Army Department April 2007 – Federal Register Recent Federal Regulation Documents
Results 1 - 15 of 15
United States Marine Corps Restricted Area and Danger Zone, Neuse River and Tributaries, Marine Corps Air Station Cherry Point, NC
The Corps of Engineers is proposing to amend its regulations to designate an existing rifle range fan as a danger zone. The military exercise area is located within the Rifle Range of Marine Corps Air Station Cherry Point, North Carolina, along the Neuse River. The danger zone will only be activated by the Marine Corps Air Station Cherry Point during range operational hours. The Marine Corps will advise residents in the vicinity of the range fan thus ensuring their safety by alerting them to temporary potential hazardous conditions which may exist as a result of small arms exercises. There will be no change in the use of the existing exercise area. The area, however, needs to be marked on navigation charts to insure security and safety for the public. Entry points into the danger zone will be prominently marked with signage indicating the boundary of the danger zone. The placement of aids to navigation and regulatory markers will be installed in accordance with the requirements of the United States Coast Guard. If the proposed signage exceeds nationwide permit and/or regional general permit conditions, the Commander, United States Marine Corps, Marine Corps Air Station Cherry Point, North Carolina will seek additional Department of the Army authorizations.
Availability of Non-Exclusive, Exclusive License or Partially Exclusive Licensing of U.S. Patent Concerning Parachute With Skirt Reefing System
In accordance with 37 CFR part 404.6, announcement is made of the availability for licensing of U.S. Patent No. US 7,195,205 B1 entitled ``Parachute with Skirt Reefing System'' issued March 27, 2007. This patent has been assigned to the United States Government as represented by the Secretary of the Army.
Army Science Board Plenary Meeting
Pursuant to the Federal Advisory Committee Act of 1972 (5 U.S.C., Appendix, as amended), the Sunshine in the Government Act of 1976 (5 U.S.C. 552b, as amended) and 41 Code of Federal Regulations (CFR) 102-3.140 through 160, the Department of the Army announces the following committee meeting: Name of Committee: Army Science Board (ASB). Date(s) of Meeting: April 23-24, 2007. Time(s) of Meeting: 0800-1700, April 23, 2007. 0800-1700, April 24, 2007. Place of Meeting: Photonics Center at Boston University, Boston, MA.
Notice of Availability of the Draft Environmental Impact Statement (DEIS) for the Base Realignment and Closure (BRAC) 05 Realignment and Transformation Actions at Fort Benning, GA
The U.S. Army announces the availability of the DEIS, which evaluates the potential environmental and socioeconomic impacts of transformation activities at Fort Benning, Georgia. These transformation proposed actions include implementation of the 05 BRAC Commission recommendations, the Global Defense Posture Realignment (GDPR) overseas re-stationing actions, Army Modular Force (AMF) initiatives, and other discretionary stationing activities.
Intent To Prepare a Legislative Environmental Impact Statement, for the Proposed Mississippi River-Gulf Outlet Deep Draft De-Authorization (3-D), LA
This notice of intent (NOI) is for the Mississippi RiverGulf Outlet (MRGO) 3-D Project. This notice of intent addresses the Federally authorized navigation channel located in southeastern Louisiana.
Intent To Prepare a Draft Supplemental Environmental Impact Statement for the Jacksonville Harbor Navigation Study, General Re-Evaluation Report, Located in Duval County, FL
The U.S. Army Corps of Engineers (Corps), Jacksonville District, intends to prepare a Draft Supplemental Environmental Impact Statement (DSEIS), for the Jacksonville Harbor Navigation Study, General Re-Evaluation Report. This action is a cooperative effort between the Corps and the Jacksonville Harbor Port Authority.
Notice of Availability for the Final Environmental Impact Statement for Hemet/San Jacinto Integrated Recharge and Recovery Project, Riverside County, CA
The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Division), in coordination with the Eastern Municipal Water District (EMWD), has completed a Final Environmental Impact Statement (EIS) for the Hemet/San Jacinto Integrated Recharge and Recovery Project. EMWD requires authorization pursuant to Section 404 of the Clean Water Act for 15.9 acres of fill into waters of the U.S.
Intent To Prepare an Environmental Impact Statement/Report for the Sun Valley Environmental Restoration Project, Los Angeles County, CA
The U.S. Corps of Engineers (Corps) intends to prepare an Environmental Impact Statement/Environmental impact Report (EIS/EIR) for the Sun Valley Environmental Restoration Plan. The study area is located in the City of Los Angeles, in the San Fernando Valley portion of Los Angeles County, CA. The study area is comprised of 4.4 square miles of urban/industrial areas. The proposed Study will be conducted under the Authority for the Los Angeles County Drainage area (LACDA), Flood Control Project, Los Angeles County, CA. Which was initially authorized by Senate Resolution, approved June 25, 1969, reading in part:
Intent To Grant an Exclusive License of a U.S. Government-Owned Patent
In accordance with 35 U.S.C. 209(e) and 37 CFR 404.7(a)(I)(i), announcement is made of the intent to grant an exclusive, royalty- bearing, revocable license to U.S. provisional patent application filed January 15, 2007 entitled ``Identification of Small Molecule Inhibitors of Filovirus Replication,'' to Functional Genetics, with its principal place of business at 708 Quince Orchard Rd., Gaithersburg, MD 20878.
Intent To Prepare a Joint Environmental Impact Statement/Environmental Impact Report for the Coyote Dam Study
In accordance with Section 204 of the 1950 Flood Control Act (Pub. L. 516, 81st Congress, 2nd Session), as recommended by the Chief of Engineers in House Document Number 585, 81st Congress, 2nd Session, the Coyote Dam (also known as the ``Lake Mendocino Project''), Ukiah, CA, is authorized to be raised 36 feet to a total storage capacity of 199,000 acre-feet (ac-ft) when the need for additional water supply arises. Since construction of Coyote Dam, increased development of Mendocino County and the accelerated rate of sedimentation in Lake Mendocino have resulted in the need for additional water supply. The additional storage capacity achieved by raising the dam would address future demands on water supply and also increase flood damage reduction functions. This is a notice of intent to prepare a joint environmental Impact Statement/Environmental Impact Report (EIS/EIR), and to consider all reasonable alternatives, evaluate potential impacts of the proposed action, and identify appropriate mitigation measures. The U.S. Army Corps of Engineers (Corps) is the lead agency for this project under the National Environmental Policy Act (NEPA), and the Mendocino County Inland Water and Power Commission (IWPC) is the lead agency and local sponsor under the California environmental quality Act (CEQA).
Intent To Prepare a Draft Environmental Impact Statement (DEIS) for the Construction of Western Wake Regional Wastewater Management Facilities, Regional Wastewater Pumping, Conveyance, Treatment, and Discharge Facilities To Serve the Towns of Apex, Cary, Holly Springs and Morrisville, as well as the Wake County Portion of Research Triangle Park (Service Area), NC
The U.S. Army Corps of Engineers (COE), Wilmington District, Wilmington Regulatory Division has received a request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act, from Western Wake Partners to construct Western Wake Regional Wastewater Management Facilities. This project will be a regional wastewater pumping, conveyance, treatment, and discharge project to serve the Towns of Apex, Cary, Holly Springs and Morrisville, as well as the Wake County portion of Research Triangle Park (service area), NC. The project is being proposed by the Western Wake Partners to provide wastewater service for planned growth and development in the project service area and to comply with two regulatory mandates. One regulatory mandate has been issued by the North Carolina Environmental Management Commission (EMC), and the second regulatory mandate has been issued by the North Carolina Department of Environment and Natural Resources (NC DENR). In accordance with the two regulatory mandates, the proposed Project must be operational and discharging effluent to the Cape Fear River Basin by January 1, 2011.
Board of Visitors, United States Military Academy (USMA)
The notice of an open meeting scheduled for April 25, 2007 published in the Federal Register on March 13, 2007 (72 FR 11337) has a new meeting location. The meeting will now be held in Room B318, Rayburn House Office Building, Washington, DC.
Preparation of an Environmental Impact Statement (EIS) for Stationing and Training of Increased Aviation Assets Within U.S. Army Alaska (USARAK)
The Army intends to prepare an EIS to assess the potential environmental impacts associated with the stationing and training of increased numbers and types of aviation assets within Alaska. The proposed increase and reorganization will allow the Army to transition to a force that is capable of providing a broad range of integrated aviation training experience to the forces of USARAK and more aviation capabilities when the unit deploys to support operational missions abroad. Existing aviation units would potentially be reorganized and stationed at Fort Wainwright, Fort Richardson or other military installations to support the training of aviation assets on U.S. Army training lands in Alaska. The reorganized unit would be capable of providing first line air transport, air reconnaissance, and close air support. The new aviation unit would be built around the existing USARAK aviation fleet of 30 medium and heavy lift transport helicopters, and USARAK's 640 aviation personnel. To this the Army proposes to add helicopters capable of providing medical evacuation, air reconnaissance, close air support, and aviation attack capabilities. The proposed aviation unit, an Aviation Task Force or Combat Aviation Brigade (CAB), would potentially consist of up to 62 medium and heavy lift helicopters, 30 combat scout helicopter, 24 attack helicopters, and between 1,200 to 2,850 personnel. This proposed stationing and training of increased aviation assets involves construction of new facilities, execution of day-to-day support operations, and routine joint military training at nearby training lands and ranges. The action may have significant environmental impacts resulting from training and construction required as part of the proposed reorganization. Significant impacts resulting from this action may include impacts to air space, noise, and cultural resources. The EIS will analyze the impacts of the proposed action and a full range of reasonable alternatives upon Alaska's natural and man-made environments.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.