Department of Defense May 20, 2011 – Federal Register Recent Federal Regulation Documents

Availability of a Final Environmental Impact Statement To Consider Issuance of a Department of the Army Permit Pursuant to Section 404 of the Clean Water Act for the Sabine Mining Company's Proposal To Construct, Operate, and Reclaim the Rusk Permit Area, Rusk, Panola, and Harrison Counties, TX (USACE Project No. SWF-2007-00560)
Document Number: 2011-12512
Type: Notice
Date: 2011-05-20
Agency: Department of Defense, Department of the Army, Corps of Engineers
In accordance with the requirements of the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE) Fort Worth District has prepared a Final Environmental Impact Statement (FEIS). This FEIS evaluates project alternatives and potential impacts to the natural, physical and human environment as a result of the Sabine Mining Company's proposal to construct, operate and reclaim the Rusk Permit Area. The USACE regulates this proposed project pursuant to Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act. The proposed activity would involve the discharge of dredged and fill material into waters of the United States associated with the proposed construction, operation and reclamation of the Rusk Permit Area.
Notice of Availability of the Final Programmatic Environmental Impact Statement for the Mechanical and Artificial Creation and Maintenance of Emergent Sandbar Habitat in the Riverine Segments of the Upper Missouri River, Missouri River Basin, United States
Document Number: 2011-12511
Type: Notice
Date: 2011-05-20
Agency: Department of Defense, Department of the Army, Corps of Engineers
In accordance with the National Environmental Policy Act of 1969, as amended, the U.S. Army Corps of Engineers intends to file a Final Programmatic Environmental Impact Statement (FPEIS) for the Mechanical and Artificial Creation and Maintenance of Emergent Sandbar Habitat on the Riverine Segments of the Upper Missouri River with the U.S. Environmental Protection Agency. The FEIS is available for final public review. Details on the proposed action, location and areas of environmental concern addressed in the FPEIS are provided below under SUPPLEMENTARY INFORMATION.
Notice of Intent To Prepare Draft Environmental Impact Statements/Environmental Impact Reports for the Sutter Basin Feasibility Study and the Section 408 Permission for the Feather River West Levee Project, Sutter and Butte Counties, CA
Document Number: 2011-12510
Type: Notice
Date: 2011-05-20
Agency: Department of Defense, Department of the Army, Corps of Engineers
Pursuant to the National Environmental Policy Act of 1969, as amended, and the California Environmental Quality Act (CEQA), the U.S. Army Corps of Engineers (USACE) intends to prepare a separate Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for each of the following related flood risk management study efforts in north-central California: a Feasibility Study of flood risk management and related water resources problems in the Sutter Basin conducted by USACE under the authority of the Flood Control Act of 1962 (Pub. L. 87-874); and under Section 14 of the Rivers and Harbors Act of 1899 (as amended) (33 U.S.C. 408), and Section 404 of the Clean Water Act (33 U.S.C. 1344), the proposed Feather River West Levee Project (FRWLP), sponsored by the Sutter Butte Flood Control Agency (SBFCA) as a locally driven flood management improvement project. The two projects are being studied in close coordination because they partially overlap in their study areas, purpose, potential improvements, potential effects, and involved parties. Therefore, a joint scoping process is being conducted for the two projects to explain the relationship between the two efforts and obtain public input in a manner that is convenient, efficient, and integrated. Figures of the two project areas can be viewed at the SBFCA Web site at: https://www.sutterbutteflood.org/index.php/noticesdocuments. Sutter Basin Feasibility Study. On March 20, 2000, the State of California entered into a feasibility cost-sharing agreement (FCSA) with USACE to initiate a feasibility study. An amendment to the FCSA was signed in 2010, which included SBFCA as a non-Federal sponsor. The purpose of the study is to address flood risk, ecosystem restoration and recreation-related issues in the study area. If a Federal interest is determined, the study would result in a decision document, a General Investigation Feasibility Study report and EIS/EIR, which would be the basis for a recommendation to Congress for authorization. The Central Valley Flood Protection Board (CVFPB) and SBFCA are coordinating with USACE on the feasibility study. USACE, as the Federal lead agency under NEPA, and SBFCA, as the state lead agency under CEQA in coordination with CVFPB, have determined that an EIS/EIR will be prepared to describe alternatives, potential environmental effects, and mitigation measures. FRWLP. SBFCA is planning the FRWLP to construct improvements to the west levee of the Feather River from Thermalito Afterbay to the Sutter Bypass confluence to meet Federal, state, and local flood protection criteria and goals. In 2010, an assessment district was enacted to provide local funding toward flood management improvements. These funds may be matched with those from the Early Implementation Program (funded through previous state bonds) administered by the California Department of Water Resources (DWR). In order to implement the project, the sponsor must acquire permission from USACE to alter the Federal project under Section 14 of the Rivers and Harbors Act of 1899 (as amended) (33 U.S.C. 408 or, Section 408). USACE also has authority under Section 404 of the Clean Water Act (33 U.S.C. 1344) over activities involving the discharge of dredged or fill material to waters of the United States, which are known to be in the project area. The purpose of the FRWLP would be to construct improvements as quickly as possible in advance of and compatible with the Sutter Basin Project. USACE, acting as the Federal lead agency under NEPA, and SBFCA, acting as the state lead agency under the CEQA in coordination with CVFPB, have determined that an EIS/EIR will be prepared to describe alternatives, potential environmental effects, and mitigation measures.
36(b)(1) Arms Sales Notification
Document Number: 2011-12405
Type: Notice
Date: 2011-05-20
Agency: Department of Defense, Office of the Secretary
The Department of Defense is publishing the unclassified text of a section 36(b)(1) arms sales notification. This is published to fulfill the requirements of section 155 of Public Law 104-164 dated 21 July 1996.
Intent To Prepare an Environmental Impact Statement (EIS) for the Alaska Department of Transportation & Public Facilities Foothills West Transportation Access Project
Document Number: 2011-12371
Type: Notice
Date: 2011-05-20
Agency: Department of Defense, Department of the Army, Corps of Engineers
The Alaska District, U.S. Army Corps of Engineers (Corps) intends to prepare a Draft Environmental Impact Statement (DEIS) to identify and analyze the potential impacts associated with the proposed Foothills West Transportation Access Project (Foothills Project). The Corps is the lead Federal agency; the Bureau of Land Management (BLM) and the Alaska Department of Natural Resources (ADNR) are participating as cooperating agencies in the DEIS development process. The Corps will be evaluating a permit application for work under Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act. The Environmental Impact Statement (EIS) will be used as a basis for the permit decision and to ensure compliance with the National Environmental Policy Act (NEPA).
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.