Notice of Availability of a Final General Conformity Determination and Record of Decision for the San Pedro Waterfront Project, Port of Los Angeles, Los Angeles County, CA, 34212 [2011-14587]
Download as PDF
34212
Federal Register / Vol. 76, No. 113 / Monday, June 13, 2011 / Notices
Dated: June 2, 2011.
Andrew B. Kiger,
Lieutenant Colonel, U.S. Army, District
Engineer.
[FR Doc. 2011–14560 Filed 6–10–11; 8:45 am]
BILLING CODE 3720–58–P
DEPARTMENT OF DEFENSE
Department of the Army, Corps of
Engineers
Notice of Availability of a Final General
Conformity Determination and Record
of Decision for the San Pedro
Waterfront Project, Port of Los
Angeles, Los Angeles County, CA
Department of the Army—U.S.
Army Corps of Engineers, DoD.
ACTION: Notice of availability.
AGENCY:
In September 2009, the Los
Angeles District of the U.S. Army Corps
of Engineers (Corps) and the Los
Angeles Harbor Department published a
joint final Environmental Impact
Statement/Environmental Impact Report
(EIS/EIR), including the Corps’ draft
general conformity determination
(Section 3.2 and Appendix D.7), for the
Federal action associated with the San
Pedro Waterfront Project (Project) in the
Port of Los Angeles, Los Angeles
County, California. Comments were
received on the final EIS/EIR and
included draft general conformity
determination until October 29, 2009. A
general conformity determination was
necessary because Project construction
would require Federal action (i.e.,
issuance of a Corps permit for work and
structures in and over navigable waters,
discharges of fill into waters of the U.S.,
and transport and disposal of dredged
material in ocean waters) and not all the
Federal action’s direct and indirect
emissions would be below specified de
minimis thresholds (40 CFR 93.153(b)).
On May 9, 2011 and May 11, 2011, the
Corps made a final general conformity
determination and completed its
environmental review and executed the
Record of Decision (ROD), respectively,
for the Federal action associated with
the Project. The Corps considered and
responded to all comments received in
making the final general conformity
determination and executing the ROD.
The public can request copies of the
final general conformity determination
document or the ROD from the Corps at
the address listed below, or can view or
download the final general conformity
determination document from the
Corps’ Web site (https://
www.spl.usace.army.mil/regulatory/
POLA.htm, scroll down to the link
under San Pedro Waterfront [formerly
emcdonald on DSK2BSOYB1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
16:06 Jun 10, 2011
Jkt 223001
Bridge to Breakwater]) or the Port of Los
Angeles’ Web site (https://
www.portoflosangeles.org/environment/
public_notices.asp, scroll down to link
under San Pedro Waterfront Project). In
addition, copies of the final general
conformity document are available for
review during the next 30 days at the
following libraries: L.A. Public Library,
Central Branch, 630 West 5th Street, Los
Angeles California; L.A. Public Library,
San Pedro Branch, 931 South Gaffey
Street, San Pedro, California; and L.A.
Public Library, Wilmington Branch,
1300 North Avalon, Wilmington,
California.
FOR FURTHER INFORMATION CONTACT:
Questions or comments concerning the
final general conformity determination
or the ROD should be directed to Dr.
Spencer D. MacNeil, Chief of the
Transportation and Special Projects
Branch, Regulatory Division, U.S. Army
Corps of Engineers, 2151 Alessandro
Drive, Suite 110, Ventura, California
93001, (805) 585–2152.
SUPPLEMENTARY INFORMATION: None
country with which the United States
currently has, or in the future may enter
into, a free trade agreement (FTA)
requiring national treatment for trade in
natural gas; 2 and (2) any country with
which the United States does not have
an FTA requiring national treatment for
trade in natural gas with which trade is
not prohibited by United States law or
policy. The Application was filed under
Section 3 of the Natural Gas Act, as
amended by section 201 of the Energy
Policy Act of 1992 (NGA). Protests,
motions to intervene, notices of
intervention, and written comments are
invited.
DATES: Protests, motions to intervene or
notices of intervention, as applicable,
requests for additional procedures, and
written comments are to be filed using
procedures detailed in the Public
Comment Procedures section of this
notice no later than 4:30 p.m., eastern
time, August 12, 2011.
ADDRESSES:
Dated: June 3, 2011.
David J. Castanon,
Chief, Regulatory Division, Los Angeles
District.
E-mail: fergas@hq.doe.gov.
[FR Doc. 2011–14587 Filed 6–10–11; 8:45 am]
BILLING CODE 3710–58–P
DEPARTMENT OF ENERGY
Lake Charles Exports, LLC;
Application for Long-Term
Authorization To Export Liquefied
Natural Gas
Office of Fossil Energy, DOE.
Notice of application.
AGENCY:
The Office of Fossil Energy
(FE) of the Department of Energy (DOE)
gives notice of receipt of an application
(Application), filed on May 6, 2011, and
amended on May 26, 2011, by Lake
Charles Exports, LLC (LCE), requesting
long-term, multi-contract authorization
to export up to 15 million metric tons
per annum (mmtpa) of domestic natural
gas as liquefied natural gas (LNG) for a
25-year period, commencing the earlier
of the date of first export or ten years
from the date of issuance of the
requested authorization. LCE seeks
authorization to export LNG from the
terminal in Lake Charles, Louisiana
(‘‘Lake Charles Terminal’’) 1 to: (1) Any
SUMMARY:
1 The
Lake Charles Terminal is an existing LNG
import facility located in Cameron Parish,
Louisiana, that is owned by Trunkline LNG
Company, LLC (Trunkline LNG), a wholly-owned
subsidiary of Southern Union Company.
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
Regular Mail
U.S. Department of Energy (FE–34),
Office of Natural Gas Regulatory
Activities, Office of Fossil Energy,
P.O. Box 44375, Washington, DC
20026–4375.
Hand Delivery or Private Delivery
Services (e.g., FedEx, UPS, etc.)
[FE Docket No. 11–59–LNG]
ACTION:
Electronic Filing
U.S. Department of Energy (FE–34),
Office of Natural Gas Regulatory
Activities, Office of Fossil Energy,
Forrestal Building, Room 3E–042,
1000 Independence Avenue, SW.,
Washington, DC 20585.
FOR FURTHER INFORMATION CONTACT:
Larine Moore or Lisa Tracy, U.S.
Department of Energy (FE–34), Office
of Oil and Gas Global Security and
Supply, Office of Fossil Energy,
Forrestal Building, Room 3E–042,
1000 Independence Avenue, SW.,
Washington, DC 20585, (202) 586–
9478; (202) 586–4523.
Edward Myers, U.S. Department of
Energy, Office of the Assistant
General Counsel for Electricity and
Fossil Energy, Forrestal Building,
Room 6B–256, 1000 Independence
Avenue, SW., Washington, DC 20585,
(202) 586–3397.
SUPPLEMENTARY INFORMATION:
2 The United States currently has FTAs requiring
national treatment for trade in natural gas with
Australia, Bahrain, Canada, Chile, Dominican
Republic, El Salvador, Guatemala, Honduras,
Jordan, Nicaragua, Mexico, Morocco, Oman, Peru,
and Singapore.
E:\FR\FM\13JNN1.SGM
13JNN1
Agencies
[Federal Register Volume 76, Number 113 (Monday, June 13, 2011)]
[Notices]
[Page 34212]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-14587]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers
Notice of Availability of a Final General Conformity
Determination and Record of Decision for the San Pedro Waterfront
Project, Port of Los Angeles, Los Angeles County, CA
AGENCY: Department of the Army--U.S. Army Corps of Engineers, DoD.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: In September 2009, the Los Angeles District of the U.S. Army
Corps of Engineers (Corps) and the Los Angeles Harbor Department
published a joint final Environmental Impact Statement/Environmental
Impact Report (EIS/EIR), including the Corps' draft general conformity
determination (Section 3.2 and Appendix D.7), for the Federal action
associated with the San Pedro Waterfront Project (Project) in the Port
of Los Angeles, Los Angeles County, California. Comments were received
on the final EIS/EIR and included draft general conformity
determination until October 29, 2009. A general conformity
determination was necessary because Project construction would require
Federal action (i.e., issuance of a Corps permit for work and
structures in and over navigable waters, discharges of fill into waters
of the U.S., and transport and disposal of dredged material in ocean
waters) and not all the Federal action's direct and indirect emissions
would be below specified de minimis thresholds (40 CFR 93.153(b)). On
May 9, 2011 and May 11, 2011, the Corps made a final general conformity
determination and completed its environmental review and executed the
Record of Decision (ROD), respectively, for the Federal action
associated with the Project. The Corps considered and responded to all
comments received in making the final general conformity determination
and executing the ROD.
The public can request copies of the final general conformity
determination document or the ROD from the Corps at the address listed
below, or can view or download the final general conformity
determination document from the Corps' Web site (https://www.spl.usace.army.mil/regulatory/POLA.htm, scroll down to the link
under San Pedro Waterfront [formerly Bridge to Breakwater]) or the Port
of Los Angeles' Web site (https://www.portoflosangeles.org/environment/public_notices.asp, scroll down to link under San Pedro Waterfront
Project). In addition, copies of the final general conformity document
are available for review during the next 30 days at the following
libraries: L.A. Public Library, Central Branch, 630 West 5th Street,
Los Angeles California; L.A. Public Library, San Pedro Branch, 931
South Gaffey Street, San Pedro, California; and L.A. Public Library,
Wilmington Branch, 1300 North Avalon, Wilmington, California.
FOR FURTHER INFORMATION CONTACT: Questions or comments concerning the
final general conformity determination or the ROD should be directed to
Dr. Spencer D. MacNeil, Chief of the Transportation and Special
Projects Branch, Regulatory Division, U.S. Army Corps of Engineers,
2151 Alessandro Drive, Suite 110, Ventura, California 93001, (805) 585-
2152.
SUPPLEMENTARY INFORMATION: None
Dated: June 3, 2011.
David J. Castanon,
Chief, Regulatory Division, Los Angeles District.
[FR Doc. 2011-14587 Filed 6-10-11; 8:45 am]
BILLING CODE 3710-58-P