Final Environmental Impact Statement for the Transformation of the Pennsylvania Army National Guard 56th Brigade Into a Stryker Brigade Combat Team at the National Guard Training Center-Fort Indiantown Gap, PA
The Department of the Army (DA) and National Guard Bureau have proposed to transform the Pennsylvania Army National Guard (PAARNG) 56th Brigade into a Stryker Brigade Combat Team (SBCT). This Environmental Impact Statement (EIS) discusses in-depth three alternatives: The Preferred Alternative, the Train Using Existing Army Facilities Alternative, and the No-Action Alternative, Under the Preferred Alternative, the PAARNG proposes construction of new training and support facilities at the National Guard Training CenterFort Indiantown Gap (NGTC-FTIG); at Fort Pickett, VA; and at local PAARNG facilities across the State of Pennsylvania, as well as conducting Annual Training (AT) at Fort A.P. Hill, VA, in order to accomplish requisite training. Under the Train Using Existing Army Facilities Alternative, no construction at NGTC-FTIG, Pennsylvania or Fort Pickett, VA would occur; the statewide facilities improvements would occur. Required SBCT Inactive Duty Training (IDT) and AT would be conducted at select regional Army training installations, using existing facilities. Other alternatives considered but eliminated from detailed study are also addressed in the EIS.
Intent To Prepare a Draft Environmental Impact Statement for the Everglades National Park Seepage Management Project, Miami-Dade County, FL
The U.S. Army Corps of Engineers (Corps), Jacksonville District, intends to prepare an integrated Project Implementation Report/Draft Environmental Impact Statement (PIR/DEIS) for the Everglades National Park (ENP) Seepage Management Project. The study is a cooperative effort between the Corps and the South Florida Water Management District (SFWMD), which is also a cooperating agency for this DEIS. The project seeks to reduce eastward water seepage from the Everglades system for the benefit of wetland communities within ENP. The ENP Seepage Management Project is comprised of three components that were recommended as a part of the Central and Southern Florida (C&SF) Project Comprehensive Review Study Feasibility Report and Integrated Environmental Impact Statement (EIS) dated April 1999 (Restudy), and is part of the Comprehensive Everglades Restoration Plan (CERP). The project includes an aboveground recharge area, a wetland buffer area, relocation and enhancement of levee L-31N, a sheetflow delivery system, and other features located adjacent to ENP in Miami- Dade County.
The Freedom of Information Act Program
The Department of the Army is revising our rule in support of the Freedom of Information Act as required by public law and updating the provisions for access and release of information from all Army information systems (automated and manual) that further supports the Army's Records Management Program. This rule finalizes the proposed rule that was published in the Federal Register on December 28, 2004.
Inland Waterways Users Board; Request for Nominations
Section 302 of Public Law 99-662 established the Inland Waterways Users Board. The Board is an independent Federal advisory committee. The Secretary of the Army appoints its 11 members. This notice is to solicit nominations for four (4) appointments or reappointments to two-year terms that will begin after August 1, 2006.
Notice of Availability of the Supplement Draft Environmental Impact Statement for the Proposed Everglades Agricultural Area (EAA) A-1 Reservoir Located in Palm Beach County, FL
The U.S. Army Corps of Engineers (USACE) is issuing this notice to advise the public that a Supplement Draft Environmental Impact Statement (EIS) has been completed and is available for review and comment.
Privacy Act of 1974; System of Records
The Department of the Army is proposing to amend a system of records notice in its existing inventory of records systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Intent To Prepare a Draft Environmental Impact Statement for the Construction and Operation of an Open Pit Taconite Mine Proposed by Ispat Inland Mining Between Biwabik and McKinley in St. Louis County, MN
Ispat Inland Mining (Ispat) has applied to the St. Paul District, Corps of Engineers (Corps) for a permit to discharge dredged or fill material into wetlands to facilitate the construction and operation of a taconite mine consisting of two conventional open pits in a deposit known as the East Reserve (formerly known as the J&L East Reserve) between Biwabik and McKinley in St. Louis County, MN. The combined area of the two open pits would be 364 acres. The proposed pits contain an estimated 116,000,000 long tons of ore. The ore would be hauled by truck approximately 1.9 miles on a proposed new haul road spur and then an additional 5.5 miles on an existing haul road to Ispat's currently permitted and operating Minorca taconite processing facility north of Virginia, MN. Tailing waste would be disposed of in Ispat's currently permitted and operating Minorca and Upland tailings basins. The mining process would require the construction of overburden, waste rock, and lean ore stockpiles on the north side of the proposed pits. The total stockpile area would cover approximately 375 acres. Project plans call for the mining of an average of just over six million long tons of crude ore per year over the proposed 18-year life of the mine. The project would allow mining operations and taconite processing at the Minorca Plant to continue until 2024. The project would require the discharge of dredged or fill material into approximately 75.7 acres of wetlands. While some of the wetlands may be isolated, the majority of the wetlands are adjacent to an unnamed tributary to the Embarrass River, which is a tributary to the St. Louis River, which is a navigable water of the U.S., or the wetlands are adjacent to an unnamed tributary to the Pike River, which is a navigable water of the United States. Ispat proposes to utilize wetland credits from the existing Ispat Inland wetland mitigation bank in Aitkin County, MN to compensate for the lost wetland functions and values that would be caused by the proposed project. The discharge of dredged or fill material into waters of the United States requires a permit issued by the Corps under Section 404 of the Clean Water Act. The final environmental impact statement will be used as a basis for the permit decision and to ensure compliance with the National Environmental Policy Act (NEPA).
Inland Waterways Users Board
In Accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting. Name of Committee: Inland Waterways Users Board (Board). Date: February 22, 2006. Location: The Embassy SuitesOld Town Alexandria, 1900 Diagonal Road, Alexandria, VA 22314, (703-684-5900). Time: Registration will begin at 8:30 a.m. and the meeting is scheduled to adjourn at 12:30 p.m. Agenda: The Board will consider its project investment priorities for the next fiscal year. The Board will also hear briefings on the status of both the funding for inland navigation projects and studies, and the Inland Waterways Trust Fund.
Notice of Intent To Prepare an Environmental Impact Statement (EIS) in Support of New Facilities for the U.S. Army Medical Research Institute of Infectious Diseases (USAMRIID), Fort Detrick, MD
The U.S. Army announces its intent to prepare an Environmental Impact Statement (EIS) to evaluate the construction and operation of new USAMRIID facilities and the decommissioning and demolition or reuse of existing USAMRIID facilities at Fort Detrick. This EIS is being prepared and considered in accordance with requirements of the National Environmental Policy Act (NEPA) of 1969, regulations of the President's Council on Environmental Quality (40 CFR parts 1500-1508), and the Army's implementation of NEPA (32 CFR part 651), 29 March 2002. The proposed new USAMRIID facilities will provide biocontainment laboratory space, animal facilities, and administrative offices, as well as operational and administrative support facilities. These new facilities will be located adjacent to the existing USAMRIID facilities within the National Interagency Biodefense Campus on Area A of Fort Detrick and near the biomedical research facilities of mission partners, including the Agricultural Research Service Foreign Disease Weed Research Unit of the U.S. Department of Agriculture, the planned National Institute of Allergy and Infectious Diseases' Integrated Research Facility, and the Department of Homeland Security's National Biodefense Analysis and Countermeasures Center. The existing USAMRIID facilities on Area A will be decommissioned and either demolished or reused following occupancy of the new USAMRIID facilities. The construction will occur in two stages. Stage 1 will provide approximately 700,000 gross square feet (gsf) of new building space for the replacement of outdated and compressed existing USAMRIID facilities in order to sustain the current mission and to expand medical testing and evaluation (T&E) capacity in support of immediate Department of Defense (DoD) and national demand. Stage 2 will encompass approximately 400,000 gsf of new building space for the balance of USAMRIID's expanded mission and for additional capacity to meet intensified national requirements for medical test and evaluation in support of biodefense research as well as to accommodate increased collaborative efforts among USAMRIID's mission partners. In addition, approximately 200,000 gsf of the existing USAMRIID facilities may be renovated and reused for laboratory or non-laboratory use, to be determined by evolving biodefense requirements.
Armed Forces Epidemiological Board; Meeting
In accordance with section 10(1)(2) of Public Law 92-463. The Federal Advisory Committee Act, announcement is made of the following meeting: Name of Committee: Armed Forces Epidemiological Board (AFEB). Dates: March 7, 2006 (Closed meeting). March 8, 2006 (Open meeting). Times: 8 a.m.-5 p.m. (March 7, 2006). 7:30 a.m.-2 p.m. (March 8, 2006). Location: U.S. Army Medical Research and Material Command Headquarters Building. Bldg. 810, Room B18, Fort Detrick, MD (March 7, 2006) and U.S. Army Medical Research Institute of Infectious Diseases, 1425 Porter Street, Fort Detrick, MD 21702-5011. Agenda: The purpose of the meeting is to address pending and new board issues, provide briefings for Board members on topics related to ongoing and new Board issues, conduct subcommittee meetings, and conduct an executive working session.
Intent To Prepare a Programmatic Draft Environmental Impact Statement/Environmental Impact Report for the Los Angeles River Ecosystem Restoration Study, Los Angeles, CA
The study area is located within the Los Angeles Basin on a broad alluvial plain flanked by the Santa Monica Mountains, to the west, and by the San Gabriel Mountains to the northeast. The Los Angeles River flows from the headwaters of Bell Creek and Calabasas Creek in the San Fernando Valley community of Canoga Park southeast through the San Fernando Valley some 35 miles to downtown Los Angeles. From there it continues in a southerly direction until it empties into the Pacific Ocean at Long Beach. The specific study area comprises the 32 miles of the River within the City of Los Angeles that extends from Owensmouth Avenue, in the upper reaches of northwest San Fernando Valley, to the border of the City of Vernon, at the southern end of Downtown Los Angeles. The study proposes to consider a range of activities to restore riparian and aquatic habitat, and related habitat functions, in and adjacent to the Los Angeles River. Compatible activities to conserve cultural resources, and to provide recreational and interpretive amenities, will also be considered. Purpose: The purpose of this study is to identify a range of opportunities to improve the general environment of the Los Angeles River through ecosystem restoration and related measures. The study area includes several locations where potential exists for restoring a more natural riverine environment along the Los Angeles River, while maintaining and improving levels of flood protection. Creation of treatment wetlands in and around the river, to treat effluent river flows and to restore missing linkages of fragmented habitat, would also be pursued. Restored areas would provide natural riparian habitat to support indigenous wildlife and avifauna along a corridor transecting most of the San Fernando Valley, and extending into downtown Los Angeles. Other purposes include provision of public access to the river, identification of incidental recreation space, and delineation of trails. Site-specific Environmental Impact Statement-Environment Impact Reports (EIS/EIR) would be prepared in the future to evaluate and document individual projects that may result from this study.
Estuary Habitat Restoration Council; Open Meeting
In accordance with section 105(h) of the Estuary Restoration Act of 2000, (Title I, Pub. L. 106-457), announcement is made of the forthcoming meeting of the Estuary Habitat Restoration Council. The meeting is open to the public.
Board of Visitors, United States Military Academy (USMA)
The notice of an open meeting scheduled for February 8, 2006 published in the Federal Register on January 13, 2006 (71 FR 2193) has added one closed session.
Notice of Availability of the Final Supplement II to the Final EIS (FSII) for the Proposed New Water Supply Reservoir Located in Williamson and Johnson Counties, for the City of Marion, IL
The U.S. Army Corps of Engineers is issuing this notice to advise the public that the Final Supplement II to the Final Environmental Impact Statement has been completed for the City of Marion, Illinois, and is available for review and comment.
Intent To Prepare an Environmental Impact Statement for the Proposed Halligan-Seaman Water Management Project in Northeastern Colorado
The U.S. Army Corps of Engineers (COE) is preparing an Environmental Impact Statement (EIS) to analyze the direct, indirect and cumulative effects of two water supply projects being proposed collectively as the Halligan-Seaman Water Management Project. Construction of the proposed Project(s) will result in temporary and permanent impacts to jurisdictional waters of the United States, thereby requiring Clean Water Act Section 404 permits. The Cities of Fort Collins and Greeley (Cities), and six other water providers (Participants), have proposed the Project(s) to provide drought protection of existing and future water demands, more efficiency in managing Participants' existing or future water rights, some operational redundancy, and possibly environmental benefits. Construction of the proposed Project(s) involves enlargement of two existing reservoirs: Halligan Reservoir and Milton Seamen Reservoir (Seaman Reservoir), resulting in approximately 88,592 acre-feet of additional storage capacity in the Cache la Poudre River Basin. The Halligan-Seaman Water Management Project would be a non-federal project constructed, owned and operated by the Cities and/or Participants.
Notice of Intent To Grant Exclusive Patent License to the National Center for Composite Systems Technology
In compliance with 37 CFR 404 et seq., the Department of the Army hereby gives notice of its intent to grant to The National Center for Composite Systems Technology, a corporation having its principle place of business at 2000 Composite Drive, Kettering, OH 45420, an exclusive relative to U.S. Army Research Laboratory (ARL) patent US 6,881,374 entitled, ``Apparatus for Induction Lamination of Electrically Conductive Fiber-Reinforced Thermoplastic''; April 19, 2005, Gerhard et al.
Navigation Regulations
The U.S. Army Corps of Engineers (Corps) is withdrawing the proposed rule published on May 25, 2005 (70 FR 30042) which proposed to establish a procedure for modifying the scheduled operational hours at the Lake Washington Ship Canal, Hiram M. Chittenden Locks in Seattle, Washington. The proposed rule would have permitted the District Engineer to change the scheduled operational hours of the locks following issuance of a public notice and after providing a 30-day comment period for any proposed change. The Corps has determined that there is no present need to implement changes in the operation of the Hiram M. Chittenden Locks. The Corps intends to initiate rulemaking in the future if circumstances necessitate instituting a change in the schedule or other parameters of Locks operation.
Availability of Baltimore Harbor and Channels Dredged Material Management Plan and Final Tiered Environmental Impact Statement
In accordance with the requirements of the National Environmental Policy Act, the U.S. Army Corps of Engineers (USACE), Baltimore District has prepared a Final Tiered Environmental Impact Statement (FTEIS) and Dredged Material Management Plan (DMMP) to analyze dredged material placement for the Port of Baltimore for 20 years of maintenance and new work dredging. USACE is making the document available to the public through a Notice of Availability published in the Federal Register. The overall goal of the DMMP is to develop a plan to maintain, in an economically and environmentally sound manner, channels necessary for navigation for the Port of Baltimore, conduct dredged material placement in the most environmentally sound manner, and maximize the use of dredged material as a beneficial resource. The recommendations which will provide a minimum of 20 years of dredged material placement capacity for the Port of Baltimore are: Continued maintenance dredging of the Virginia channels and use of the existing open-water placement sites in Virginia (Dam Neck Open Water Placement; Rappahannock Shoal Deep Alternate Open Water Placement; and Wolf Trap Alternate Open Water Placement). Continued maintenance dredging of the Maryland channels and use of the existing sites in Maryland including Pooles Island Open Water Site, Hart-Miller Island Dredged Material Containment Facility (HMI DMCF), Cox Creek Confined Disposal Facility (CDF) (+36 ft dike height), and Poplar Island Environmental Restoration Project (PIERP). Multiple confined disposal facilities for harbor material in Patapsco River. PIERP Expansion in Talbot County, Maryland. Large Island Restoration in Middle Chesapeake Bay, Maryland. Wetland Restoration in Dorchester County, Maryland. Continue to pursue opportunities to innovatively use dredged material.
Intent To Prepare a Draft Environmental Impact Statement for the Wilmington Harbor-96 Act, General Reevaluation Report, New Hanover County, NC
The Wilmington Harbor-96 Act project is being constructed for the purpose of enhancing commercial shipping the Cape Fear River and Northeast Cape Fear River, and the State Port in Wilmington, New Hanover County, NC. The project, including turning basin and mitigation efforts were originally addressed in an Environmental Impact Statement, Cape FearNortheast Cape Fear Rivers Comprehensive Study, Wilmington, NC, dated June 1996, which was supplemented by an Environmental Assessment, Preconstruction Modifications of Authorized Improvements, Wilmington Harbor, NC, dated February 2000. However since then, the need for new project features and mitigation issues have arisen. In order to address these issues, a General Reevaluation Report (GRR) will be prepared, and a Draft Environmental Impact Statement (DEIS) will be included as a part of this process. The GRR and DEIS will address the proposed relocation of a turning basin in the Northeast Cape Fear River, and a reevaluation of alternatives for fish passage at the three locks and dams on the Cape Fear River.
Intent To Prepare a Draft Supplemental Environmental Impact Statement/Environmental Impact Report for the Yuba River Basin Project, Yuba County, CA
In accordance with the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA), the U.S. Army Corps of Engineers (Corps), Sacramento District, is preparing a Draft Supplemental Environmental Impact Statement/Environmental Impact Report (SEIS/EIR) to reevaluate the previously authorized plan and other alternatives to reduce flood damages and restore riparian and aquatic habitat in the lower Yuba River Basin, part of the Feather River Basin, and the city of Marysville, in Yuba County, CA. This notice replaces the one previously published in the Federal Register on March 17, 2004 (69 FR 12646). The general reevaluation is needed because recent technical, environmental, and economic studies have indicated that additional refinement and reformulation are needed to determine the feasibility and extent of Federal and non-Federal interest in the project. The basic study authority for the Yuba River Basin study was provided under the Flood Control Act of 1962.
Notice of Availability (NOA) for the Supplemental Final Environmental Impact Statement (SFEIS) for the Proposed Addition of Maneuver Training Land at Fort Irwin, CA
This announces the availability of the SFEIS for the Proposed Addition of Maneuver Training Land at Fort Irwin. The SFEIS assesses the potential environmental impacts of the addition of maneuver lands to supplement the current training corridors at the National Training Center at Fort Irwin in the Mojave Desert of California by approximately 118,674 acres. The proposed expanded maneuver training will improve necessary field training by providing a more realistic battle corridor. The cooperating agencies for this project are: Bureau of Land Management (as the administrator of the vast majority of the lands within the study area), the National Aeronautics and Space Administration (as a tenant on Fort Irwin), and the Federal Aviation Administration (as some of the alternatives involve possible changes to airspace).
Board of Visitors, United States Military Academy (USMA)
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting: Name of Committee: Board of Visitors, United States Military Academy. Date: Wednesday, February 8, 2006. Place of Meeting: Veterans Affairs Conference room, Room 418, Senate Russell Building, Washington, DC 20510. Start Time of Meeting: Approximately 9 a.m.
Availability of the Draft Supplemental Environmental Impact Statement for the Boston Harbor Inner Harbor Maintenance Dredging Project
The U.S. Army Corps of Engineers, New England District, has prepared a Draft Supplemental Environmental Impact Statement and State Notice of Project Change (DSEIS/NPC) to maintenance dredge the following Federal navigation channels: the Main Ship Channel upstream of Spectacle Island to the Inner Confluence, the upper Reserved Channel, the approach to the Navy Dry Dock, and a portion of the Chelsea River (previously permitted) in Boston Harbor, MA. Maintenance dredging of the navigation channels landward of Spectacle Island is needed to remove shoals and restore the Federal navigation channels to their authorized depths. Materials dredged from the Federal channels will either be disposed of at the Massachusetts Bay Disposal Site (if the material is suitable for unconfined open water disposal) or, if the material is not suitable for unconfined open water disposal, in confined aquatic disposal (CAD) cell(s). Major navigation channel improvements (deepening) were made in 1999 through 2001 in the Reserved Channel, the Mystic River, Inner Confluence and the Chelsea River. A final EIS was prepared for this previous navigation improvement project in June of 1995 in which the use of CAD cells in the Mystic River, Inner Confluence, and Chelsea River were investigated. A CAD cell for the proposed maintenance project will be constructed in the Mystic River and in the Main Ship Channel just below the Inner Confluence.
Intent To Prepare a Draft Environmental Impact Statement/Environmental Impact Report (DEIS/EIR) for the Westminster Watershed Study, Orange County, CA
The purpose of this study is to evaluate the Westminster watershed ecosystem and look for multipurpose recommendations for how to more effectively manage its natural resources. There is a need for both flood control improvements as well as ecosystem habitat restoration. The study area is located in western Orange County, CA, approximately 25 miles southeast of the City of Los Angeles. The Westminster watershed lies on a flat coastal plain, is approximately 90 square miles in area, and is almost entirely urbanized with residential and commercial development. There are two main channel systems that collect runoff from portions of urbanized areas in the cities of Anaheim, Stanton, Cypress, Orange, Santa Ana, Garden Grove, Westminster, Fountain Valley, Los Alamitos, Seal Beach, and Huntington Beach. The East Garden Grove-Wintersburg Channel (EGGW), with its principal tributary, the Ocean View Channel (OV), drains into Bolsa Bay. Two retarding basins (Haster and West Street) exist at the upstream reach of the EGGW channel. Bolsa Bay includes the Bolsa Chica Lowlands and Ecological Reserve, and is a major environmental resource in southern California. The Bay has been designated as an area of national significance, and is host to a wide assemblage of resident and migratory waterfowl and marine species including over 30 Federal and/or State listed sensitive species that utilize the wetlands during all or part of their annual cycle. The Bolsa Chica Flood Control Channel (BCFC), with its principal tributaries, the Anaheim-Barber City Channel and Westminster Channel, drains to Huntington Harbour. The BCFC Channel drains the western portion of the study area, with a significant portion of property adjacent to the Seal Beach Naval Weapons Station of the U.S. Navy and 1.5 miles runs through and adjacent to the Los Alamitos Armed Forces Training Base. Aside from the military facilities, this portion of the watershed is almost entirely urbanized. Agriculture is still practiced under leases granted by the Navy on portions of their property. The BCFC Channel outlets into Huntington Harbour, but unlike EGGW, does not outlet into Bolsa Bay. The sole ocean outlet for both Bolsa Bay and Huntington Harbour is to the north at Anaheim Bay and the Seal Beach National Wildlife Refuge. Tidal influence in the lowermost portion of the BCFC and East Garden Grove-Wintersburg Channels extended approximately 2 miles inland.
Proposed Collection; Comment Request
In compliance with Section 3506(c)(2)(A) of the Paperwork Reduction Act of 1995, the Department of the Army announces a proposed public information collection and seeks public comment on the provisions thereof. Comments are invited on: (a) Whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed information collection; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the information collection on respondents, including through the use of automated collection techniques or other forms of information technology.
Reserve Officers' Training Corps (ROTC) Program Subcommittee
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (5 U.S.C., App. 2), announcement is made of the following Committee meeting: Name of Committee: Reserve Officers' Training Corps (ROTC) Program Subcommittee. Dates of Meeting: January 24-25, 2006. Location: Radisson Hotel Hampton, 700 Settlers Landing Road, Hampton, VA 23669. Time: 0800-1700 hours, January 24, 2006; 0800-1030 hours, January 25, 2006. Proposed Agenda: Review and discuss the Junior and Senior Reserve Officers' Training Corps programs; incentive-based scholarships initiatives; academic accreditation agencies and procedures; curriculum review, revision and validation; and the growth of Military Science and Leadership as a college minor.
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of U.S. Provisional Patent Application Concerning Method of Prophylactically Treating Organophosphate Poisoning
In accordance with 37 CFR 404.6 and 404.7, announcement is made of the availability for licensing of the invention set forth in U.S. Provisional Patent Application Serial No. 60/613,121 entitled ``Method of Prophylactically Treating Organophosphate Poisoning,'' filed September 24, 2004. Foreign rights are also available. The United States Government, as represented by the Secretary of the Army, has rights in this invention.
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of U.S. Provisional Patent Application Concerning Composition for Treating Sulfur Mustard Toxicity and Methods of Using Same
In accordance with 37 CFR 404.6 and 404.7, announcement is made of the availability for licensing of the invention set forth in U.S. Provisional Patent Application Serial No. 60/632,834 entitled ``Composition for Treating Sulfur Mustard Toxicity and Methods of Using Same,'' filed December 3, 2004. Foreign rights are also available. The United States Government, as represented by the Secretary of the Army, has rights in this invention.
Intent To Grant an Exclusive License of a U.S. Government-Owned Patent
In accordance with 35 U.S.C. 209 and 37 CFR 404.7(a)(1)(i), announcement is made of the intent to grant an exclusive, royalty- bearing, revocable license within the geographic area of the United States of America and its territories and possessions to U.S. Patent 6,669,481, issued December 30, 2003 entitled ``Neurocognitive Assessment Apparatus And Method;'' Continuation-in-part U.S. Patent Application 10/614,758, filed July 8, 2003 entitled ``Automated Neurological Assessment Metrics (Anam);'' U.S. Provisional Patent Application 60/289,125, filed May 8, 2001 entitled ``Automated Neurological Assessment Metrics;'' U.S. Provisional Patent Application 60/663,765, filed March 22, 2005 entitled ``System, Method, And Computer Program Product For An Automated Neuropsychological Test;'' U.S. Patent Application 10/340,473, filed December 27, 2002, to The University of Oklahoma with its principal place of business at 350 David L. Boren Boulevard, Suite 1510, Norman, Oklahoma 73072-7264.
Availability of Non-Exclusive License or Partially Exclusive Licensing of U.S. Patent Concerning Method and Apparatus for Making Body Heating and Cooling Garments
In accordance with 37 CFR 404.6, annopuncement is made of the availability for licensing of U.S. Patent No. US 6,979,382 entitled ``Method and apparatus for making body heating and cooling garments'' issued December 27, 2005. This patent has been assigned to the United States Government as represented by the Secretary of the Army.
Availability of Non-Exclusive, Exclusive License or Partially Exclusive Licensing of U.S. Patent Concerning Article of Footwear With Temperature Regulation Means
In accordance with 37 CFR 404.6, announcement is made of the availability for licensing of U.S. Patent No. US 6,981,339 entitled ``Article of Footwear with Temperature Regulation Means'' issued January 3, 2006. This patent has been assigned to the United States Government as represented by the Secretary of the Army.
Availability of Non-Exclusive, Exclusive License or Partially Exclusive Licensing of U.S. Patent Concerning Projectile Launch Assembly and Method
In accordance with 37 CFR 404.6, announcement is made of the availability for licensing of U.S. Patent No. US 6,981,449 entitled ``Projectile Launch Assembly and Method'' issued January 3, 2006. This patent has been assigned to the United States Government as represented by the Secretary of the Army.
Notice of Intent To Prepare an Integrated Environmental Impact Statement/Environmental Impact Report/Feasibility Report for the South San Francisco Bay Shoreline Study: Alviso Ponds and Santa Clara County Interim Feasibility Study
Pursuant to the National Environmental Policy Act (NEPA) of 1969, as amended, the U.S. Army Corps of Engineers (Corps) and the U.S. Fish and Wildlife Service (USFWS) intend to prepare a joint project- level integrated Environmental Impact Statement (EIS)/Environmental Impact Report (EIR)/Feasibility Report, hereafter called the Report, to address the potential impacts of the first Interim Feasibility Study component of the South San Francisco Bay Shoreline Study, San Francisco Bay, CA. This study is closely interrelated with the ongoing South Bay Salt Ponds Restoration Project, discussed in the Notice of Intent dated November 9, 2004. It will function as a project-level EIS/EIR tiered under that programmatic EIS/EIR and will be issued subsequently to the programmatic document. The California State Coastal Conservancy (Conservancy) will be the lead agency under the California Environmental Quality Act (CEQA). Federal Lead Agencies Proposed Actions and Related Programmatic EIS/EIR. The Corps, in cooperation with the USFWS, is proposing to study flood protection and ecosystem restoration for the Alviso portion of the South San Francisco Bay (South Bay) Salt Ponds and adjacent areas to determine whether there is a federal interest in constructing a project with flood protection and/or ecosystem restoration components in this area, and if so, to determine the optimum project to recommend to Congress for authorization. The Report will recommend a plan which will provide for long-term restoration for these salt ponds and adjacent areas as well as flood protection and recreation components, if these actions are justified under Federal criteria. The Report and its alternatives will be tiered to the programmatic EIS/EIR for the South Bay Salt Ponds Restoration Project. One public scoping meeting will be held to solicit comments on the environmental effects of the range of potential projects and the appropriate scope of the Report. The public is invited to comment during this meeting on environmental issues to be addressed in the Report.
Notice of Intent To Prepare an Environmental Impact Statement and Conduct Public Scoping Meetings for the Fishtrap Lake Road Project, Fishtrap Lake, Pike County, KY
Pursuant to the National Environmental Policy Act (NEPA), the Huntington District, U.S. Army Corps of Engineers, DoD, will prepare an Environmental Impact Statement (EIS). The EIS will evaluate potential direct, indirect and cumulative impacts to the natural, physical, and human environment resulting from construction of one or more roads proposed to serve recreational development and community access needs at the Fishtrap Lake Project near Millard, Pike County, KY.
Final Environmental Impact Statement To Fully Integrate the Overhills Property Into the Fort Bragg Training Program, Fort Bragg, NC
The Department of the Army announces the availability of the Final Environmental Impact Statement (FEIS) to full integrate the Overhills property into the Fort Bragg Training Program, Fort Bragg, Cumberland and Harnett Counties, NC. Presently, realistic training in Fort Bragg's Northern Training Area (NTA), one of Fort Bragg's largest training areas, is hampered by the two sets of training rules that govern training in the units. Though no physical barriers separate the Overhills training units, NTA V-VIII, from NTA units I-IV, the Overhills Standard Operating Procedures (SOP) limits the number of personnel and types of activities during training exercises, effectively creating a training barrier. Applying the same training regulation to the Overhills that governs training on the rest of the installation would allow Fort Bragg to full incorporate the Overhills into the installation's training program, and maximize training possibilities throughout the NTA.
Intent To Prepare a Draft Environmental Impact Statement/Environmental Impact Report for a Permit Application for a Proposed Marine Terminal Expansion at Piers D, E and F in the Middle Harbor District of the Port of Long Beach, Los Angeles County, CA
The U.S. Army Corps of Engineers (Corps) is considering an application for Section 404 and Section 10 permits to conduct dredge and fill activities to redevelop and consolidate two existing container terminals for the construction of a 342-acre marine terminal including redevelopment of 294 acres of existing land and the placement of dredged material in open water to create 48 acres of new land. The primary reason for the revised notice of intent is because the proposed terminal expansion project has been modified to utilize additional existing land to reduce the amount of fill in open water by approximately 20 acres. The primary Federal concern is the dredging and discharging of materials within waters of the Unites States and potential significant impacts to the human environment. Therefore, in accordance with the National Environmental Policy Act (NEPA), the Corps is requiring the preparation of an Environmental Impact Statement (EIS) prior to consideration of any permit action. The Corps may ultimately make a determination to permit or deny the above project, or permit or deny modified versions of the above project. Pursuant to the California Environmental Quality Act (CEQA), the Port of Long Beach will serve as Lead Agency for the preparation of an Environmental Impact Report (EIR) for its consideration of development approvals within its jurisdiction. The Corps and the Port of Long Beach have agreed to jointly prepare a Draft EIS/EIR in order to optimize efficiency and avoid duplication. The Draft EIS/EIR is intended to be sufficient in scope to address both the Federal and the State and local requirements and environmental issues concerning the proposed activities and permit approvals.
Notice of Availability of the Draft Environmental Impact Statement for the Prado Basin Master Plan, San Bernardino and Riverside Counties, CA
The Environmental Impact Statement (EIS) addresses potential environmental impacts associated with the proposed Prado Basin Master Plan, and identifies recommended measures to reduce such impacts. The Prado Basin Master Plan proposes a range of recreation uses and features for identified planning areas with the Basin. Specific site plans and layouts for these proposed uses would be prepared when future specific development plans are proposed. The impact discussion, in turn, is purposely general in nature, and recommended measures to reduce impacts allow for flexibility. The potential impacts as stated and the commitment to minimize impacts are intended to provide a framework for future proposals. They also provide some guidelines for impacts that will require mitigation; short of making untimely, detailed, recommendations. This approach allows future recreation development sponsors the appropriate flexibility to design and formulate specific mitigation, including the parties responsible for implementation and verification, when details of specific Master Plan development proposals are presented. The U.S. Army Corps of Engineers has cooperated with counterparts in Orange, San Bernardino and Riverside Counties in Developing this Master Plan. Two alternatives are proposed for consideration for the Prado Basin: Adopting the proposed Prado Basin Master Plan, and the No Project alternative. The proposed plan would serve as a guide for orderly and coordinated use, development and management of the land in the Prado Basin. The discussion of affected environment and potential environmental impacts in this Environmental Impact Statement (EIS) are based on evaluation of land use designations proposed in the Basin Master Plan. Specific development proposals within the general land use Planning Areas would require appropriate National Environmental Policy act (NEPA) clearance to specifically address the potential environmental effects of those proposals. The No Project Alternative would eliminate the implementation of the recreation land use contemplated in the proposed Basin Master Plan, and in the continuation of current land use activities on the site. This alternative would result in the Corps being unable to meet its project objectives such as providing for the expressed public interests for recreation.
Upper Columbia Alternative Flood Control and Fish Operations, Libby and Hungry Horse Dams, MT
On November 10, 2005, the Corps of Engineers and the Bureau of Reclamation, Interior, issued a Notice of Availability of a Draft Environmental Impact Statement (DEIS) and Notice of Public Hearings (see 70 CFR 68409). The due date for comments period provided in the DATES section of that notice was incorrectly identified as December 27, 2005. The correct due date for comments is January 3, 2006 (45 days from the November 18, 2005, Federal Register publication date of the EPA weekly notice of DEIS availability).
Notice of Intent To Grant Exclusive Patent License; Martin Marietta Composites, Inc.
In compliance with 37 CFR 404 et seq., the Department of the Army hereby gives notice of its intent to grant to Martin Marietta Composites, Inc., a corporation having its principle place of business at 2700 Wycliff Road, Raleigh, NC 27622-0013, exclusive license to practice in the United States, the Government-owned invention described in US Patent 6,586,054 issued July 1, 2003 entitled, ``Apparatus and method for selectively distributing and controlling a means for impregnation of fibrous articles''.
Notice of Intent To Grant Exclusive Patent License to Akoura Biometrics, Inc.
In compliance with 37 CFR 404 et seq., the Department of the Army hereby gives notice of its intent to grant to Akoura Biometrics Incorporated, a corporation having its principle place of business at 9990 Waterford Trail Chagrin Falls, OH 44023, an exclusive or partially exclusive license relative to ARL patents U.S. Patent 6,557,103 B1 entitled, ``Spread Spectrum Steganography''; April 29, 2003, Boncelet, Jr., et al. and U.S. Patent 6,831,990 B2 entitled, ``System and Method for Image Tamper Detection via Thumbnail Hiding''; December 14, 2004; Marvel et al.
Law Enforcement Reporting
The Department of the Army proposes to amend its regulation concerning law enforcement reporting, to implement portions of section 577(b)(5) of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005, October 28, 2004, Pub. L. 108-375, pertaining to reporting of sexual assaults. This revision also implements Department of Defense policy concerning sexual assault.