the project area. Due to these
authorities, USACE is acting as the lead
agency for the EIS pursuant to NEPA.
SBFCA will be acting as the lead agency
for the EIR according to CEQA as an
agency of the State of California with
delegated authority to approve the
project.
2. Alternatives. The EIS/EIRs will
consider several alternatives for
reducing flood damage. Alternatives
analyzed during the investigation will
consist of a combination of one or more
measures to reduce the risk of flooding.
These measures include installing cutoff
walls, and constructing seepage berms.
3. Scoping Process.
a. A series of public scoping meetings
will be held on June 27 and 28, 2011,
to present information to the public and
to receive comments from the public on
both the feasibility study and the
FRWLP. These meetings are intended to
initiate the process to involve concerned
individuals, and local, state, and
Federal agencies.
b. Significant issues to be analyzed in
depth in the environmental documents
include effects on hydraulics, wetlands
and other waters of the U.S., vegetation
and wildlife resources, special-status
species, aesthetics, cultural resources,
recreation, land use, fisheries, water
quality, air quality, transportation, and
socioeconomics; and cumulative effects
of related projects in the study area.
c. USACE is consulting with the State
Historic Preservation Officer to comply
with the National Historic Preservation
Act and with the U.S. Fish and Wildlife
Service and National Marine Fisheries
Service to comply with the Endangered
Species Act. USACE also is coordinating
with the U.S. Fish and Wildlife Service
to comply with the Fish and Wildlife
Coordination Act.
d. A 45-day public review period will
be provided for individuals and
agencies to review and comment on the
draft environmental documents. All
interested parties are encouraged to
respond to this notice and provide a
current address if they wish to be
notified of the draft EIS/EIR circulation.
4. Availability. The draft EIS/EIR for
the FRWLP is scheduled to be available
for public review and comment in late
2011. The draft EIS/EIR for the Sutter
Basin Feasibility Study is scheduled to
be available for public review and
comment in mid 2012.
Dated: May 12, 2011.
Andrew B. Kiger,
LTC, EN, Commanding.
[FR Doc. 2011–12510 Filed 5–19–11; 8:45 am]
BILLING CODE 3720–58–P
VerDate Mar<15>2010
17:22 May 19, 2011
Jkt 223001
DEPARTMENT OF DEFENSE
Department of the Army; Corps of
Engineers
Notice of Availability of the Final
Programmatic Environmental Impact
Statement for the Mechanical and
Artificial Creation and Maintenance of
Emergent Sandbar Habitat in the
Riverine Segments of the Upper
Missouri River, Missouri River Basin,
United States
Department of the Army, U.S.
Army Corps of Engineers, DoD.
ACTION: Notice of Availability.
AGENCY:
In accordance with the
National Environmental Policy Act of
1969, as amended, the U.S. Army Corps
of Engineers intends to file a Final
Programmatic Environmental Impact
Statement (FPEIS) for the Mechanical
and Artificial Creation and Maintenance
of Emergent Sandbar Habitat on the
Riverine Segments of the Upper
Missouri River with the U.S.
Environmental Protection Agency. The
FEIS is available for final public review.
Details on the proposed action, location
and areas of environmental concern
addressed in the FPEIS are provided
below under SUPPLEMENTARY
INFORMATION.
DATES: The review period will be open
30 days from the date of this notice. The
Record of Decision is anticipated to be
issued in August, 2011.
ADDRESSES: Written comments should
be sent to: Department of the Army;
Corps of Engineers, Omaha District;
CENWO–PM–AC; ATTN: Emergent
Sandbar Habitat Programmatic EIS; 1616
Capitol Avenue; Omaha, NE 68102–
4901, or e-mailed to:
Cynthia.s.upah@usace.army.mil.
Comments must be postmarked,
e-mailed, or otherwise submitted no
later than June 13, 2011. Copies of the
FPEIS have been sent to all agencies and
individuals who participated in the
scoping process or public hearings and
to those requesting copies. The FEIS is
available online at: https://
www.moriverrecovery.org/mrrp/MRRP_
PUB_DEV.download_documentation_
peis. To obtain a copy, please contact
Ms. Cynthia Upah.
FOR FURTHER INFORMATION CONTACT: Ms.
Cynthia Upah, Project Manager, by
telephone: (402) 995–2672, by mail:
1616 Capitol Avenue, Omaha, NE
68102–4901, or by e-mail:
Cynthia.s.upah@usace.army.mil. For
inquires from the media, please contact
the USACE Omaha District Public
Affairs Officer (PAO), Ms. Monique
Farmer by telephone: (402) 995–2416,
SUMMARY:
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
29217
by mail: 1616 Capitol Avenue, Omaha,
NE 68102, or by e-mail:
Monique.l.farmer@usace.army.mil.
1.
Background. The Emergent Sandbar
Habitat (ESH) program is being
implemented by the U.S. Army Corps of
Engineers (Corps) for the benefit of the
interior population of the Interior least
tern (least tern) and the northern Great
Plains piping plover (piping plover).
This implementation program resulted
from a Biological Opinion (BiOp) issued
by the U.S. Fish and Wildlife Service
(USFWS) in which the Reasonable and
Prudent Alternative (RPA) called for the
Corps to provide sufficient ESH acreage
in order to meet biological metrics
(fledge ratios) to avoid jeopardizing
continued existence of the species, as
defined by the Endangered Species Act
(ESA).
The FPEIS is needed to provide
National Environmental Policy Act
(NEPA) coverage for the mechanical and
artificial construction of ESH in the
riverine segments of the Upper Missouri
River, pursuant to the 2003 BiOp
Amendment RPA IV(b) 3, and to
compare impacts among a range of
alternatives. The goal is to inform the
selection of a preferred alternative that
allows for the creation and replacement
of sufficient habitat to support tern and
plover populations on the Missouri
River in a safe, efficient and costeffective manner that minimizes
negative environmental consequences.
Alternatives to the proposed project
that are considered in the FPEIS include
(1) no action, including existing
program activities and no action; (2) and
6 action alternatives of various acreage
creation. Environmental issues
addressed in the FPEIS include
hydrology, water quality, aggradation
and degradation, biological resources,
air quality, noise and recreation.
After detailed consideration of the
environmental and social impacts, and
cumulative effects, of the Alternatives,
the Corps has identified an Adaptive
Management Implementation Process
(AMIP) as the preferred alternative, and
not one of the specific acreage
alternatives. The key aspect of the AMIP
is that, rather than selecting a specific
acreage alternative and pursuing such
construction, actions would be
progressively implemented with the
focus on monitoring a combination of
biological and physical metrics
(measurements). Implementation of
progressively larger acreage amounts of
habitat would continue until the desired
biological response is attained and
sustained.
SUPPLEMENTARY INFORMATION:
E:\FR\FM\20MYN1.SGM
20MYN1
29218
Federal Register / Vol. 76, No. 98 / Friday, May 20, 2011 / Notices
However, the exact number of acres
needed to be constructed and
maintained is uncertain at this time.
Based on the analysis in the PEIS, the
impacts of the larger alternatives (3, 2
and 1) are deemed to be moderate to
high. The Corps has chosen a maximum
construction ceiling of Alternative 3.5
(4,370 acres) at this time. Impacts of
lesser alternatives (3.5, 4 and 5) are
deemed to be moderate to low. This
checkpoint of Alternative 3.5 is
proposed because it represents a
midrange of habitat available at a time
when the birds were productive
(biological metric), and it is anticipated
that a positive, sustainable biological
response will be met before fully
implementing up to Alternative 3.5. If
Alternative 3.5 is fully implemented
and the birds are not meeting biological
metrics, the Corps can consider
continuing to higher acreage alternatives
or look at other methodologies.
Appropriate coordination and
disclosure would be pursued if
Alternative 3.5 was exceeded (potential
amended Record of Decision or
additional NEPA).
2. Document Availability. The
Emergent Sandbar Habitat Programmatic
EIS is available online at https://
www.moriverrecovery.org/mrrp/MRRP_
PUB_DEV.download_documentation_
peis, or see the ADDRESSES section. For
more information about the Emergent
Sandbar Habitat program, please visit
https://www.moriverrecovery.org under
‘‘BiOp/Mit Efforts.’’
[FR Doc. 2011–12511 Filed 5–19–11; 8:45 am]
BILLING CODE 3720–58–P
DEPARTMENT OF DEFENSE
Department of the Army; Corps of
Engineers
jlentini on DSK4TPTVN1PROD with NOTICES
Availability of a Final Environmental
Impact Statement To Consider
Issuance of a Department of the Army
Permit Pursuant to Section 404 of the
Clean Water Act for the Sabine Mining
Company’s Proposal To Construct,
Operate, and Reclaim the Rusk Permit
Area, Rusk, Panola, and Harrison
Counties, TX (USACE Project No.
SWF–2007–00560)
Department of the Army, U.S.
Army Corps of Engineers, DoD.
ACTION: Notice of availability.
AGENCY:
In accordance with the
requirements of the National
Environmental Policy Act (NEPA), the
VerDate Mar<15>2010
17:22 May 19, 2011
Jkt 223001
Submit comments no later than
60 days from the date of publication of
this notice.
DATES:
Send written comments and
suggestions concerning this proposal to
Mr. Darvin Messer, Regulatory Project
Manager, Regulatory Branch, CESWF–
PER–R, U.S. Army Corps of Engineers,
Fort Worth District, P.O. Box 17300,
Fort Worth, TX 76102–0300 or via email: Darvin.Messer@usace.army.mil.
Requests to be placed on the mailing
list should also be sent to this address.
Please reference USACE Project No.
SWF–2007–00560.
ADDRESSES:
Copies of the FEIS are also available
for inspection at the locations identified
below:
(1) Tatum Public Library, 335 Hood
Street, Tatum, TX 75691.
(2) Sammie Brown Library, 522 West
College Street, Carthage, TX 75633.
(3) Longview Public Library, 222 West
Cotton Street, Longview, TX 75601.
(4) Rusk County Library, 106 East
Main St., Henderson, TX 75652.
(5) Marshall Public Library, 300 South
Alamo Boulevard, Marshall, TX 75670.
(6) Henderson City Hall, 400 West
Main Street, Henderson, TX 75652.
(7) Tatum City Hall, 680 Crystal
Farms Road, Tatum, TX 75691.
(8) Longview City Hall, 300 West
Cotton Street, Longview, TX 75601.
(9) Carthage City Hall, 812 West
Panola Street, Carthage, TX 75633.
(10) Marshall City Hall, 401 South
Alamo Boulevard, Marshall, TX 75785.
After the public comment period
ends, the USACE will consider all
comments received, revise the FEIS as
appropriate, and issue a Final
Environmental Impact Statement.
Stephen L Brooks,
Chief, Regulatory Branch.
[FR Doc. 2011–12512 Filed 5–19–11; 8:45 am]
BILLING CODE 3720–58–P
Mr.
Darvin Messer, Regulatory Project
Manager at (817) 886–1744 or via email: Darvin.Messer@usace.army.mil.
DEPARTMENT OF DEFENSE
Discharges
of fill material into waters of the United
States are regulated under Section 404
of the Clean Water Act, with the
permitting responsibility administered
by the USACE. The proposed project
must also address environmental
impacts relative to the Clean Air Act,
Clean Water Act, Endangered Species
Act and the Fish and Wildlife
Coordination Act (FWCA). In
accordance with the NEPA, the FEIS
evaluates practicable alternatives for the
USACE’s decision making process. As
required by NEPA, the USACE also
analyzes the ‘‘no action’’ alternative as a
baseline for gauging potential impacts.
Intent To Prepare an Environmental
Impact Statement (EIS) for the Alaska
Department of Transportation & Public
Facilities Foothills West
Transportation Access Project
FOR FURTHER INFORMATION CONTACT:
SUPPLEMENTARY INFORMATION:
Dated: May 9, 2011.
Kayla Eckert Uptmor,
Chief Planning Branch, Omaha District.
SUMMARY:
U.S. Army Corps of Engineers (USACE)
Fort Worth District has prepared a Final
Environmental Impact Statement (FEIS).
This FEIS evaluates project alternatives
and potential impacts to the natural,
physical and human environment as a
result of the Sabine Mining Company’s
proposal to construct, operate and
reclaim the Rusk Permit Area. The
USACE regulates this proposed project
pursuant to Section 10 of the Rivers and
Harbors Act of 1899 and Section 404 of
the Clean Water Act. The proposed
activity would involve the discharge of
dredged and fill material into waters of
the United States associated with the
proposed construction, operation and
reclamation of the Rusk Permit Area.
Written comments should be sent to
Mr. Darvin Messer (see ADDRESSES). The
comments are due no later than 60 days
from the date of publication of this
notice. Copies of the FEIS may be
obtained by contacting USACE Fort
Worth District Regulatory Branch at
(817) 886–1731 or downloaded/printed
from the Fort Worth District USACE
Internet Web site at: https://
www.swf.usace.army.mil/pubdata/
environ/regulatory/permitting/rusk.asp.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
Department of the Army, Corps of
Engineers
U.S. Army Corps of Engineers,
Department of Defense.
ACTION: Notice of Intent.
AGENCY:
The Alaska District, U.S.
Army Corps of Engineers (Corps)
intends to prepare a Draft
Environmental Impact Statement (DEIS)
to identify and analyze the potential
impacts associated with the proposed
Foothills West Transportation Access
Project (Foothills Project). The Corps is
the lead Federal agency; the Bureau of
Land Management (BLM) and the
Alaska Department of Natural Resources
(ADNR) are participating as cooperating
agencies in the DEIS development
process. The Corps will be evaluating a
permit application for work under
Section 10 of the Rivers and Harbors Act
of 1899 and Section 404 of the Clean
Water Act. The Environmental Impact
Statement (EIS) will be used as a basis
for the permit decision and to ensure
SUMMARY:
E:\FR\FM\20MYN1.SGM
20MYN1
Agencies
[Federal Register Volume 76, Number 98 (Friday, May 20, 2011)]
[Notices]
[Pages 29217-29218]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-12511]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army; Corps of Engineers
Notice of Availability of the Final Programmatic Environmental
Impact Statement for the Mechanical and Artificial Creation and
Maintenance of Emergent Sandbar Habitat in the Riverine Segments of the
Upper Missouri River, Missouri River Basin, United States
AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD.
ACTION: Notice of Availability.
-----------------------------------------------------------------------
SUMMARY: In accordance with the National Environmental Policy Act of
1969, as amended, the U.S. Army Corps of Engineers intends to file a
Final Programmatic Environmental Impact Statement (FPEIS) for the
Mechanical and Artificial Creation and Maintenance of Emergent Sandbar
Habitat on the Riverine Segments of the Upper Missouri River with the
U.S. Environmental Protection Agency. The FEIS is available for final
public review. Details on the proposed action, location and areas of
environmental concern addressed in the FPEIS are provided below under
SUPPLEMENTARY INFORMATION.
DATES: The review period will be open 30 days from the date of this
notice. The Record of Decision is anticipated to be issued in August,
2011.
ADDRESSES: Written comments should be sent to: Department of the Army;
Corps of Engineers, Omaha District; CENWO-PM-AC; ATTN: Emergent Sandbar
Habitat Programmatic EIS; 1616 Capitol Avenue; Omaha, NE 68102-4901, or
e-mailed to: Cynthia.s.upah@usace.army.mil. Comments must be
postmarked, e-mailed, or otherwise submitted no later than June 13,
2011. Copies of the FPEIS have been sent to all agencies and
individuals who participated in the scoping process or public hearings
and to those requesting copies. The FEIS is available online at: https://www.moriverrecovery.org/mrrp/MRRP_PUB_DEV.download_documentation_peis. To obtain a copy, please contact Ms. Cynthia Upah.
FOR FURTHER INFORMATION CONTACT: Ms. Cynthia Upah, Project Manager, by
telephone: (402) 995-2672, by mail: 1616 Capitol Avenue, Omaha, NE
68102-4901, or by e-mail: Cynthia.s.upah@usace.army.mil. For inquires
from the media, please contact the USACE Omaha District Public Affairs
Officer (PAO), Ms. Monique Farmer by telephone: (402) 995-2416, by
mail: 1616 Capitol Avenue, Omaha, NE 68102, or by e-mail:
Monique.l.farmer@usace.army.mil.
SUPPLEMENTARY INFORMATION: 1. Background. The Emergent Sandbar Habitat
(ESH) program is being implemented by the U.S. Army Corps of Engineers
(Corps) for the benefit of the interior population of the Interior
least tern (least tern) and the northern Great Plains piping plover
(piping plover). This implementation program resulted from a Biological
Opinion (BiOp) issued by the U.S. Fish and Wildlife Service (USFWS) in
which the Reasonable and Prudent Alternative (RPA) called for the Corps
to provide sufficient ESH acreage in order to meet biological metrics
(fledge ratios) to avoid jeopardizing continued existence of the
species, as defined by the Endangered Species Act (ESA).
The FPEIS is needed to provide National Environmental Policy Act
(NEPA) coverage for the mechanical and artificial construction of ESH
in the riverine segments of the Upper Missouri River, pursuant to the
2003 BiOp Amendment RPA IV(b) 3, and to compare impacts among a range
of alternatives. The goal is to inform the selection of a preferred
alternative that allows for the creation and replacement of sufficient
habitat to support tern and plover populations on the Missouri River in
a safe, efficient and cost-effective manner that minimizes negative
environmental consequences.
Alternatives to the proposed project that are considered in the
FPEIS include (1) no action, including existing program activities and
no action; (2) and 6 action alternatives of various acreage creation.
Environmental issues addressed in the FPEIS include hydrology, water
quality, aggradation and degradation, biological resources, air
quality, noise and recreation.
After detailed consideration of the environmental and social
impacts, and cumulative effects, of the Alternatives, the Corps has
identified an Adaptive Management Implementation Process (AMIP) as the
preferred alternative, and not one of the specific acreage
alternatives. The key aspect of the AMIP is that, rather than selecting
a specific acreage alternative and pursuing such construction, actions
would be progressively implemented with the focus on monitoring a
combination of biological and physical metrics (measurements).
Implementation of progressively larger acreage amounts of habitat would
continue until the desired biological response is attained and
sustained.
[[Page 29218]]
However, the exact number of acres needed to be constructed and
maintained is uncertain at this time. Based on the analysis in the
PEIS, the impacts of the larger alternatives (3, 2 and 1) are deemed to
be moderate to high. The Corps has chosen a maximum construction
ceiling of Alternative 3.5 (4,370 acres) at this time. Impacts of
lesser alternatives (3.5, 4 and 5) are deemed to be moderate to low.
This checkpoint of Alternative 3.5 is proposed because it represents a
midrange of habitat available at a time when the birds were productive
(biological metric), and it is anticipated that a positive, sustainable
biological response will be met before fully implementing up to
Alternative 3.5. If Alternative 3.5 is fully implemented and the birds
are not meeting biological metrics, the Corps can consider continuing
to higher acreage alternatives or look at other methodologies.
Appropriate coordination and disclosure would be pursued if Alternative
3.5 was exceeded (potential amended Record of Decision or additional
NEPA).
2. Document Availability. The Emergent Sandbar Habitat Programmatic
EIS is available online at https://www.moriverrecovery.org/mrrp/MRRP_PUB_DEV.download_documentation_peis, or see the ADDRESSES section.
For more information about the Emergent Sandbar Habitat program, please
visit https://www.moriverrecovery.org under ``BiOp/Mit Efforts.''
Dated: May 9, 2011.
Kayla Eckert Uptmor,
Chief Planning Branch, Omaha District.