Department of Energy May 2008 – Federal Register Recent Federal Regulation Documents

Results 151 - 185 of 185
Combined Notice of Filings #1
Document Number: E8-9965
Type: Notice
Date: 2008-05-06
Agency: Department of Energy, Federal Energy Regulatory Commission
Findings for the Sacramento Area Voltage Support Project (DOE/EIS-0323S1)
Document Number: E8-9956
Type: Notice
Date: 2008-05-06
Agency: Department of Energy, Western Area Power Administration
Western Area Power Administration (Western) plans to construct a new double-circuit, 230-kilovolt (kV) transmission line, approximately 31 miles long, between Western's O'Banion Substation and the area just south of the Sacramento Municipal Utility District's (SMUD) Elverta Substation and reconstruct SMUD's existing 230 kV/115 kV transmission line between SMUD's Elverta and Natomas substations. The Sacramento Area Voltage Support (SVS) Project (Project) would be located in Sutter, Placer, and Sacramento counties in California. Western proposes to build the Project to provide needed transmission system additions and upgrades to maintain system voltage stability, reliability, and security. Western evaluated seven action alternatives and the No Action Alternative in its supplemental environmental impact statement (SEIS). Of these, Alternative B was selected as both the Preferred Alternative and the Environmentally Preferred Action Alternative.
2012 Tiered Rate Methodology Proceeding; Public Hearings and Opportunities for Public Review and Comment
Document Number: E8-9953
Type: Notice
Date: 2008-05-06
Agency: Bonneville Power Administration, Department of Energy
BPA is proposing to adopt a new tiered rate design for setting its Priority Firm Power (PF) rates beginning with the FY 2012-2013 rate period. The primary feature of this Tiered Rate Methodology (TRM) proposal is one rate tier (Tier 1) based on generation output and costs attributed to BPA's current Federal base system resources and a second rate tier (Tier 2) based on the generation and costs associated with newly acquired resources. The TRM is part of BPA's effort to achieve the overall policy objectives of the Long-Term Regional Dialogue Policy (Policy). Under this Policy, BPA will offer 20-year Regional Dialogue Contracts to its Federal agency and public utility customers for power priced at a tiered PF rate. The TRM is intended to provide customers with a predictable and durable means by which to calculate BPA's PF tiered rate for the term of these contracts. Determinations of specific rate levels applicable to these contracts will not be established in this proceeding. Rather the specific rate levels will be developed consistent with the TRM in the respective Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act) section 7(i) rate proceedings during the term of this TRM. BPA intends to set the actual power rates on a two-year cycle throughout the term of the Regional Dialogue contracts beginning with the FY 2012-2013 rate period. BPA is commencing this proceeding under section 7 of the Northwest Power Act to establish the TRM. Entities wishing to become a formal party to the proceeding must file a petition to intervene, notifying BPA in writing of their intention to do so in conformance with the requirements stated in this Notice.
Preventing Undue Discrimination and Preference in Transmission Service; Notice of Extension of Time
Document Number: E8-9905
Type: Notice
Date: 2008-05-06
Agency: Department of Energy, Federal Energy Regulatory Commission
ConocoPhillips Company, Complainant v. Entergy Services, Inc., Respondent; Notice of Complaint
Document Number: E8-9902
Type: Notice
Date: 2008-05-06
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: E8-9901
Type: Notice
Date: 2008-05-06
Agency: Department of Energy, Federal Energy Regulatory Commission
2015 Resource Pool
Document Number: E8-9816
Type: Notice
Date: 2008-05-05
Agency: Department of Energy, Western Area Power Administration
The Western Area Power Administration (Western), a Federal power marketing administration of the U.S. Department of Energy (DOE), published its 2004 Power Marketing Plan (Marketing Plan) for Western's Sierra Nevada Customer Service Region (SNR) in the Federal Register on June 25, 1999 (64 FR 34417). The Marketing Plan specifies the terms and conditions under which Western will market power from the Central Valley Project (CVP) and the Washoe Project beginning January 1, 2005, and continuing through December 31, 2024. The Marketing Plan provides for a 2015 Resource Pool of up to 2 percent of SNR's marketable power resources. The 2015 Resource Pool will be available for power allocations to preference entities that meet the Eligibility Criteria. This notice begins the public process to establish the resources available and to revise the Eligibility Criteria provided in the Marketing Plan for the 2015 Resource Pool. Once Western establishes the final amount of power to be made available under the 2015 Resource Pool and the associated Eligibility Criteria, preference entities who wish to apply for an allocation of power from SNR must submit formal applications in response to Western's Call for 2015 Resource Pool Applications to be published under a separate notice.
Dominion Transmission, Inc.; Notice of Availability of the Environmental Assessment for the Proposed Hub I Project
Document Number: E8-9809
Type: Notice
Date: 2008-05-05
Agency: Department of Energy, Federal Energy Regulatory Commission
North Baja Pipeline, LLC; Notice of Application
Document Number: E8-9797
Type: Notice
Date: 2008-05-05
Agency: Department of Energy, Federal Energy Regulatory Commission
ISO New England Inc.; Notice Shortening Response Time
Document Number: E8-9795
Type: Notice
Date: 2008-05-05
Agency: Department of Energy, Federal Energy Regulatory Commission
Williston Basin Interstate Pipeline Company; Notice of Request Under Blanket Authorization
Document Number: E8-9794
Type: Notice
Date: 2008-05-05
Agency: Department of Energy, Federal Energy Regulatory Commission
Farm Fresh; Notice of Filing of Notice of Self-Certification of Qualifying Status of a Cogeneration Facility
Document Number: E8-9793
Type: Notice
Date: 2008-05-05
Agency: Department of Energy, Federal Energy Regulatory Commission
City of Hamilton, Ohio; Notice of Availability of Environmental Assessment
Document Number: E8-9780
Type: Notice
Date: 2008-05-05
Agency: Department of Energy, Federal Energy Regulatory Commission
Mountain Wind Power II, LLC; Notice of Issuance of Order
Document Number: E8-9778
Type: Notice
Date: 2008-05-05
Agency: Department of Energy, Federal Energy Regulatory Commission
TransCanada Maine Wind Development Inc.; Notice of Issuance of Order
Document Number: E8-9777
Type: Notice
Date: 2008-05-05
Agency: Department of Energy, Federal Energy Regulatory Commission
Eastland Power LLC; Notice of Issuance of Order
Document Number: E8-9776
Type: Notice
Date: 2008-05-05
Agency: Department of Energy, Federal Energy Regulatory Commission
EFS Parlin Holdings LLC; Notice of Issuance of Order
Document Number: E8-9775
Type: Notice
Date: 2008-05-05
Agency: Department of Energy, Federal Energy Regulatory Commission
Worsham-Steed Gas Storage, L.P.; Notice of Compliance Filing
Document Number: E8-9773
Type: Notice
Date: 2008-05-02
Agency: Department of Energy, Federal Energy Regulatory Commission
Biomass Research and Development Technical Advisory Committee
Document Number: E8-9676
Type: Notice
Date: 2008-05-02
Agency: Department of Energy
This notice announces an open meeting of the Biomass Research and Development Technical Advisory Committee under the Biomass Research and Development Act of 2000. The Federal Advisory Committee Act (Pub. L. No. 92-463, as amended) requires that agencies publish these notices in the Federal Register to allow for public participation. This notice announces the meeting of the Biomass Research and Development Technical Advisory Committee. Dates and Times: May 20, 2008 at 12:30 p.m. to 5 p.m., May 21, 2008 at 8 a.m. to 12:30 p.m.
Combined Notice of Filings # 1
Document Number: E8-9663
Type: Notice
Date: 2008-05-02
Agency: Department of Energy, Federal Energy Regulatory Commission
2012 Tiered Rate Methodology Proceeding; Public Hearings and Opportunities for Public Review and Comment
Document Number: E8-9572
Type: Notice
Date: 2008-05-01
Agency: Bonneville Power Administration, Department of Energy
BPA is proposing to adopt a new tiered rate design for setting its Priority Firm Power (PF) rates beginning with the FY 2012-2013 rate period. The primary feature of this Tiered Rate Methodology (TRM) proposal is one rate tier (Tier 1) based on generation output and costs attributed to BPA's current Federal base system resources and a second rate tier (Tier 2) based on the generation and costs associated with newly acquired resources. The TRM is part of BPA's effort to achieve the overall policy objectives of the Long-Term Regional Dialogue Policy (Policy). Under this Policy, BPA will offer 20-year Regional Dialogue Contracts to its Federal agency and public utility customers for power priced at a tiered PF rate. The TRM is intended to provide customers with a predictable and durable means by which to calculate BPA's PF tiered rate for the term of these contracts. Determinations of specific rate levels applicable to these contracts will not be established in this proceeding. Rather the specific rate levels will be developed consistent with the TRM in the respective Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act) section 7(i) rate proceedings during the term of this TRM. BPA intends to set the actual power rates on a two-year cycle throughout the term of the Regional Dialogue contracts beginning with the FY 2012-2013 rate period. BPA is commencing this proceeding under section 7 of the Northwest Power Act to establish the TRM. Entities wishing to become a formal party to the proceeding must file a petition to intervene, notifying BPA in writing of their intention to do so in conformance with the requirements stated in this Notice.
Annual Update of Filing Fees
Document Number: E8-9548
Type: Rule
Date: 2008-05-01
Agency: Department of Energy, Federal Energy Regulatory Commission
In accordance with 18 CFR 381.104, the Commission issues this update of its filing fees. This notice provides the yearly update using data in the Commission's Management, Administrative, and Payroll System to calculate the new fees. The purpose of updating is to adjust the fees on the basis of the Commission's costs for Fiscal Year 2007.
Combined Notice of Filings #1
Document Number: E8-9543
Type: Notice
Date: 2008-05-01
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: E8-9542
Type: Notice
Date: 2008-05-01
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: E8-9475
Type: Notice
Date: 2008-05-01
Agency: Department of Energy, Federal Energy Regulatory Commission
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.