SBER Royal Mills, LLC; Notice of Application Accepted for Filing; Soliciting Motions To Intervene and Protests; Ready for Environmental Analysis; Soliciting Comments, Terms and Conditions, Recommendations, and Prescriptions; Establishing an Expedited Schedule; and Waiving Scoping, 24580-24581 [E8-9779]

Download as PDF 24580 Federal Register / Vol. 73, No. 87 / Monday, May 5, 2008 / Notices SYSTEM LOCATION: Navy Exchange Service Command, 3280 Virginia Beach Boulevard, Virginia Beach, VA 23452–5724 (for all Navy Exchanges). Civilian employees and former civilian employees with the Navy Exchange Service Command and Navy Exchanges located worldwide. Payroll and benefits information for current and former civilian employees of Coast Guard exchanges, clubs and messes. CATEGORIES OF RECORDS IN THE SYSTEM: Leave accrual reports; earnings records; insurance records and reports regarding property damage, personal injury or death, group life, disability, medical and retirement plan records. AUTHORITY FOR MAINTENANCE OF THE SYSTEM: 10 U.S.C. 5013, Secretary of the Navy and E.O. 9397 (SSN). PURPOSE(S): To record contributions to benefit plans; to process all insurance claims; to calculate retirement benefits upon request of employees. ROUTINE USES OF RECORDS MAINTAINED IN THE SYSTEM, INCLUDING CATEGORIES OF USERS AND THE PURPOSES OF SUCH USES: In addition to those disclosures generally permitted under 5 U.S.C. 552a(b) of the Privacy Act, these records or information contained therein may specifically be disclosed outside the DoD as a routine use pursuant to 5 U.S.C. 552a(b)(3) as follows: To the insurance carriers and the U.S. Department of Labor, Bureau of Employees Compensation to process employee compensation claims. The ‘‘Blanket Routine Uses’’ that appear at the beginning of the Navy’s compilation of systems notices also apply to this system. Policies and practices for storing, retrieving, accessing, retaining, and disposing of records in the system: STORAGE: The media in which these records are maintained vary, but include: Computer records (Local Area Network (LAN) File Server); card files; file folders; ledgers; microfiche; and printed reports. rfrederick on PROD1PC67 with NOTICES RETRIEVABILITY: Name and/or Social Security Number and employee payroll number. Password controlled system, file, and element access based on predefined need-to-know. Physical access to Jkt 214001 Federal Energy Regulatory Commission [Docket Nos. ER07–1289–002; ER07–1289– 003; ER07–1289–004; ER07–1289–005] Destroy after GAO audit or when 6 years old, whichever is sooner. ISO New England Inc.; Notice Shortening Response Time SYSTEM MANAGER(S) AND ADDRESS: April 24, 2008. Policy Official: Commander, Navy Exchange Service Command, 3280 Virginia Beach Boulevard, Virginia Beach, VA 23452–5724. Record Holder Manager: Risk Management and Workers Compensation Branch (TD2); Insurance/ Employee Benefits Branch (HRG4), Navy Exchange Service Command, 3280 Virginia Beach Boulevard, Virginia Beach, VA 23452–5724. On April 22, 2008, New England Power Pool Participants Committee, ISO New England Inc., MEPCO H.Q. Energy Services (U.S.), Inc. and the Participating Transmission Owners Administrative Committee (collectively, Joint Movants) filed a Joint Emergency Motion to Establish Hearing Procedures in the above-referenced proceeding (April 22 Motion). Included in the filing was a request to shorten the period for submission of answers to the Joint Movants’ motion to April 25, 2008. On April 23, 2008, Casco Bay Energy Company, LLC, filed an answer opposing the Joint Movants’ request to shorten the response period. By this notice, the request to establish April 25, 2008 as the date for filing answers to the April 22 Motion is denied. However, we will shorten the response period to and including May 2, 2008. NOTIFICATION PROCEDURE: Individuals seeking to determine whether this system of records contains information about themselves should address written inquiries to the Commander, Navy Exchange Service Command, 3280 Virginia Beach Boulevard, Virginia Beach, VA 23452– 5724. The request must contain the individual’s full name, Social Security Number, and activity where last employed. RECORD ACCESS PROCEDURES: Individuals seeking access to records about themselves contained in this system of records should address written inquiries to the Commander, Navy Exchange Service Command, 3280 Virginia Beach Boulevard, Virginia Beach, VA 23452–5724. The request must contain the individual’s full name, Social Security Number, and activity where last employed. CONTESTING RECORD PROCEDURES: The Navy’s rules for accessing records, and for contesting contents and appealing initial agency determinations are published in Secretary of the Navy Instruction 5211.5; 32 CFR part 701; or may be obtained from the system manager. RECORD SOURCE CATEGORIES: Individual, supervisor, employee’s physician and/or insurance carrier’s physician. EXEMPTIONS CLAIMED FOR THE SYSTEM: SAFEGUARDS: 15:16 May 02, 2008 DEPARTMENT OF ENERGY RETENTION AND DISPOSAL: CATEGORIES OF INDIVIDUALS COVERED BY THE SYSTEM: VerDate Aug<31>2005 terminals, terminal rooms, buildings and activities’ grounds are controlled by locked terminals and rooms, guards, personnel screening and visitor registers. None. [FR Doc. E8–9804 Filed 5–2–08; 8:45 am] BILLING CODE 5001–06–P PO 00000 Frm 00051 Fmt 4703 Sfmt 4703 Kimberly D. Bose, Secretary. [FR Doc. E8–9795 Filed 5–2–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12557–001] SBER Royal Mills, LLC; Notice of Application Accepted for Filing; Soliciting Motions To Intervene and Protests; Ready for Environmental Analysis; Soliciting Comments, Terms and Conditions, Recommendations, and Prescriptions; Establishing an Expedited Schedule; and Waiving Scoping April 25, 2008. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Exemption From Licensing. b. Project No.: P–12557–001. c. Date Filed: December 12, 2007. d. Applicant: SBER Royal Mills, LLC. e. Name of Project: Royal Mills Hydroelectric Project. E:\FR\FM\05MYN1.SGM 05MYN1 rfrederick on PROD1PC67 with NOTICES Federal Register / Vol. 73, No. 87 / Monday, May 5, 2008 / Notices f. Location: On the South Branch Pawtuxet River, in the town of West Warwick, Kent County, Rhode Island. This project does not occupy federal lands. g. Filed Pursuant to: Public Utilities Regulatory Policies Act of 1978, 16 U.S.C. 2705, 2708. h. Applicant Contact: Quentin Chafee, Development Director, Struever Bros. Eccles & Rouse, Inc., 166 Valley Street, Building 6M, Suite 103, Providence, RI 02909, (401) 574–2100, Q.Chafee@sber.com. i. FERC Contact: Steve Kartalia, Stephen.Kartalia@ferc.gov, (202) 502– 6131. j. Deadline for filing motions to intervene and protests, comments, terms and conditions, recommendations, and prescriptions: 60 days from the issuance of this notice. All reply comments must be filed with the Commission within 105 days from the date of this notice. All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. Motions to intervene, protests, comments, terms and conditions, recommendations, and prescriptions may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s web site (https:// www.ferc.gov) under the ‘‘eFiling’’ link. k. This application has been accepted for filing and is now ready for environmental analysis. l. Project Description: The Royal Mills Hydroelectric Project would consist of the following facilities: (1) An existing 110-foot-long by 21-foot-high granite block dam; (2) an existing 3.8-acre reservoir; (3) an existing 150-foot-long by 40-foot-wide power canal; (4) an existing powerhouse containing one single new cross-flow turbine generating unit with total installed generating capacity of 225 kilowatts (kW); and (5) appurtenant facilities. The restored project would have an estimated average annual generation of 1,000,000 kilowatt- VerDate Aug<31>2005 15:16 May 02, 2008 Jkt 214001 hours. The dam and existing project facilities are owned by the applicant. m. A copy of the application is on file with the Commission and is available for public inspection. This filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number filed to access the documents. For assistance, please contact FERC Online Support at FERCOnlineSupport @ferc.gov or toll free at (866) 208–3676 or for TTY, contact (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Procedural schedule and final amendments: We intend to substitute the pre-filing and post-filing consultation that has occurred on this project for our standard National Environmental Policy Act scoping process. Commission staff propose to issue a single environmental assessment rather than issue a draft and final EA. Staff intend to give at least 30 days for entities to comment on the EA, and will consider all comments received on the EA before final action is taken on the exemption application. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of this notice. Kimberly D. Bose, Secretary. [FR Doc. E8–9779 Filed 5–2–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4306–017] City of Hastings, MN; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Fishway Prescriptions April 28, 2008. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 24581 a. Type of Application: Amendment of License. b. Project No.: 4306–017. c. Date Filed: April 24, 2008. d. Applicant: City of Hastings, Minnesota. e. Name of Project: Mississippi River Lock and Dam No. 2. f. Location: The project would be located on the Mississippi River in the City of Hastings, which is located in Dakota County, Minnesota. The project would use the U.S. Army Corps of Engineers owned Lock and Dam No. 2. The proposed hydrokinetic devices would be located approximately 50-feet downstream of the existing hydroelectric plant’s draft tubes and would be located entirely within the existing project boundary. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contacts: Mr. Thomas Montgomery, P.E., Public Works Director, City of Hastings, Minnesota, 1225 Progress Drive, Hastings, MN 55033–1955, (651) 480–6188, and Mr. Wayne Krouse, Hydro Green Energy, LLC, 5090 Richmond Avenue, #390, Houston, TX 77056, (877) 556–6566. i. FERC Contact: Kelly Houff, (202) 502–6393, and e-mail Kelly.Houff@ferc.gov. j. Deadline for filing comments, protests, motions to intervene, recommendations, preliminary terms and conditions, and fishway prescriptions is due 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice. All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please include the project number (P–4306–017) on any comments or motions filed. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: The existing licensed project consists of (1) A powerhouse containing 2 generating units rated at 2,200 kW each; (2) transmission facilities consisting of: (a) 6.6 kV generator leads; (b) two threephase, step-up transformers; and (c) a 1,000-foot-long transmission line; and (3) appurtenant facilities. E:\FR\FM\05MYN1.SGM 05MYN1

Agencies

[Federal Register Volume 73, Number 87 (Monday, May 5, 2008)]
[Notices]
[Pages 24580-24581]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-9779]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12557-001]


SBER Royal Mills, LLC; Notice of Application Accepted for Filing; 
Soliciting Motions To Intervene and Protests; Ready for Environmental 
Analysis; Soliciting Comments, Terms and Conditions, Recommendations, 
and Prescriptions; Establishing an Expedited Schedule; and Waiving 
Scoping

April 25, 2008.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Exemption From Licensing.
    b. Project No.: P-12557-001.
    c. Date Filed: December 12, 2007.
    d. Applicant: SBER Royal Mills, LLC.
    e. Name of Project: Royal Mills Hydroelectric Project.

[[Page 24581]]

    f. Location: On the South Branch Pawtuxet River, in the town of 
West Warwick, Kent County, Rhode Island. This project does not occupy 
federal lands.
    g. Filed Pursuant to: Public Utilities Regulatory Policies Act of 
1978, 16 U.S.C. 2705, 2708.
    h. Applicant Contact: Quentin Chafee, Development Director, 
Struever Bros. Eccles & Rouse, Inc., 166 Valley Street, Building 6M, 
Suite 103, Providence, RI 02909, (401) 574-2100, Q.Chafee@sber.com.
    i. FERC Contact: Steve Kartalia, Stephen.Kartalia@ferc.gov, (202) 
502-6131.
    j. Deadline for filing motions to intervene and protests, comments, 
terms and conditions, recommendations, and prescriptions: 60 days from 
the issuance of this notice. All reply comments must be filed with the 
Commission within 105 days from the date of this notice.
    All documents (original and eight copies) should be filed with: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    Motions to intervene, protests, comments, terms and conditions, 
recommendations, and prescriptions may be filed electronically via the 
Internet in lieu of paper. The Commission strongly encourages 
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions 
on the Commission's web site (https://www.ferc.gov) under the 
``eFiling'' link.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. Project Description: The Royal Mills Hydroelectric Project would 
consist of the following facilities: (1) An existing 110-foot-long by 
21-foot-high granite block dam; (2) an existing 3.8-acre reservoir; (3) 
an existing 150-foot-long by 40-foot-wide power canal; (4) an existing 
powerhouse containing one single new cross-flow turbine generating unit 
with total installed generating capacity of 225 kilowatts (kW); and (5) 
appurtenant facilities. The restored project would have an estimated 
average annual generation of 1,000,000 kilowatt-hours. The dam and 
existing project facilities are owned by the applicant.
    m. A copy of the application is on file with the Commission and is 
available for public inspection. This filing may also be viewed on the 
web at https://www.ferc.gov using the ``eLibrary'' link. Enter the 
docket number, excluding the last three digits in the docket number 
filed to access the documents. For assistance, please contact FERC 
Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 
208-3676 or for TTY, contact (202) 502-8659. A copy is also available 
for inspection and reproduction at the address in item h above.
    Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    n. Procedural schedule and final amendments: We intend to 
substitute the pre-filing and post-filing consultation that has 
occurred on this project for our standard National Environmental Policy 
Act scoping process. Commission staff propose to issue a single 
environmental assessment rather than issue a draft and final EA. Staff 
intend to give at least 30 days for entities to comment on the EA, and 
will consider all comments received on the EA before final action is 
taken on the exemption application.
    Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of this notice.

Kimberly D. Bose,
Secretary.
 [FR Doc. E8-9779 Filed 5-2-08; 8:45 am]