Army Department June 2006 – Federal Register Recent Federal Regulation Documents
Results 1 - 26 of 26
Intent To Prepare a Draft Programmatic Environmental Impact Statement for the Beneficial Use of Dredged Material Program Study as Introduced in the 2004 Louisiana Coastal Area, Louisiana Ecosystem Restoration Study, Programmatic Environmental Impact Statement
The U.S. Army Corps of Engineers, New Orleans District, is initiating this study under the authority provided by the resolutions adopted by the Committees on Public Works of the U.S. Senate and House of Representatives, dated April 19, 1967 and October 19, 1967, respectively, an expansion of the authority created under section 3 of the River and Harbor Act approved June 13, 1902. The Louisiana Coastal Area (LCA) Beneficial Use of Dredged Material Program will optimize the use of dredged material resulting from the maintenance of federally maintained navigational channels to (1) restore formerly existing coastal wetlands; (2) reduce, halt or reverse the loss of existing coastal wetlands; (3) create coastal wetlands where none existed previously; or (4) provide protection to any of the above wetland situations or other coastal landscape features within the study placement area. The LCA Beneficial Use of Dredged Material Program costs are those costs incurred above and beyond the ordinary costs incurred with USACE Operations and Maintenance dredging and disposal operations in accordance with their established base plan for maintenance dredging activities. The base plan is determined by applying the Federal Standard which requires maintenance dredging and disposal activities to be conducted in the most cost effective, environmentally acceptable manner. The study area is Louisiana's coastal area from Mississippi to Texas. Louisiana parishes included in the study area include Ascension, Assumption, Calcasieu, Cameron, Iberia, Jefferson, Lafourche, Livingston, Orleans, Plaquemines, St. Bernard, St. Charles, St. James, St. John the Baptist, St. Martin, St. Mary, St. Tammany, Tangipahoa, Terrebonne, and Vermilion. The following seven navigation channels represent an initial list of areas with the most significant opportunities (1) Calcasieu River and Pass; (2) Houma Navigation Canal; (3) Atchafalaya River and Bayous Chene, Boeuf, and Black; (4) Bayou Lafourche; (5) Mississippi River and Tributaries Project, Head of Passes and Southwest Pass; (6) Barataria Bay Waterway; and (7) Mississippi River Gulf Outlet (although this channel is not currently funded for O&M dredging).
Notice of Solicitation for Estuary Habitat Restoration Program
Congress has appropriated limited funds to the U.S. Army Corps of Engineers (Corps) to implement the Estuary Habitat Restoration Program as authorized in Section 104 of the Estuary Restoration Act of 2000, Title I of the Estuaries and Clean Waters Act of 2000 (Pub. L. 106-457) (accessible at https://era.noaa.gov/pdfs/acts835.pdf). On behalf of the Estuary Habitat Restoration Council (Council), the Corps is soliciting proposals for estuary habitat restoration projects. This document describes project criteria and evaluation criteria the Council will use to determine which projects to recommend. Recommended projects must provide ecosystem benefits, have scientific merit, be technically feasible, and be cost-effective. Proposals selected for Estuary Habitat Restoration Program funding will be implemented in accordance with a cost-share agreement with the Corps. This is not a grants program.
Chief of Engineers Environmental Advisory Board
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting: Name of Committee: Chief of Engineers Environmental Advisory Board (EAB). Date of Meeting: July 19, 2006. Place: U.S. Army Engineer Research and Development Center, Coastal and Hydraulics Laboratory, 3909 Halls Ferry Road, Vicksburg, MS 39180- 6199. Time: 8:30 a.m. to 3 p.m.
Intent to Prepare a Draft Environmental Impact Statement for the Brooklyn Navy Yard, Brooklyn, Kings County, NY
The U.S. Army Corps of Engineers (Corps), New York District, is preparing a Draft Environmental Impact Statement (DEIS) to ascertain compliance with and to lead to the production of a National Environmental Policy Act (NEPA) document in accordance with the President's Council of Environmental Quality (CEQ) Rules and Regulations, as defined and amended in 40 Code of Federal Regulations (CFR), Parts 1500-1508, Corps principals and guidelines as defined in Engineering Regulations (ER) 1105-2-100, other applicable Federal and State environmental laws for the proposed Brooklyn Navy Yard Project. The study area consists of the portion of the Navy Yard commonly known as ``Admiral's Row'' and ``Officer Quarters''. The Navy Yard is located in the Greenpoint section of Brooklyn, Kings County, NY. This parcel, located within the former Brooklyn Navy Yard, would be transferred to the City of New York. The EIS process will determine if there are any environmental and cultural concerns that will affect the sale of the land. The land would be developed in accordance with the mission of the Brooklyn Navy Yard Development Corporation and the City of New York.
Board of Visitors, United States Military Academy (USMA)
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting: Name of Committee: Board of Visitors, United States Military Academy. Date: Monday, July 17, 2006. Place of Meeting: Superintendent's Conference Room, Taylor Hall, 2nd Floor, Bldg. 600, West Point, NY. Start Time of Meeting: Approximately 9 a.m.
Coastal Engineering Research Board (CERB)
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting:
Availability of a Supplement to the Draft Environmental Impact Statement for the Proposed Construction of a Dredged Material Containment Facility in the Patapsco River, at Masonville, Baltimore City, MD
In accordance with requirements of the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE), Baltimore District, has prepared a Draft Environmental Impact Statement (DEIS) for the proposed construction of a dredged material containment facility (DMCF) by the Maryland Port Administration (MPA). This DEIS was prepared as part of the submission of MPA's application for a Department of the Army permit to construct the facility in the Patapsco River, Baltimore City, MD. This application will be evaluated pursuant to Section 10 or the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act. The preferred alternative is for the construction of a stone, sand, and cofferdam structure that would impact approximately 131 acres of waters of the United States, including jurisdictional wetlands. The structure would be initially constructed to 10 feet above the mean lowe low water (MLLW) elevation, with a future temporary elevation to 42 feet above MLLW, and an ultimate elevation of 36 feet above MLLW. The project would also include mechanical dredging of approximately 1.7 million cubic yards of overburden material within the footprint of the proposed disposal site, and the placement of this material at the Hart Miller Island disposal site, Baltimore County, MD. On-site and off-site borrow material would be used for the construction of the containment facility. This proposal was advertised in the Federal Register on May 19, 2006 (71 FR 29128). The need to prepare a Supplement is due to the applicant's proposal to change the source of borrow material for the proposed construction of the preferred alternative. The applicant wishes to use suitable material dredged from the channel at the Seagirt Marine Terminal for the construction of a portion of the containment structure. Approximately 0.5 to 0.8 million cubic yards of sand and gravel obtained from dredging to a maximum of 54 feet below mean low water at Seagirt Marine Terminal would be used at the proposed Masonville DMCF. Detailed description of the proposed modifications and effects to the human environment are discussed in the supplement to the DEIS for the Masonville DMCF.
Advisory Committee Meeting Notice
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following meeting: Name of Committee: Distance Learning/Training Technology Applications Subcommittee of the Army Education Advisory Committee. Date: July 19-20, 2006. Place: U.S. Army War College, Carlisle, PA. Time: 0800-1630 on 19 July 2006; 0800-1600 on 20 July 2006. Proposed Agenda: The meeting agenda includes updates on The Army Distributed Learning Program (TADLP) and infrastructure, review of selected courseware, and discussions focused on learning and technology. Purpose of the Meeting: To provide for the continuous exchange of information and ideas for distance learning between the U.S. Army Training and Doctrine Command (TRADOC), HQ, Department of the Army, and the academic and business communities.
Availability of Non-Exclusive, Exclusive License or Partially Exclusive Licensing of U.S. Patent Concerning Method of Forming an Electrically Conductive Connection Utilizing a Polynucleotide/Conductive Polymer Complex
In accordance with 37 CFR Part 404.6, announcement is made of the availability for licensing of U.S. Patent No. US 7,056,675 B2 entitled ``Method of Forming an Electrically Conductive Connection Utilizing a Polynucleotide/Conductive Polymer Complex'' issued June 6, 2006. This patent has been assigned to the United States Government as represented by the Secretary of the Army.
Intent To Prepare Draft Environmental Impact Statement for the Proposed Implementation of Interim Water Storage Contracts Associated With the Southeastern Federal Power Customers Settlement Agreement, at Lake Sidney Lanier/Buford Dam, GA
The U.S. Army Corps of Engineers (Corps), Mobile District, intends to prepare a Draft Environmental Impact Statement (EIS), as required by the National Environmental Policy Act (NEPA), to address the proposed implementation of interim water storage contracts at Lake Sidney Lanier/Buford Dam, GA, as contained in a settlement agreement associated with the Southeastern Federal Power Customers, Inc. (SeFPC) v. Secretary of the Army, et al. (1:00CV02954-TPJ) lawsuit. The Draft EIS will also address any changes in water management operations at the reservoir project, as well as the potential for other changes to operations in downstream reservoir projects, which would result from implementation of the settlement agreement.
Availability of the Final Environmental Impact Statement for the Construction and the Operation of a Battle Area Complex and a Combined Arms Collective Training Facility Within U.S. Army Training Lands in Alaska
The Army announces the availability of a Final Environmental Impact Statement (FEIS) for the construction and operation of a Battle Area Complex (BAX) and a Combined Arms Collective Training Facility (CACTF) within U.S. Army training lands in Alaska, and the execution of routine, joint military training at these locations. The purpose of the proposed project is to provide year-round, fully automated, comprehensive and realistic training and range facilities for U.S. Army, Alaska and other units. The FEIS analyzes the proposed action's impacts upon Alaska's natural and man-made environments. The FEIS was prepared in pursuant to the National Environmental Policy Act (NEPA).
Intent To Prepare a Draft Supplement to the Environmental Impact Statement to Evaluate Construction of Authorized Improvements to the Federal Pascagoula Harbor Navigation Project in Jackson County, MS
The Mobile District, U.S. Army Corps of Engineers (Corps), intends to prepare a Draft Supplement to the Environmental Impact Statement (DSEIS) to address the potential impacts associated with construction of authorized improvements to the Federal Pascagoula Harbor Navigation Project in Jackson County, MS. The DSEIS will be used as a basis for ensuring compliance with the National Environmental Policy Act (NEPA) and evaluating the following two alternative plans: ``No Action'' and widening and deepening to the authorized project dimensions. Construction of some of the authorized improvements was completed in 1999. Remaining authorized elements which will be evaluated include widening the Gulf Entrance channel from 450 feet to 550 feet wide and deepening the Upper Pascagoula channel from 38 feet to 42 feet deep.
Reserve Officers' Training Corps (ROTC) Program Subcommittee
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (5 U.S.C., App. 2), announcement is made of the following Committee meeting:
Notice of Availability of Draft Environmental Impact Statement for the Floyd County, KY (Levisa Fork Basin), Section 202 Project
The comment period for the Draft Environmental Impact Statement for the Floyd County, KY (Levisa Fork Basin), Section 202 Project published in the Federal Register on Friday, May 5, 2006 (71 FR 26478), required comments be submitted 45 days (June 19, 2006) following publication in the Federal Register. The comment period has been extended to 60 days (July 5, 2006).
Inland Waterways Users Board
In accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting.
Intent to Prepare a Supplement to the Final Environmental Statement for the Area VI (Elm Fork of the North Fork of the Red River) Portion of the Red River Chloride Control Project, Texas and Oklahoma
The purpose of the Supplement to the Final Environmental Statement (SFES) is to address alternatives and modifications to the authorized plan for chloride control at Area VI on the Elm Fork of the North Fork of the Red River, OK.
Intent To Prepare a Draft Environmental Impact Statement (DEIS) for Millington and Vicinity, Tennessee
The Millington, Tennessee and Vicinity Feasibility Study will be conducted to analyze problems being experienced in the Big Creek drainage basin and evaluate alternatives to provide plans for ecosystem restoration, flood damage reduction, and recreation. National Ecosystem Restoration (NER) benefits will be evaluated with respect to the net change in habitat quantity and/or quality and expressed quantitatively in physical units and indices, but not monetary units. If justified, the feasibility study and EIS will recommend a plan.
Intent To Hold a North Dakota River Task Force Meeting as Established by the Missouri River Protection and Improvement Act of 2000 (Title VII)
The duties of the Task Force are to prepare and approve a plan for the use of the funds made available under Title VII to promote conservation practices in the Missouri River watershed, control and remove the sediment from the Missouri River, protect recreation on the Missouri River from sedimentation and protect Indian and non-Indian historical and cultural sites along the Missouri River from erosion.
Proposed Collection; Comment Request
In compliance with section 3506(c)(2)(A) of the Paperwork Reduction Act of 1995, the Department of the Army announces the extension of a public information collection and seeks public comment on the provisions thereof. Comments are invited on: (a) Whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed information collection; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the information collection on respondents, including through the use of automated collection techniques or other forms of information technology.
Proposed Collection; Comment Request
In compliance with section 3506(c)(2)(A) of the Paperwork Reduction Act of 1995, the Department of the Army announces the extension of a public information collection and seeks public comment on the provisions thereof. Comments are invited on: (a) Whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed information collection; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the information collection on respondents, including through the use of automated collection techniques or other forms of information technology.
Proposed Collection; Comment Request
In compliance with section 3506(c)(2)(A) of the Paperwork Reduction Act of 1995, the Department of the Army announces the extension of a public information collection and seeks public comment on the provisions thereof. Comments are invited on: (a) Whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed information collection; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the information collection on respondents, including through the use of automated collection techniques or other forms of information technology.
Availability of the Final Supplemental Environmental Impact Statement for the Boston Harbor Inner Harbor Maintenance Dredging Project
The U.S. Army Corps of Engineers, New England District has prepared a Final Supplemental Environmental Impact Statement to maintenance dredge the following Federal navigation channels: The Main Ship Channel upstream of Spectacle Island to the Inner Confluence, the upper Reserved Channel, the approach to the Navy Dry Dock, a portion of the Mystic River, and a portion of the Chelsea River (previously permitted) in Boston Harbor, MA. Maintenance dredging of the navigation channels landward of Spectacle Island is needed to remove shoals and restore the Federal navigation channels to their authorized depths. Materials dredged from the Federal channels will either be disposed at the Massachusetts Bay Disposal Site (for the material suitable for unconfined open water disposal) or, for the material not suitable for unconfined open water disposal, in confined aquatic disposal (CAD) cell(s). Major navigation channel improvements (deepening) were made in 1999 through 2001 in the Reserved Channel, the Mystic River, Inner Confluence and the Chelsea River. A Final EIS prepared for this previous navigation improvement project in June of 1995 identified selected use of CAD cells in the Mystic River, Inner Confluence, and Chelsea River were investigated. A new CAD cell for the proposed maintenance project will be constructed in the Mystic River and in the Main Ship Channel just below the Inner Confluence.
Availability of the Draft Environmental Impact Statement for the White River Minimum Flow Reallocation Study, AR
Pursuant to section 102(2)(c) of the National Environmental Policy Act (NEPA) of 1969 (as amended), the U.S. Army Corps of Engineers (USACE), Little Rock District, has prepared a Draft Environmental Impact Statement (DEIS) for the proposed implementation of the White River Minimum Flow, Arkansas. This DEIS is being made available for a 45-day public comment period.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.