Engineers Corps June 13, 2011 – Federal Register Recent Federal Regulation Documents

Notice of Availability of a Final General Conformity Determination and Record of Decision for the San Pedro Waterfront Project, Port of Los Angeles, Los Angeles County, CA
Document Number: 2011-14587
Type: Notice
Date: 2011-06-13
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In September 2009, the Los Angeles District of the U.S. Army Corps of Engineers (Corps) and the Los Angeles Harbor Department published a joint final Environmental Impact Statement/Environmental Impact Report (EIS/EIR), including the Corps' draft general conformity determination (Section 3.2 and Appendix D.7), for the Federal action associated with the San Pedro Waterfront Project (Project) in the Port of Los Angeles, Los Angeles County, California. Comments were received on the final EIS/EIR and included draft general conformity determination until October 29, 2009. A general conformity determination was necessary because Project construction would require Federal action (i.e., issuance of a Corps permit for work and structures in and over navigable waters, discharges of fill into waters of the U.S., and transport and disposal of dredged material in ocean waters) and not all the Federal action's direct and indirect emissions would be below specified de minimis thresholds (40 CFR 93.153(b)). On May 9, 2011 and May 11, 2011, the Corps made a final general conformity determination and completed its environmental review and executed the Record of Decision (ROD), respectively, for the Federal action associated with the Project. The Corps considered and responded to all comments received in making the final general conformity determination and executing the ROD. The public can request copies of the final general conformity determination document or the ROD from the Corps at the address listed below, or can view or download the final general conformity determination document from the Corps' Web site (https:// www.spl.usace.army.mil/regulatory/POLA.htm, scroll down to the link under San Pedro Waterfront [formerly Bridge to Breakwater]) or the Port of Los Angeles' Web site (https://www.portoflosangeles.org/environment/ public_notices.asp, scroll down to link under San Pedro Waterfront Project). In addition, copies of the final general conformity document are available for review during the next 30 days at the following libraries: L.A. Public Library, Central Branch, 630 West 5th Street, Los Angeles California; L.A. Public Library, San Pedro Branch, 931 South Gaffey Street, San Pedro, California; and L.A. Public Library, Wilmington Branch, 1300 North Avalon, Wilmington, California.
Intent To Prepare a Draft Environmental Impact Statement for the Proposed Kennecott Utah Copper LLC Tailings Expansion Project, Near Magna, Salt Lake County, UT, Permit Application Number SPK-2009-1213
Document Number: 2011-14560
Type: Notice
Date: 2011-06-13
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, Sacramento District (Corps), will prepare an Environmental Impact Statement (EIS) for the proposed Kennecott Utah Copper Tailings Expansion Project, an expansion of an active commercial mining operation near Magna, Salt Lake County, UT. Kennecott Utah Copper LLC (KUC) has applied for a Department of the Army (DA) permit to fill approximately 721 acres of waters of the United States, including wetlands, to construct the project. The basic project purpose is surface mining. The overall project purpose is to increase tailings storage capacity for future mine life extensions.