Engineers Corps June 22, 2005 – Federal Register Recent Federal Regulation Documents
Results 1 - 1 of 1
Availability of Draft General Reevaluation Report and Supplemental Environmental Impact Statement for the Poplar Island Environmental Restoration Project, Talbot County, MD
In accordance with the requirements of the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE), Baltimore District has prepared a Draft General Reevaluation Report (GRR) and Supplemental Environmental Impact Statement (SEIS) for the Poplar Island Environmental Restoration Project (PIERP) to evaluate the vertical and/or lateral expansion of the PIERP, design modifications to the existing project, the addition of recreational/ educational opportunities to the existing project, and the potential to accept dredged material from additional channels not specified in the 1996 EIS for the existing project. The preferred alternative includes a northern lateral expansion consisting of approximately 575 acres, of which 60% will be wetland habitat and 40% upland habitat; construction of a 5-ft vertical raising of the existing upland Cells 2 and 6 at the PIERP; amending the existing project authorization and Project Cooperation Agreement (PCA) to include the placement of dredged material from the southern approach channels to the Chesapeake and Delaware (C&D) Canal and other small Federal navigation projects; incorporation of design modifications required for the completion of the existing project, and development of recreational and educational enhancements for the PIERP. The Corps is making the Draft integrated GRR/SEIS available to the public for a 45- day review and comment period.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.