciting
Comments, Motions To Intervene, and
Protests
July 17, 2009.
On June 9, 2009, Domtar Maine
Corporation (Transferor) and Domtar
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
36687
Maine LLC (Transferee) filed a joint
application for: (1) The transfer of
licenses of the Vanceboro Project No.
2492, located on the East Branch of the
St. Croix River in Washington County,
Maine and New Brunswick, Canada, the
West Branch Project No. 2618, located
on the West Branch of the St. Croix
River in Hancock, Penobscot, and
Washington Counties, Maine, and the
Forest City Project No. 2660, located on
the East Branch of the St. Croix River in
Washington and Aroostock Counties,
Maine, and New Brunswick, Canada,
and (2) the substitution of the
Transferee for the Transferor as the
applicant in the pending applications
for new licenses filed by the Transferor
in Project Nos. 2618–020 and 2660–024.
The transfer application was filed
within five years of the expiration of the
license for Project Nos. 2618 and 2660,
which are the subject of pending
relicensing applications. In
Hydroelectric Relicensing Regulations
Under the Federal Power Act (54 FR
23756 FERC Stats. and Regs., Regs.
Preambles 1986–1990 30,854 at
p. 31,437), the Commission declined to
forbid all license transfers during the
last five years of an existing license, and
instead indicated that it would
scrutinize all such transfer requests to
determine if the transfer’s primary
purpose was to give the transferee an
advantage in relicensing.
Applicant Contact: C. Scott Beal,
Domtar Maine LLC, 144 Maine Street,
Baileyville, ME 04694, phone (207) 427–
4004.
FERC Contact: Robert Bell, (202) 502–
6062.
Deadline for filing comments,
protests, and motions to intervene: 30
days from the issuance of this notice.
Comments and motions to intervene
may be filed electronically via the
Internet. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings, please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–2492–010, 2618–021, and
2660–025) in the docket number field to
E:\FR\FM\24JYN1.SGM
24JYN1
36688
Federal Register / Vol. 74, No. 141 / Friday, July 24, 2009 / Notices
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–17694 Filed 7–23–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
srobinson on DSKHWCL6B1PROD with NOTICES
July 16, 2009.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER99–2369–006.
Applicants: Alliance for Cooperative
Energy Services.
Description: Amendment to May 4,
2009 Notice of Non-Material Change in
Status of Alliance for Cooperative
Energy Services Power Marketing LLC.
Filed Date: 07/15/2009.
Accession Number: 20090715–5149.
Comment Date: 5 p.m. Eastern Time
on Wednesday, August 05, 2009.
Docket Numbers: ER99–2948–017;
ER00–2918–016; ER00–2917–016;
ER05–261–009; ER01–556–015; ER01–
1654–018; ER02–2567–016; ER05–728–
009; ER04–485–013; ER07–247–008;
ER07–245–008; ER07–244–008.
Applicants: Baltimore Gas and
Electric Company, Constellation Power
Source Generation LLC, Calvert Cliffs
Nuclear Power Plant, Inc., Constellation
Energy Commodities Group, Inc.,
Handsome Lake Energy, LLC, Nine Mile
Point Nuclear Station, LLC, Nine Mile
Point Nuclear Station LLC,
Constellation NewEnergy, Inc.,
Constellation Energy Commodities
Group Maine, R.E. Ginna Nuclear Power
Plant, LLC, Raven One, LLC, Raven
Two, LLC, Raven Three, LLC.
Description: Baltimore Gas and
Electric Company et al. submit
Substitute Third Revised Sheet 2 et al.
to FERC Electric Tariff, Original Volume
1 under ER99–2948 et al.
Filed Date: 07/13/2009.
Accession Number: 20090715–0093.
Comment Date: 5 p.m. Eastern Time
on Monday, August 03, 2009.
Docket Numbers: ER04–925–021.
Applicants: Merrill Lynch
Commodities, Inc.
Description: Notification of NonMaterial Change in Status.
Filed Date: 07/15/2009.
Accession Number: 20090715–5105.
Comment Date: 5 p.m. Eastern Time
on Wednesday, August 05, 2009.
Docket Numbers: ER09–553–001.
VerDate Nov<24>2008
18:55 Jul 23, 2009
Jkt 217001
Applicants: Vista Energy Marketing,
LP.
Description: Vista Energy Marketing,
LP supplements its 1/26/09 application
for market based rate authority and its
4/10/09 amendment filing pursuant to
FERC’s 6/9/09 Order.
Filed Date: 07/09/2009.
Accession Number: 20090714–0071.
Comment Date: 5 p.m. Eastern Time
on Thursday, July 30, 2009.
Docket Numbers: ER09–873–001.
Applicants: ISO New England, Inc.
Description: ISO New England, Inc.
submits Compliance filing providing
information required by FERC’s June 11,
2009 Order, for acceptance.
Filed Date: 07/13/2009.
Accession Number: 20090714–0088.
Comment Date: 5 p.m. Eastern Time
on Monday, August 03, 2009.
Docket Numbers: ER09–991–001.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
submits its proposal for a transition
program for Emergency Demand
Response Day-Ahead Offers to comply
with FERC’s June 12, 2009 Order.
Filed Date: 07/13/2009.
Accession Number: 20090714–0089.
Comment Date: 5 p.m. Eastern Time
on Monday, August 03, 2009.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES09–32–001.
Applicants: System Energy Resources,
Inc.
Description: Supplemental
Information of System Energy
Resources, Inc.
Filed Date: 07/15/2009.
Accession Number: 20090715–5144.
Comment Date: 5 p.m. Eastern Time
on Monday, July 27, 2009.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–17625 Filed 7–23–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings No. 1
July 15, 2009.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP09–826–000.
Applicants: Central New York Oil and
Gas Co., LLC.
Description: Central New York Oil
and Gas Company, LLC submits First
Revised Sheet 103A et al. to FERC Gas
Tariff, First Revised Volume 1.
Filed Date: 07/13/2009.
Accession Number: 20090714–0067.
Comment Date: 5 p.m. Eastern Time
on Monday, July 27, 2009.
Docket Numbers: RP09–827–000.
Applicants: Cimarron River Pipeline,
LLC.
E:\FR\FM\24JYN1.SGM
24JYN1
Agencies
[Federal Register Volume 74, Number 141 (Friday, July 24, 2009)]
[Notices]
[Pages 36687-36688]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-17694]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 2492-010, 2618-020 and -021, and 2660-024 and -025]
Domtar Maine Corporation and Domtar Maine LLC; Notice of
Applications for Transfer of Licenses, Substitution of Relicense
Applicant, and Soliciting Comments, Motions To Intervene, and Protests
July 17, 2009.
On June 9, 2009, Domtar Maine Corporation (Transferor) and Domtar
Maine LLC (Transferee) filed a joint application for: (1) The transfer
of licenses of the Vanceboro Project No. 2492, located on the East
Branch of the St. Croix River in Washington County, Maine and New
Brunswick, Canada, the West Branch Project No. 2618, located on the
West Branch of the St. Croix River in Hancock, Penobscot, and
Washington Counties, Maine, and the Forest City Project No. 2660,
located on the East Branch of the St. Croix River in Washington and
Aroostock Counties, Maine, and New Brunswick, Canada, and (2) the
substitution of the Transferee for the Transferor as the applicant in
the pending applications for new licenses filed by the Transferor in
Project Nos. 2618-020 and 2660-024.
The transfer application was filed within five years of the
expiration of the license for Project Nos. 2618 and 2660, which are the
subject of pending relicensing applications. In Hydroelectric
Relicensing Regulations Under the Federal Power Act (54 FR 23756 FERC
Stats. and Regs., Regs. Preambles 1986-1990 30,854 at p. 31,437), the
Commission declined to forbid all license transfers during the last
five years of an existing license, and instead indicated that it would
scrutinize all such transfer requests to determine if the transfer's
primary purpose was to give the transferee an advantage in relicensing.
Applicant Contact: C. Scott Beal, Domtar Maine LLC, 144 Maine
Street, Baileyville, ME 04694, phone (207) 427-4004.
FERC Contact: Robert Bell, (202) 502-6062.
Deadline for filing comments, protests, and motions to intervene:
30 days from the issuance of this notice. Comments and motions to
intervene may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings, please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
2492-010, 2618-021, and 2660-025) in the docket number field to
[[Page 36688]]
access the document. For assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-17694 Filed 7-23-09; 8:45 am]