Engineers Corps September 2005 – Federal Register Recent Federal Regulation Documents

Inland Waterways Users Board
Document Number: 05-19270
Type: Notice
Date: 2005-09-27
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In Accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting. Name of Committee: Inland Waterways Users Board (Board). Date: October 13, 2005. Location: Heathman Lodge, 7801 NE Greenwood Drive, Vancouver, Washington 98662, (1-360-254-3100). Time: Registration will begin at 8:30 a.m. and the meeting is scheduled to adjourn at 12 p.m. Agenda: The Board will hear briefings on the status of both the funding for inland navigation projects and studies, and the Inland Waterways Trust Fund. The Board will also consider its priorities for the next fiscal year.
Transfer of Jurisdiction of a Portion of Joliet Army Ammunition Plant to the Department of Agriculture for the Midewin National Tallgrass Prairie
Document Number: 05-19217
Type: Notice
Date: 2005-09-27
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
On 02 September 2005, in accordance with PL 104-106, Title XXIX, Subtitle A, entitled ``Illinois Land Conservation Act of 1995'', the Department of the Army signed a Secretariat Memorandum to transfer approximately 2,640 Acres of land at Joliet Army Ammunition Plant, Illinois to the Department of Agriculture for use by the Forest Service as the Midewin National Tallgrass Prairie. The purpose of this notice is to effect that transfer pursuant to the provisions of Section 2912(e)(2) of PL 104-106. This is a partial transfer of the entire acreage contemplated by the statute. Additional transfers will be made in the future. A map entitled ``2004 USDA Assignment Parcel Locator Map'' and legal descriptions of the MFG area revised 18 January 2005 and of the LAP area revised 11 August 2005 of the property which is the subject of the partial transfer are on file with the U.S. Army Engineer District, Corps of Engineers, Louisville, Kentucky and the Office of the Regional Forester, USDA, Forest Service.
Intent to Prepare a Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for a Permit Application for Navigation Modifications and Improvements as Part of the San Pedro Waterfront and Promenade Development, in the Port of Los Angeles, Los Angeles County, CA
Document Number: 05-17691
Type: Notice
Date: 2005-09-07
Agency: Department of Defense, Corps of Engineers, Department of the Army, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps) Los Angeles District in conjunction with the Los Angeles Harbor Department (Port) is examining the feasibility of various waterside navigation improvements as part of the Port's proposed San Pedro Waterfront and Promenade redevelopment proposal in the Port of Los Angeles. The Corps is considering the Port's application for a Department of the Army permit under Clean Water Act Section 404 and River and Harbor Act Section 10 to conduct dredge and fill activities and construct various navigation improvements The primary Federal involvement is the discharge of dredge and/or fill materials within waters of the United States, work (e.g. dredging) and structures in or affecting navigable waters of the United States, and potential impacts on the human environment from such activities. Therefore, in accordance with the National Environmental Policy Act (NEPA), the Corps is requiring the preparation of an Environmental Impact Statement (EIS) prior to rendering a final decision on the Port's permit application. The Corps may ultimately make a determination to permit or deny the above project or permit or deny modified versions of the above project. Pursuant to the California Environmental Quality Act (CEQA), the Port will serve as Lead Agency for the Preparation of an Environmental Impact Report (EIR). The Corps and the Port have agreed to jointly prepare a Draft EIS/EIR for the improvements at Berth 136-147 in order to optimize efficiency and avoid duplication. The Draft EIS/EIR is intended to be sufficient in scope to address both the Federal and the state and local requirements and environmental issues concerning the proposed activities and permit approvals.
Intent To Prepare a Draft Environmental Impact Statement for Construction of the Following Features of the Mississippi River and Tributaries-Morganza, LA to the Gulf of Mexico Project (MtoG): Houma Navigation Canal (HNC) Lock Complex and Associated Structures, in Terrebonne Parish in the Vicinity of Dulac, LA to Include Levee Reach G1, HNC Lock Access Road, HNC Closure Dam, HNC Lock and Floodgate Complex, Levee Reach F1, Bayou Grand Caillou Structure, and the Sand Sources for these Levee Reaches
Document Number: 05-17496
Type: Notice
Date: 2005-09-02
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, Mississippi Valley Division, New Orleans District, is initiating this study under the authority of the Energy and Water Development Appropriation Act for Fiscal Year 2002 (Pub. L. 107-66) to determine the environmental impacts of the Houma Navigation Canal (HNC) lock complex and associated structures. The reconnaissance study for the Mississippi River & TributariesMorganza, Louisiana to the Gulf of Mexico hurricane protection project (MtoG) was authorized by a resolution adopted April 30, 1992, by the Committee of Public Works and Transportation of the U.S. House of Representatives. The Water Resources Development Act (WRDA) of 1996 authorized the Corps to conduct an independent study of a lock to be located in the HNC. That study was completed in 1997. In 1998, Congress authorized the Corps to initiate detailed design of the multipurpose lock in the HNC. A Final Programmatic Environmental Impact Statement (FPEIS) entitled ``Mississippi River & TributariesMorganza, Louisiana to the Gulf of Mexico Hurricane Protection'' went to the public in March 2002. A Record of Decision has not been signed for this FPEIS. The MtoG entered the design phase following approval by the Mississippi River Commission and the execution of a design agreement in May 2002. The lock complex and associated structures on the HNC are part of the larger MtoG project.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.