Engineers Corps February 2005 – Federal Register Recent Federal Regulation Documents
Results 1 - 4 of 4
Availability of Draft Tiered Environmental Impact Statement for the Baltimore Harbor and Channels Dredged Material Plan, MD
In accordance with the requirements of the National Environmental Policy Act, the U.S. Army Corps of Engineers (USACE), Baltimore District has prepared a Draft Tiered Environmental Impact statement (TEIS) and Dredged Material Management Plan (DMMP) to analyze dredged material placement for the Port of Baltimore for 20 years of maintenance and new work dredging. USACE is making the document available to the public for review and comment through a Notice of Availability published in the Federal Register. The overall goal of the DMMP is to develop a plan to maintain, in an economically and environmentally sound manner, channels necessary for navigation for the Port of Baltimore, conduct dredged material placement in the most environmentally sound manner, and maximize the use of dredged material as a beneficial resource. The recommendations which will provide a minimum of 20 years of dredged material placement capacity for the Port of Baltimore are: Continued use of open water placement in Virginia (Dam Neck Open Water Placement; Rappahannock Shoal Deep Alternate Open Water Placement; and Wolf Trap Alternate Open Water Placement). Optimized use of existing dredged material management sites in Maryland, including Pooles Island Open Water Site, Hart-Miller Island Dredged Material Containment Facility, Cox Creek Confined Disposal Facility and Poplar Island Environmental Restoration Project (PIERP). Multiple confined disposal facilities for harbor material in Patapsco River. Large Island Restoration-Middle Chesapeake Bay. PIERP Expansion. Wetland Restoration-Dorchester County. We are making the Draft TEIS available to the public for a 45-day review and comment period.
Notice of Intent To Prepare a Draft Environmental Impact Statement for an Environmental Dredging Project on the Mahoning River in Ohio
This notice advises the public that pursuant to the National Environmental Policy Act (NEPA) of 1969, as amended, the Pittsburgh District (District), U.S. Army Corps of Engineers, intends to develop a Draft Environmental Impact Statement (EIS). The Draft EIS will consider Federal actions associated with the District's proposal to restore the aquatic ecosystem of the lower Mahoning River in Ohio through (1) Dredging contaminated sediments lining the river; (2) bioremediating sediments in the bank and river where applicable; (3) capping contaminants in the bank; and (4) removing low-head dams along the river; or a combination of all four actions. The lower Mahoning River's ecosystem has been severely impacted by contamination from industries that once lined the valley and by several low-head dams that disrupt the river's natural hydrology. The proposed project will improve the lower Mahoning River's ecosystem to a level found at a model reach located just upstream of the project area.
Intent To Prepare an Environmental Impact Statement for Proposed Wharf Improvements and Fill at Apra Harbor, GU
Pursuant to section 102(2)(c) of the National Environmental Policy Act (NEPA) of 1969 as implemented by the Council on Environmental Quality (CEQ) regulations (40 CFR parts 1500-1508), the Port Authority of Guam and the U.S. Army Corps of Engineers hereby give notice of intent to prepare a Environmental Impact Statement (EIS) for proposed wharf improvements and fill at Apra Harbor, Guam. Under a Federal grant from the U.S. Department of Commerce Economic Development Administration, the Port Authority of Guam is proposing modifications to Apra Harbor for the purpose of improving maritime access and services to the island of Guam. The harbor is in need of improvements to meet anticipated future demands of the island's commercial port operations by providing additional cargo container storage area, and berthing facilities capable of accommodating the newest generation of large deep draft container vessels, and cruise ships. The proposed improvements would also provide contingency berthing facilities for U.S. Navy military vessels. The U.S. Army Corps of Engineers will be the lead agency in preparing the EIS. The EIS will provide an analysis of potential impacts to the environment from the proposed modifications to Apra Harbor, in compliance with NEPA and CEQ regulations.
Inland Waterways Users Board
In Accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting. Name of Committee: Inland Waterways Users Board (Board). Date: February 24, 2005. Location: The Washington Court Hotel, 525 New Jersey Avenue NW., Washington, DC 20001-1527, (1-202-628-2100). Time: Registration will begin at 8:30 a.m. and the meeting is scheduled to adjourn at 1 p.m. Agenda: The Board will hear briefings on the status of both the funding for inland navigation projects and studies, and the Inland Waterways Trust Fund. The Board will also consider its priorities for the next fiscal year.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.