Annual Update of Filing Fees, 23946-23947 [E8-9548]

Download as PDF 23946 Federal Register / Vol. 73, No. 85 / Thursday, May 1, 2008 / Rules and Regulations From To § 95.6203 VOR Federal Airway V203 Is Amended To Read in Part Albany, NY VORTAC .................................................................... * 2000—MOCA * 3000—GNSS MEA § 95.6203 * Weets, NY FIX ........................................................................... 6000 Stuby, CT FIX .............................................................................. ** 8500 * Cedar City, UT VOR/DME ......................................................... ** Meshl, ME FIX .......................................................................... Modena, PA VORTAC ................................................................. Cambridge, NY VOR/DME .......................................................... Airway Segment To [FR Doc. E8–9602 Filed 4–30–08; 8:45 am] BILLING CODE 4910–13–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission 18 CFR Part 381 [Docket No. RM08–9–000] Annual Update of Filing Fees rfrederick on PROD1PC67 with RULES * 4000 Distance From VOR Federal Airway Changeover Points V146 Is Amended To Add Changeover Point Albany, NY VORTAC ........................................................ April 24, 2008. Federal Energy Regulatory Commission, Department of Energy. ACTION: Final rule; annual update of Commission filing fees. AGENCY: 15:05 Apr 30, 2008 * 10000 Changeover points From VerDate Aug<31>2005 *** 5000 VOR Federal Airway V542 Is Amended To Read in Part # Albany, NY VORTAC ................................................................. * 3000—MOCA # ALBANY R–067 UNUSABLE § 95.8003 12400 VOR Federal Airway V474 Is Amended To Read in Part Delro, PA FIX ................................................................................ * 3900—MOCA * 4000—GNSS MEA § 95.6542 6700 VOR Federal Airway V268 Is Amended To Read in Part * Tonni, MA FIX ............................................................................. * 6000—MRA ** 5000—MRA *** 4000—GNSS MEA § 95.6474 Saranac Lake, NY VOR/DME ..................................................... VOR Federal Airway V235 Is Amended To Read in Part Matzo, UT FIX ............................................................................... * 11400—MCA CEDAR CITY, UT VOR/DME , S BND § 95.6268 * 6000 VOR Federal Airway V205 Is Amended To Read in Part Weard, NY FIX .............................................................................. * 6000—MRA * Weets, NY FIX * 6000—MRA ** 5000—GNSS MEA § 95.6235 Otole, NY FIX .............................................................................. VOR Federal Airway V203 Is Amended To Read in Part Dinny, NY FIX ............................................................................... § 95.6205 MEA Jkt 214001 Chester, MA VOR/DME ................................................... SUMMARY: In accordance with 18 CFR 381.104, the Commission issues this update of its filing fees. This notice provides the yearly update using data in the Commission’s Management, Administrative, and Payroll System to calculate the new fees. The purpose of updating is to adjust the fees on the basis of the Commission’s costs for Fiscal Year 2007. DATES: Effective Date: June 2, 2008. FOR FURTHER INFORMATION CONTACT: Elizabeth Hensley, Office of the Executive Director, Federal Energy Regulatory Commission, 888 First Street, NE., Room 4R–03, Washington, DC 20426, 202–502–6240. SUPPLEMENTARY INFORMATION: Document Availability: In addition to publishing the full text of this document PO 00000 Frm 00008 Fmt 4700 Sfmt 4700 8 Albany in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the Internet through FERC’s Home Page (https://www.ferc.gov) and in FERC’s Public Reference Room during normal business hours (8:30 a.m. to 5 p.m. Eastern time) at 888 First Street, NE., Room 2A, Washington DC 20426. From FERC’s Web site on the Internet, this information is available in the eLibrary (formerly FERRIS). The full text of this document is available on eLibrary in PDF and Microsoft Word format for viewing, printing, and/or downloading. To access this document in eLibrary, type the docket number excluding the last three digits of this document in the docket number field E:\FR\FM\01MYR1.SGM 01MYR1 Federal Register / Vol. 73, No. 85 / Thursday, May 1, 2008 / Rules and Regulations and follow other directions on the search page. User assistance is available for eLibrary and other aspects of FERC’s Web site during normal business hours. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The Federal Energy Regulatory Commission (Commission) is issuing this notice to update filing fees that the Commission assesses for specific services and benefits provided to identifiable beneficiaries. Pursuant to 18 CFR 381.104, the Commission is establishing updated fees on the basis of the Commission’s Fiscal Year 2007 costs. The adjusted fees announced in this notice are effective June 2, 2008. The Commission has determined, with the concurrence of the Administrator of the Office of Information and Regulatory 23947 Affairs of the Office of Management and Budget, that this final rule is not a major rule within the meaning of section 251 of Subtitle E of Small Business Regulatory Enforcement Fairness Act, 5 U.S.C. 804(2). The Commission is submitting this final rule to both houses of the United States Congress and to the Comptroller General of the United States. The new fee schedule is as follows: Fees Applicable to the Natural Gas Policy Act 1. Petitions for rate approval pursuant to 18 CFR 284.123(b)(2). (18 CFR 381.403) ............................................................................ $10,440 Fees Applicable to General Activities 1. Petition for issuance of a declaratory order (except under Part I of the Federal Power Act). (18 CFR 381.302(a)) ...................... 2. Review of a Department of Energy remedial order: 20,970 Amount in controversy $0–9,999. (18 CFR 381.303(b)) ......................................................................................................................................................... $10,000–29,999. (18 CFR 381.303(b)) .............................................................................................................................................. $30,000 or more. (18 CFR 381.303(a)) ............................................................................................................................................. 3. Review of a Department of Energy denial of adjustment: 100 600 30,620 Amount in controversy $0–9,999. (18 CFR 381.304(b)) ......................................................................................................................................................... $10,000–29,999. (18 CFR 381.304(b)) .............................................................................................................................................. $30,000 or more. (18 CFR 381.304(a)) ............................................................................................................................................. 4. Written legal interpretations by the Office of General Counsel. (18 CFR 381.305(a)) ..................................................................... 100 600 16,050 6,010 Fees Applicable to Natural Gas Pipelines 1. Pipeline certificate applications pursuant to 18 CFR 284.224. (18 CFR 381.207(b)) ....................................................................... * 1,000 Fees Applicable to Cogenerators and Small Power Producers 1. Certification of qualifying status as a small power production facility. (18 CFR 381.505(a)) ........................................................ 2. Certification of qualifying status as a cogeneration facility. (18 CFR 381.505(a)) ........................................................................... * This fee has not been changed. List of Subjects in 18 CFR Part 381 § 381.304 Electric power plants, Electric utilities, Natural gas, Reporting and recordkeeping requirements. I Thomas R. Herlihy, Executive Director. § 381.305 [Amended] 4. In 381.304, paragraph (a) is amended by removing ‘‘$16,020’’ and adding ‘‘$16,050’’ in its place. In consideration of the foregoing, the Commission amends Part 381, Chapter I, Title 18, Code of Federal Regulations, as set forth below. 5. In 381.305, paragraph (a) is amended by removing ‘‘$6,000’’ and adding ‘‘$6,010’’ in its place. § 381.403 [Amended] PART 381—FEES 1. The authority citation for part 381 continues to read as follows: 6. Section 381.403 is amended by removing ‘‘$10,420’’ and adding ‘‘$10,440’’ in its place. § 381.505 I I Authority: 15 U.S.C. 717–717w; 16 U.S.C. 791–828c, 2601–2645; 31 U.S.C. 9701; 42 U.S.C. 7101–7352; 49 U.S.C. 60502; 49 App. U.S.C. 1–85. § 381.302 [Amended] 2. In 381.302, paragraph (a) is amended by removing ‘‘$20,940’’ and adding ‘‘$20,970’’ in its place. rfrederick on PROD1PC67 with RULES I § 381.303 [Amended] 7. In 381.505, paragraph (a) is amended by removing ‘‘$18,000’’ and adding ‘‘$18,030’’ in its place and by removing ‘‘$20,380’’ and adding ‘‘$20,410’’ in its place. I [FR Doc. E8–9548 Filed 4–30–08; 8:45 am] BILLING CODE 6717–01–P [Amended] 3. In 381.303, paragraph (a) is amended by removing ‘‘$30,560’’ and adding ‘‘$30,620’’ in its place. I VerDate Aug<31>2005 15:05 Apr 30, 2008 Jkt 214001 PO 00000 Frm 00009 Fmt 4700 DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration 21 CFR Part 101 [Amended] I I 18,030 20,410 Sfmt 4700 [Docket No. FDA–2006–P–0405] (formerly Docket No. 2006P–0069) Food Labeling: Health Claims; Soluble Fiber from Certain Foods and Risk of Coronary Heart Disease AGENCY: Food and Drug Administration, HHS. ACTION: Final rule. SUMMARY: The Food and Drug Administration (FDA) is amending its regulation authorizing a health claim on the relationship between soluble fiber from certain foods and risk of coronary heart disease (CHD). The amendment exempts certain foods from the nutrient content requirement of ‘‘low fat.’’ The exemption will apply if the food exceeds the ‘‘low fat’’ requirement due to fat content derived from whole oat sources. The amendment expands the use of this health claim to some whole oat products that are currently ineligible for the health claim. FDA is taking this E:\FR\FM\01MYR1.SGM 01MYR1

Agencies

[Federal Register Volume 73, Number 85 (Thursday, May 1, 2008)]
[Rules and Regulations]
[Pages 23946-23947]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-9548]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

18 CFR Part 381

[Docket No. RM08-9-000]


Annual Update of Filing Fees

April 24, 2008.
AGENCY: Federal Energy Regulatory Commission, Department of Energy.

ACTION: Final rule; annual update of Commission filing fees.

-----------------------------------------------------------------------

SUMMARY: In accordance with 18 CFR 381.104, the Commission issues this 
update of its filing fees. This notice provides the yearly update using 
data in the Commission's Management, Administrative, and Payroll System 
to calculate the new fees. The purpose of updating is to adjust the 
fees on the basis of the Commission's costs for Fiscal Year 2007.

DATES: Effective Date: June 2, 2008.

FOR FURTHER INFORMATION CONTACT: Elizabeth Hensley, Office of the 
Executive Director, Federal Energy Regulatory Commission, 888 First 
Street, NE., Room 4R-03, Washington, DC 20426, 202-502-6240.

SUPPLEMENTARY INFORMATION:
    Document Availability: In addition to publishing the full text of 
this document in the Federal Register, the Commission provides all 
interested persons an opportunity to view and/or print the contents of 
this document via the Internet through FERC's Home Page (https://
www.ferc.gov) and in FERC's Public Reference Room during normal 
business hours (8:30 a.m. to 5 p.m. Eastern time) at 888 First Street, 
NE., Room 2A, Washington DC 20426.
    From FERC's Web site on the Internet, this information is available 
in the eLibrary (formerly FERRIS). The full text of this document is 
available on eLibrary in PDF and Microsoft Word format for viewing, 
printing, and/or downloading. To access this document in eLibrary, type 
the docket number excluding the last three digits of this document in 
the docket number field

[[Page 23947]]

and follow other directions on the search page.
    User assistance is available for eLibrary and other aspects of 
FERC's Web site during normal business hours. For assistance, contact 
FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 
208-3676, or for TTY, contact (202) 502-8659.
    The Federal Energy Regulatory Commission (Commission) is issuing 
this notice to update filing fees that the Commission assesses for 
specific services and benefits provided to identifiable beneficiaries. 
Pursuant to 18 CFR 381.104, the Commission is establishing updated fees 
on the basis of the Commission's Fiscal Year 2007 costs. The adjusted 
fees announced in this notice are effective June 2, 2008. The 
Commission has determined, with the concurrence of the Administrator of 
the Office of Information and Regulatory Affairs of the Office of 
Management and Budget, that this final rule is not a major rule within 
the meaning of section 251 of Subtitle E of Small Business Regulatory 
Enforcement Fairness Act, 5 U.S.C. 804(2). The Commission is submitting 
this final rule to both houses of the United States Congress and to the 
Comptroller General of the United States.
    The new fee schedule is as follows:

              Fees Applicable to the Natural Gas Policy Act
 
1. Petitions for rate approval pursuant to 18 CFR                $10,440
 284.123(b)(2). (18 CFR 381.403)............................
 
                  Fees Applicable to General Activities
 
1. Petition for issuance of a declaratory order (except           20,970
 under Part I of the Federal Power Act). (18 CFR 381.302(a))
2. Review of a Department of Energy remedial order:
 
                    Amount in controversy
 
    $0-9,999. (18 CFR 381.303(b))...........................         100
    $10,000-29,999. (18 CFR 381.303(b)).....................         600
    $30,000 or more. (18 CFR 381.303(a))....................      30,620
3. Review of a Department of Energy denial of adjustment:
 
                    Amount in controversy
 
    $0-9,999. (18 CFR 381.304(b))...........................         100
    $10,000-29,999. (18 CFR 381.304(b)).....................         600
    $30,000 or more. (18 CFR 381.304(a))....................      16,050
4. Written legal interpretations by the Office of General          6,010
 Counsel. (18 CFR 381.305(a))...............................
 
                Fees Applicable to Natural Gas Pipelines
 
1. Pipeline certificate applications pursuant to 18 CFR          * 1,000
 284.224. (18 CFR 381.207(b))...............................
 
        Fees Applicable to Cogenerators and Small Power Producers
 
1. Certification of qualifying status as a small power            18,030
 production facility. (18 CFR 381.505(a))...................
2. Certification of qualifying status as a cogeneration           20,410
 facility. (18 CFR 381.505(a))..............................
 
* This fee has not been changed.

List of Subjects in 18 CFR Part 381

    Electric power plants, Electric utilities, Natural gas, Reporting 
and recordkeeping requirements.

Thomas R. Herlihy,
Executive Director.

0
In consideration of the foregoing, the Commission amends Part 381, 
Chapter I, Title 18, Code of Federal Regulations, as set forth below.

PART 381--FEES

0
1. The authority citation for part 381 continues to read as follows:

    Authority: 15 U.S.C. 717-717w; 16 U.S.C. 791-828c, 2601-2645; 31 
U.S.C. 9701; 42 U.S.C. 7101-7352; 49 U.S.C. 60502; 49 App. U.S.C. 1-
85.


Sec.  381.302  [Amended]

0
2. In 381.302, paragraph (a) is amended by removing ``$20,940'' and 
adding ``$20,970'' in its place.


Sec.  381.303  [Amended]

0
3. In 381.303, paragraph (a) is amended by removing ``$30,560'' and 
adding ``$30,620'' in its place.


Sec.  381.304  [Amended]

0
4. In 381.304, paragraph (a) is amended by removing ``$16,020'' and 
adding ``$16,050'' in its place.


Sec.  381.305  [Amended]

0
5. In 381.305, paragraph (a) is amended by removing ``$6,000'' and 
adding ``$6,010'' in its place.


Sec.  381.403  [Amended]

0
6. Section 381.403 is amended by removing ``$10,420'' and adding 
``$10,440'' in its place.


Sec.  381.505  [Amended]

0
7. In 381.505, paragraph (a) is amended by removing ``$18,000'' and 
adding ``$18,030'' in its place and by removing ``$20,380'' and adding 
``$20,410'' in its place.

[FR Doc. E8-9548 Filed 4-30-08; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.