SBER Royal Mills, LLC; Notice of Application Accepted for Filing; Soliciting Motions To Intervene and Protests; Ready for Environmental Analysis; Soliciting Comments, Terms and Conditions, Recommendations, and Prescriptions; Establishing an Expedited Schedule; and Waiving Scoping, 24580-24581 [E8-9779]
Download as PDF
24580
Federal Register / Vol. 73, No. 87 / Monday, May 5, 2008 / Notices
SYSTEM LOCATION:
Navy Exchange Service Command,
3280 Virginia Beach Boulevard, Virginia
Beach, VA 23452–5724 (for all Navy
Exchanges).
Civilian employees and former
civilian employees with the Navy
Exchange Service Command and Navy
Exchanges located worldwide. Payroll
and benefits information for current and
former civilian employees of Coast
Guard exchanges, clubs and messes.
CATEGORIES OF RECORDS IN THE SYSTEM:
Leave accrual reports; earnings
records; insurance records and reports
regarding property damage, personal
injury or death, group life, disability,
medical and retirement plan records.
AUTHORITY FOR MAINTENANCE OF THE SYSTEM:
10 U.S.C. 5013, Secretary of the Navy
and E.O. 9397 (SSN).
PURPOSE(S):
To record contributions to benefit
plans; to process all insurance claims; to
calculate retirement benefits upon
request of employees.
ROUTINE USES OF RECORDS MAINTAINED IN THE
SYSTEM, INCLUDING CATEGORIES OF USERS AND
THE PURPOSES OF SUCH USES:
In addition to those disclosures
generally permitted under 5 U.S.C.
552a(b) of the Privacy Act, these records
or information contained therein may
specifically be disclosed outside the
DoD as a routine use pursuant to 5
U.S.C. 552a(b)(3) as follows:
To the insurance carriers and the U.S.
Department of Labor, Bureau of
Employees Compensation to process
employee compensation claims.
The ‘‘Blanket Routine Uses’’ that
appear at the beginning of the Navy’s
compilation of systems notices also
apply to this system. Policies and
practices for storing, retrieving,
accessing, retaining, and disposing of
records in the system:
STORAGE:
The media in which these records are
maintained vary, but include: Computer
records (Local Area Network (LAN) File
Server); card files; file folders; ledgers;
microfiche; and printed reports.
rfrederick on PROD1PC67 with NOTICES
RETRIEVABILITY:
Name and/or Social Security Number
and employee payroll number.
Password controlled system, file, and
element access based on predefined
need-to-know. Physical access to
Jkt 214001
Federal Energy Regulatory
Commission
[Docket Nos. ER07–1289–002; ER07–1289–
003; ER07–1289–004; ER07–1289–005]
Destroy after GAO audit or when 6
years old, whichever is sooner.
ISO New England Inc.; Notice
Shortening Response Time
SYSTEM MANAGER(S) AND ADDRESS:
April 24, 2008.
Policy Official: Commander, Navy
Exchange Service Command, 3280
Virginia Beach Boulevard, Virginia
Beach, VA 23452–5724.
Record Holder Manager: Risk
Management and Workers
Compensation Branch (TD2); Insurance/
Employee Benefits Branch (HRG4),
Navy Exchange Service Command, 3280
Virginia Beach Boulevard, Virginia
Beach, VA 23452–5724.
On April 22, 2008, New England
Power Pool Participants Committee, ISO
New England Inc., MEPCO H.Q. Energy
Services (U.S.), Inc. and the
Participating Transmission Owners
Administrative Committee (collectively,
Joint Movants) filed a Joint Emergency
Motion to Establish Hearing Procedures
in the above-referenced proceeding
(April 22 Motion). Included in the filing
was a request to shorten the period for
submission of answers to the Joint
Movants’ motion to April 25, 2008. On
April 23, 2008, Casco Bay Energy
Company, LLC, filed an answer
opposing the Joint Movants’ request to
shorten the response period.
By this notice, the request to establish
April 25, 2008 as the date for filing
answers to the April 22 Motion is
denied. However, we will shorten the
response period to and including May 2,
2008.
NOTIFICATION PROCEDURE:
Individuals seeking to determine
whether this system of records contains
information about themselves should
address written inquiries to the
Commander, Navy Exchange Service
Command, 3280 Virginia Beach
Boulevard, Virginia Beach, VA 23452–
5724.
The request must contain the
individual’s full name, Social Security
Number, and activity where last
employed.
RECORD ACCESS PROCEDURES:
Individuals seeking access to records
about themselves contained in this
system of records should address
written inquiries to the Commander,
Navy Exchange Service Command, 3280
Virginia Beach Boulevard, Virginia
Beach, VA 23452–5724.
The request must contain the
individual’s full name, Social Security
Number, and activity where last
employed.
CONTESTING RECORD PROCEDURES:
The Navy’s rules for accessing
records, and for contesting contents and
appealing initial agency determinations
are published in Secretary of the Navy
Instruction 5211.5; 32 CFR part 701; or
may be obtained from the system
manager.
RECORD SOURCE CATEGORIES:
Individual, supervisor, employee’s
physician and/or insurance carrier’s
physician.
EXEMPTIONS CLAIMED FOR THE SYSTEM:
SAFEGUARDS:
15:16 May 02, 2008
DEPARTMENT OF ENERGY
RETENTION AND DISPOSAL:
CATEGORIES OF INDIVIDUALS COVERED BY THE
SYSTEM:
VerDate Aug<31>2005
terminals, terminal rooms, buildings
and activities’ grounds are controlled by
locked terminals and rooms, guards,
personnel screening and visitor
registers.
None.
[FR Doc. E8–9804 Filed 5–2–08; 8:45 am]
BILLING CODE 5001–06–P
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
Kimberly D. Bose,
Secretary.
[FR Doc. E8–9795 Filed 5–2–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12557–001]
SBER Royal Mills, LLC; Notice of
Application Accepted for Filing;
Soliciting Motions To Intervene and
Protests; Ready for Environmental
Analysis; Soliciting Comments, Terms
and Conditions, Recommendations,
and Prescriptions; Establishing an
Expedited Schedule; and Waiving
Scoping
April 25, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Exemption
From Licensing.
b. Project No.: P–12557–001.
c. Date Filed: December 12, 2007.
d. Applicant: SBER Royal Mills, LLC.
e. Name of Project: Royal Mills
Hydroelectric Project.
E:\FR\FM\05MYN1.SGM
05MYN1
rfrederick on PROD1PC67 with NOTICES
Federal Register / Vol. 73, No. 87 / Monday, May 5, 2008 / Notices
f. Location: On the South Branch
Pawtuxet River, in the town of West
Warwick, Kent County, Rhode Island.
This project does not occupy federal
lands.
g. Filed Pursuant to: Public Utilities
Regulatory Policies Act of 1978, 16
U.S.C. 2705, 2708.
h. Applicant Contact: Quentin Chafee,
Development Director, Struever Bros.
Eccles & Rouse, Inc., 166 Valley Street,
Building 6M, Suite 103, Providence, RI
02909, (401) 574–2100,
Q.Chafee@sber.com.
i. FERC Contact: Steve Kartalia,
Stephen.Kartalia@ferc.gov, (202) 502–
6131.
j. Deadline for filing motions to
intervene and protests, comments, terms
and conditions, recommendations, and
prescriptions: 60 days from the issuance
of this notice. All reply comments must
be filed with the Commission within
105 days from the date of this notice.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Motions to intervene, protests,
comments, terms and conditions,
recommendations, and prescriptions
may be filed electronically via the
Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s web site (https://
www.ferc.gov) under the ‘‘eFiling’’ link.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. Project Description: The Royal Mills
Hydroelectric Project would consist of
the following facilities: (1) An existing
110-foot-long by 21-foot-high granite
block dam; (2) an existing 3.8-acre
reservoir; (3) an existing 150-foot-long
by 40-foot-wide power canal; (4) an
existing powerhouse containing one
single new cross-flow turbine generating
unit with total installed generating
capacity of 225 kilowatts (kW); and (5)
appurtenant facilities. The restored
project would have an estimated average
annual generation of 1,000,000 kilowatt-
VerDate Aug<31>2005
15:16 May 02, 2008
Jkt 214001
hours. The dam and existing project
facilities are owned by the applicant.
m. A copy of the application is on file
with the Commission and is available
for public inspection. This filing may
also be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits in the docket number
filed to access the documents. For
assistance, please contact FERC Online
Support at FERCOnlineSupport
@ferc.gov or toll free at (866) 208–3676
or for TTY, contact (202) 502–8659. A
copy is also available for inspection and
reproduction at the address in item h
above.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural schedule and final
amendments: We intend to substitute
the pre-filing and post-filing
consultation that has occurred on this
project for our standard National
Environmental Policy Act scoping
process. Commission staff propose to
issue a single environmental assessment
rather than issue a draft and final EA.
Staff intend to give at least 30 days for
entities to comment on the EA, and will
consider all comments received on the
EA before final action is taken on the
exemption application.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of this notice.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–9779 Filed 5–2–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4306–017]
City of Hastings, MN; Notice of
Application Accepted for Filing,
Soliciting Motions To Intervene and
Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Terms and
Conditions, and Fishway Prescriptions
April 28, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
24581
a. Type of Application: Amendment
of License.
b. Project No.: 4306–017.
c. Date Filed: April 24, 2008.
d. Applicant: City of Hastings,
Minnesota.
e. Name of Project: Mississippi River
Lock and Dam No. 2.
f. Location: The project would be
located on the Mississippi River in the
City of Hastings, which is located in
Dakota County, Minnesota. The project
would use the U.S. Army Corps of
Engineers owned Lock and Dam No. 2.
The proposed hydrokinetic devices
would be located approximately 50-feet
downstream of the existing
hydroelectric plant’s draft tubes and
would be located entirely within the
existing project boundary.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contacts: Mr. Thomas
Montgomery, P.E., Public Works
Director, City of Hastings, Minnesota,
1225 Progress Drive, Hastings, MN
55033–1955, (651) 480–6188, and Mr.
Wayne Krouse, Hydro Green Energy,
LLC, 5090 Richmond Avenue, #390,
Houston, TX 77056, (877) 556–6566.
i. FERC Contact: Kelly Houff, (202)
502–6393, and e-mail
Kelly.Houff@ferc.gov.
j. Deadline for filing comments,
protests, motions to intervene,
recommendations, preliminary terms
and conditions, and fishway
prescriptions is due 60 days from the
issuance date of this notice; reply
comments are due 105 days from the
issuance date of this notice. All
documents (original and eight copies)
should be filed with: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. Please include
the project number (P–4306–017) on any
comments or motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Request: The existing
licensed project consists of (1) A
powerhouse containing 2 generating
units rated at 2,200 kW each; (2)
transmission facilities consisting of: (a)
6.6 kV generator leads; (b) two threephase, step-up transformers; and (c) a
1,000-foot-long transmission line; and
(3) appurtenant facilities.
E:\FR\FM\05MYN1.SGM
05MYN1
Agencies
[Federal Register Volume 73, Number 87 (Monday, May 5, 2008)]
[Notices]
[Pages 24580-24581]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-9779]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12557-001]
SBER Royal Mills, LLC; Notice of Application Accepted for Filing;
Soliciting Motions To Intervene and Protests; Ready for Environmental
Analysis; Soliciting Comments, Terms and Conditions, Recommendations,
and Prescriptions; Establishing an Expedited Schedule; and Waiving
Scoping
April 25, 2008.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Exemption From Licensing.
b. Project No.: P-12557-001.
c. Date Filed: December 12, 2007.
d. Applicant: SBER Royal Mills, LLC.
e. Name of Project: Royal Mills Hydroelectric Project.
[[Page 24581]]
f. Location: On the South Branch Pawtuxet River, in the town of
West Warwick, Kent County, Rhode Island. This project does not occupy
federal lands.
g. Filed Pursuant to: Public Utilities Regulatory Policies Act of
1978, 16 U.S.C. 2705, 2708.
h. Applicant Contact: Quentin Chafee, Development Director,
Struever Bros. Eccles & Rouse, Inc., 166 Valley Street, Building 6M,
Suite 103, Providence, RI 02909, (401) 574-2100, Q.Chafee@sber.com.
i. FERC Contact: Steve Kartalia, Stephen.Kartalia@ferc.gov, (202)
502-6131.
j. Deadline for filing motions to intervene and protests, comments,
terms and conditions, recommendations, and prescriptions: 60 days from
the issuance of this notice. All reply comments must be filed with the
Commission within 105 days from the date of this notice.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Motions to intervene, protests, comments, terms and conditions,
recommendations, and prescriptions may be filed electronically via the
Internet in lieu of paper. The Commission strongly encourages
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions
on the Commission's web site (https://www.ferc.gov) under the
``eFiling'' link.
k. This application has been accepted for filing and is now ready
for environmental analysis.
l. Project Description: The Royal Mills Hydroelectric Project would
consist of the following facilities: (1) An existing 110-foot-long by
21-foot-high granite block dam; (2) an existing 3.8-acre reservoir; (3)
an existing 150-foot-long by 40-foot-wide power canal; (4) an existing
powerhouse containing one single new cross-flow turbine generating unit
with total installed generating capacity of 225 kilowatts (kW); and (5)
appurtenant facilities. The restored project would have an estimated
average annual generation of 1,000,000 kilowatt-hours. The dam and
existing project facilities are owned by the applicant.
m. A copy of the application is on file with the Commission and is
available for public inspection. This filing may also be viewed on the
web at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number, excluding the last three digits in the docket number
filed to access the documents. For assistance, please contact FERC
Online Support at FERCOnlineSupport@ferc.gov or toll free at (866)
208-3676 or for TTY, contact (202) 502-8659. A copy is also available
for inspection and reproduction at the address in item h above.
Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. Procedural schedule and final amendments: We intend to
substitute the pre-filing and post-filing consultation that has
occurred on this project for our standard National Environmental Policy
Act scoping process. Commission staff propose to issue a single
environmental assessment rather than issue a draft and final EA. Staff
intend to give at least 30 days for entities to comment on the EA, and
will consider all comments received on the EA before final action is
taken on the exemption application.
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of this notice.
Kimberly D. Bose,
Secretary.