Department of Defense January 31, 2008 – Federal Register Recent Federal Regulation Documents

Notice of Intent To Prepare an Environmental Impact Statement for 408 Permission and 404 Permit to Sacramento Area Flood Control Agency for the Natomas Levee Improvement Project, Sacramento, CA
Document Number: E8-1753
Type: Notice
Date: 2008-01-31
Agency: Department of Defense, United States Army Corps of Engineers, Engineers Corps, Army Department
The action being taken is the preparation of an environmental impact statement (EIS) for the issuance of both the 408 permission and 404 permit to SAFCA for their work on the Natomas Levee Improvement Project (NLIP). The 408 is permission to alter existing flood control structures and the 404 permit is required for the discharge of dredged or fill material into the waters of U.S. under the Clean Water Act. The NLIP is located in Sacramento and Sutter Counties, California. SAFCA is requesting this permission and permit in order to complete construction along the Natomas Cross Canal and on the landside of the east levee of the Sacramento River.
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of U.S. Patent Concerning Remote Mosaic Imaging System Having High-Resolution, Wide Field-of-View and Low Bandwidth
Document Number: E8-1747
Type: Notice
Date: 2008-01-31
Agency: Department of Defense, Department of the Army, Army Department
In accordance with 37 CFR 404.6 and 404.7, announcement is made of the availability for licensing of the invention set forth in U.S. Patent No. 6,704,460 entitled ``Remote mosaic imaging system having high-resolution, wide field-of-view and low bandwidth,'' issued on March 9, 2004. The United States Government, as represented by the Secretary of the Army, has rights in this invention.
Privacy Act of 1974; System of Records
Document Number: E8-1746
Type: Notice
Date: 2008-01-31
Agency: Office of the Secretary, Department of Defense
The Defense Logistics Agency (DLA) is proposing to add a system of records to its inventory of record systems subject to the Privacy Act of 1974 (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
Document Number: E8-1745
Type: Notice
Date: 2008-01-31
Agency: Department of Defense, Department of the Navy, Navy Department
The Department of the Navy is amending a system of records notice in its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
Document Number: E8-1744
Type: Notice
Date: 2008-01-31
Agency: Office of the Secretary, Department of Defense
Defense Information Systems Agency proposes to add a system of records notice in its existing inventory of records systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
Document Number: E8-1743
Type: Notice
Date: 2008-01-31
Agency: Office of the Secretary, Department of Defense
The Office of the Secretary of Defense is altering a system of records notice in its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
Document Number: E8-1742
Type: Notice
Date: 2008-01-31
Agency: Office of the Secretary, Department of Defense
The Office of the Secretary of Defense is amending two systems of records notices in its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Federal Acquisition Regulation; FAR Case 2007-008, Limiting Length of Noncompetitive Contracts in “Unusual and Compelling Urgency” Circumstances
Document Number: E8-1681
Type: Proposed Rule
Date: 2008-01-31
Agency: General Services Administration, Agencies and Commissions, National Aeronautics and Space Administration, Department of Defense
The Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (Councils) are proposing to amend the Federal Acquisition Regulation (FAR) to limit the length of contracts awarded noncompetitively under unusual and compelling urgency circumstances to the minimum contract period necessary to meet the requirements, and no longer than one year, unless approved by the head of the contracting activity.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.