Notice of Availability of a Final General Conformity Determination and Record of Decision for the San Pedro Waterfront Project, Port of Los Angeles, Los Angeles County, CA, 34212 [2011-14587]

Download as PDF 34212 Federal Register / Vol. 76, No. 113 / Monday, June 13, 2011 / Notices Dated: June 2, 2011. Andrew B. Kiger, Lieutenant Colonel, U.S. Army, District Engineer. [FR Doc. 2011–14560 Filed 6–10–11; 8:45 am] BILLING CODE 3720–58–P DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Notice of Availability of a Final General Conformity Determination and Record of Decision for the San Pedro Waterfront Project, Port of Los Angeles, Los Angeles County, CA Department of the Army—U.S. Army Corps of Engineers, DoD. ACTION: Notice of availability. AGENCY: In September 2009, the Los Angeles District of the U.S. Army Corps of Engineers (Corps) and the Los Angeles Harbor Department published a joint final Environmental Impact Statement/Environmental Impact Report (EIS/EIR), including the Corps’ draft general conformity determination (Section 3.2 and Appendix D.7), for the Federal action associated with the San Pedro Waterfront Project (Project) in the Port of Los Angeles, Los Angeles County, California. Comments were received on the final EIS/EIR and included draft general conformity determination until October 29, 2009. A general conformity determination was necessary because Project construction would require Federal action (i.e., issuance of a Corps permit for work and structures in and over navigable waters, discharges of fill into waters of the U.S., and transport and disposal of dredged material in ocean waters) and not all the Federal action’s direct and indirect emissions would be below specified de minimis thresholds (40 CFR 93.153(b)). On May 9, 2011 and May 11, 2011, the Corps made a final general conformity determination and completed its environmental review and executed the Record of Decision (ROD), respectively, for the Federal action associated with the Project. The Corps considered and responded to all comments received in making the final general conformity determination and executing the ROD. The public can request copies of the final general conformity determination document or the ROD from the Corps at the address listed below, or can view or download the final general conformity determination document from the Corps’ Web site (https:// www.spl.usace.army.mil/regulatory/ POLA.htm, scroll down to the link under San Pedro Waterfront [formerly emcdonald on DSK2BSOYB1PROD with NOTICES SUMMARY: VerDate Mar<15>2010 16:06 Jun 10, 2011 Jkt 223001 Bridge to Breakwater]) or the Port of Los Angeles’ Web site (https:// www.portoflosangeles.org/environment/ public_notices.asp, scroll down to link under San Pedro Waterfront Project). In addition, copies of the final general conformity document are available for review during the next 30 days at the following libraries: L.A. Public Library, Central Branch, 630 West 5th Street, Los Angeles California; L.A. Public Library, San Pedro Branch, 931 South Gaffey Street, San Pedro, California; and L.A. Public Library, Wilmington Branch, 1300 North Avalon, Wilmington, California. FOR FURTHER INFORMATION CONTACT: Questions or comments concerning the final general conformity determination or the ROD should be directed to Dr. Spencer D. MacNeil, Chief of the Transportation and Special Projects Branch, Regulatory Division, U.S. Army Corps of Engineers, 2151 Alessandro Drive, Suite 110, Ventura, California 93001, (805) 585–2152. SUPPLEMENTARY INFORMATION: None country with which the United States currently has, or in the future may enter into, a free trade agreement (FTA) requiring national treatment for trade in natural gas; 2 and (2) any country with which the United States does not have an FTA requiring national treatment for trade in natural gas with which trade is not prohibited by United States law or policy. The Application was filed under Section 3 of the Natural Gas Act, as amended by section 201 of the Energy Policy Act of 1992 (NGA). Protests, motions to intervene, notices of intervention, and written comments are invited. DATES: Protests, motions to intervene or notices of intervention, as applicable, requests for additional procedures, and written comments are to be filed using procedures detailed in the Public Comment Procedures section of this notice no later than 4:30 p.m., eastern time, August 12, 2011. ADDRESSES: Dated: June 3, 2011. David J. Castanon, Chief, Regulatory Division, Los Angeles District. E-mail: fergas@hq.doe.gov. [FR Doc. 2011–14587 Filed 6–10–11; 8:45 am] BILLING CODE 3710–58–P DEPARTMENT OF ENERGY Lake Charles Exports, LLC; Application for Long-Term Authorization To Export Liquefied Natural Gas Office of Fossil Energy, DOE. Notice of application. AGENCY: The Office of Fossil Energy (FE) of the Department of Energy (DOE) gives notice of receipt of an application (Application), filed on May 6, 2011, and amended on May 26, 2011, by Lake Charles Exports, LLC (LCE), requesting long-term, multi-contract authorization to export up to 15 million metric tons per annum (mmtpa) of domestic natural gas as liquefied natural gas (LNG) for a 25-year period, commencing the earlier of the date of first export or ten years from the date of issuance of the requested authorization. LCE seeks authorization to export LNG from the terminal in Lake Charles, Louisiana (‘‘Lake Charles Terminal’’) 1 to: (1) Any SUMMARY: 1 The Lake Charles Terminal is an existing LNG import facility located in Cameron Parish, Louisiana, that is owned by Trunkline LNG Company, LLC (Trunkline LNG), a wholly-owned subsidiary of Southern Union Company. PO 00000 Frm 00010 Fmt 4703 Sfmt 4703 Regular Mail U.S. Department of Energy (FE–34), Office of Natural Gas Regulatory Activities, Office of Fossil Energy, P.O. Box 44375, Washington, DC 20026–4375. Hand Delivery or Private Delivery Services (e.g., FedEx, UPS, etc.) [FE Docket No. 11–59–LNG] ACTION: Electronic Filing U.S. Department of Energy (FE–34), Office of Natural Gas Regulatory Activities, Office of Fossil Energy, Forrestal Building, Room 3E–042, 1000 Independence Avenue, SW., Washington, DC 20585. FOR FURTHER INFORMATION CONTACT: Larine Moore or Lisa Tracy, U.S. Department of Energy (FE–34), Office of Oil and Gas Global Security and Supply, Office of Fossil Energy, Forrestal Building, Room 3E–042, 1000 Independence Avenue, SW., Washington, DC 20585, (202) 586– 9478; (202) 586–4523. Edward Myers, U.S. Department of Energy, Office of the Assistant General Counsel for Electricity and Fossil Energy, Forrestal Building, Room 6B–256, 1000 Independence Avenue, SW., Washington, DC 20585, (202) 586–3397. SUPPLEMENTARY INFORMATION: 2 The United States currently has FTAs requiring national treatment for trade in natural gas with Australia, Bahrain, Canada, Chile, Dominican Republic, El Salvador, Guatemala, Honduras, Jordan, Nicaragua, Mexico, Morocco, Oman, Peru, and Singapore. E:\FR\FM\13JNN1.SGM 13JNN1

Agencies

[Federal Register Volume 76, Number 113 (Monday, June 13, 2011)]
[Notices]
[Page 34212]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-14587]


-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Army, Corps of Engineers


Notice of Availability of a Final General Conformity 
Determination and Record of Decision for the San Pedro Waterfront 
Project, Port of Los Angeles, Los Angeles County, CA

AGENCY: Department of the Army--U.S. Army Corps of Engineers, DoD.

ACTION: Notice of availability.

-----------------------------------------------------------------------

SUMMARY: In September 2009, the Los Angeles District of the U.S. Army 
Corps of Engineers (Corps) and the Los Angeles Harbor Department 
published a joint final Environmental Impact Statement/Environmental 
Impact Report (EIS/EIR), including the Corps' draft general conformity 
determination (Section 3.2 and Appendix D.7), for the Federal action 
associated with the San Pedro Waterfront Project (Project) in the Port 
of Los Angeles, Los Angeles County, California. Comments were received 
on the final EIS/EIR and included draft general conformity 
determination until October 29, 2009. A general conformity 
determination was necessary because Project construction would require 
Federal action (i.e., issuance of a Corps permit for work and 
structures in and over navigable waters, discharges of fill into waters 
of the U.S., and transport and disposal of dredged material in ocean 
waters) and not all the Federal action's direct and indirect emissions 
would be below specified de minimis thresholds (40 CFR 93.153(b)). On 
May 9, 2011 and May 11, 2011, the Corps made a final general conformity 
determination and completed its environmental review and executed the 
Record of Decision (ROD), respectively, for the Federal action 
associated with the Project. The Corps considered and responded to all 
comments received in making the final general conformity determination 
and executing the ROD.
    The public can request copies of the final general conformity 
determination document or the ROD from the Corps at the address listed 
below, or can view or download the final general conformity 
determination document from the Corps' Web site (https://www.spl.usace.army.mil/regulatory/POLA.htm, scroll down to the link 
under San Pedro Waterfront [formerly Bridge to Breakwater]) or the Port 
of Los Angeles' Web site (https://www.portoflosangeles.org/environment/public_notices.asp, scroll down to link under San Pedro Waterfront 
Project). In addition, copies of the final general conformity document 
are available for review during the next 30 days at the following 
libraries: L.A. Public Library, Central Branch, 630 West 5th Street, 
Los Angeles California; L.A. Public Library, San Pedro Branch, 931 
South Gaffey Street, San Pedro, California; and L.A. Public Library, 
Wilmington Branch, 1300 North Avalon, Wilmington, California.

FOR FURTHER INFORMATION CONTACT: Questions or comments concerning the 
final general conformity determination or the ROD should be directed to 
Dr. Spencer D. MacNeil, Chief of the Transportation and Special 
Projects Branch, Regulatory Division, U.S. Army Corps of Engineers, 
2151 Alessandro Drive, Suite 110, Ventura, California 93001, (805) 585-
2152.

SUPPLEMENTARY INFORMATION: None

     Dated: June 3, 2011.
David J. Castanon,
Chief, Regulatory Division, Los Angeles District.
[FR Doc. 2011-14587 Filed 6-10-11; 8:45 am]
BILLING CODE 3710-58-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.