Army Department December 2010 – Federal Register Recent Federal Regulation Documents
Results 1 - 12 of 12
Intent To Prepare a Supplemental Draft Environmental Impact Statement for a Proposed Flood Risk Management Project on the Red River of the North in Fargo, ND, and Moorhead, MN
The St. Paul District of the U.S. Army Corps of Engineers (St. Paul District) will prepare a Supplement to the Draft Environmental Impact Statement and Feasibility Study (EIS/FS) for a Proposed Fargo- Moorhead Flood Risk Management Project on the Red River of the North in Fargo, ND, and Moorhead, MN (Proposed Fargo-Moorhead Project). On May 5, 2009, the St. Paul District published a notice of intent to prepare a Draft EIS/FS for a Proposed Fargo-Moorhead Project. On June 11, 2010, the St. Paul District published a notice of availability of the Draft EIS/FS. The U.S. Army Corps of Engineers has now decided to prepare a Supplemental Draft EIS/FS to further evaluate impacts of a Proposed Fargo-Moorhead Project and potential measures to mitigate for those impacts. The Supplemental Draft EIS/FS should be available for public review and comment in the spring of 2011.
Proposed Collection; Comment Request
In compliance with Section 3506(c)(2)(A) of the Paperwork Reduction Act of 1995, the Department of the Army announces a proposed public information collection and seeks public comment on the provisions thereof. Comments are invited on: (a) Whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed information collection; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the information collection on respondents, including through the use of automated collection techniques or other forms of information technology.
Availability for Exclusive, Non-Exclusive, or Partially-Exclusive Licensing of Inventions Concerning an Inactivated Dengue Virus Vaccine and a Method and Kit for Detection of Dengue Virus
Announcement is made of the availability for licensing of the invention set forth in U.S. Patent 6,254,873 which issued July 3, 2001, entitled ``Inactivated Dengue Virus Vaccine,'' and U.S. Patent 6,190,859, entitled ``Method and Kit for Detection of Dengue Virus,'' issued February 20, 2001. The United States Government, as represented by the Secretary of the Army, has rights to this invention.
Preparation of the PEIS for Modernization of Training Infrastructure at Pōhakuloa Training Area, HI
The United States Army Pacific (USARPAC) and United States Army Garrison, Hawai`i (USAG-HI) intend to prepare a Programmatic Environmental Impact Statement (PEIS) for modernizing training ranges, training support infrastructure (roads and utilities), and training support facilities in the cantonment area at P[omacr]hakuloa Training Area (PTA) to meet better the readiness needs of military units in Hawai`i. The PEIS will evaluate PTA's long-term vision for modernizing training ranges, training support infrastructure, and the cantonment area to improve a current shortfall in collective (group) live-fire training capabilities for units stationed in Hawai`i. The PEIS also includes an analysis for constructing and operating an Infantry Platoon Battle Area (IPBA) that would include an Infantry Platoon Battle Course (IPBC), Live-fire Shoothouse, and Military Operations on Urban Terrain (MOUT) facility. The IPBC would augment the existing non-standard IPBC (located at Range 10 on PTA), which is undersized and cannot be modernized in its current footprint. The Range 10 IPBC would continue to be used for non-standard collective live-fire training exercises. Many of the training ranges and infrastructure at PTA do not meet current doctrinal training and standard range design requirements. Many of the range assets at PTA also do not have sufficient throughput capacity to meet collective live-fire training requirements. Alternatives analyzed in the PEIS will consider modernizing the training ranges, training support infrastructure, and the cantonment area at PTA, and a No Action alternative. Under the No Action alternative, the Army would continue utilizing current training lands and facilities as efficiently as possible. The PEIS will also present a range of alternatives for the IPBA at either the Western Range Area of PTA, Charlie's Circle, or along the southwest side of Range 20, or to not build and operate the IPBA at all. The primary environmental issues to be analyzed in the PEIS include (but are not limited to) air quality, traffic, biological resources, cultural resources, public services and utilities, wildfires, and hazardous materials and waste. There could be significant impacts to cultural resources, air quality, and risk from igniting wildfires. Also, we anticipate that some federally-listed threatened or endangered plants would be affected. Predicted environmental impacts associated with implementing the initial range project of constructing and operating the IPBA will be analyzed to include an increase in vehicle traffic, air quality impacts, and live-fire activities at currently underutilized range locations at PTA. The proposed action may increase the risk of igniting wildfires or may result in a loss of cultural resources. The Army will identify mitigation measures that could be implemented to reduce or eliminate adverse impacts to the environmental resources.
Notice of Intent To Prepare a Programmatic Environmental Impact Statement (PEIS) for Land Acquisition, South Texas Training Center (STTC), in McMullen County, TX
The Department of the Army intends to prepare a PEIS to analyze the environmental and socioeconomic impacts associated with the proposed land acquisition and use of approximately 22,232 acres for implementation of an RPMP and mission activities in south Texas. The proposed land area, currently in private ownership, would become the STTC. This action will support the training requirements of the TXARNG units located in central and south Texas. The PEIS will analyze alternatives that are deemed feasible to meet the purpose and need for this Proposed Action.
Notice of Availability of the Final Environmental Impact Statement (FEIS) for Disposal and Reuse of Fort McPherson, GA
The Department of the Army announces the availability of the FEIS, which evaluates the potential environmental impacts associated with the disposal and reuse of Fort McPherson, Georgia.
Inland Waterways Users Board; Request for Nominations
Section 302 of Public Law 99-662 established the Inland Waterways Users Board. The Board is an independent Federal advisory committee. The Secretary of the Army appoints its 11 members. This notice is to solicit nominations for 10 (ten) appointments or reappointments to two-year terms that will begin after June 15, 2011.
Privacy Act of 1974; System of Records
Department of the Army proposes to alter a system of records notices in its existing inventory of record systems subject to the Privacy Act of 1974 (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
Department of the Army is to alter a system of records notices in its existing inventory of record systems subject to the Privacy Act of 1974 (5 U.S.C. 552a), as amended.
Intent To Grant an Exclusive License for U.S. Army Owned Inventions to Polymer Processing Institute
The Department of the Army announces that, unless there is an objection, after 15 days it contemplates granting an exclusive license to Polymer Processing Institute, a not-for-profit corporation having a place of business in the New Jersey Institute of Technology Campus in Newark, New Jersey, to produce the following inventions: ARDEC Reference 2006-043, and U.S. patent application 12/ 483420``Foamed Celluloid Mortar Propellant Increment Containers'' Inventors Ming-Wan Young, Costas G. Gogos; Niloufar Faridi; Linjie Zhu; Peter Bonnett; Howard Shimm; Elbert Caravaca; Joseph Palk. ARDEC Reference 2006-043 continuation (disclosure) ``Foamed Celluloid and Applications Therefor''. ARDEC Reference 2009-014 (disclosure)``Prepare Foamed Energetic Material at a High Production Rate''Inventors Linjie Zhu; Fei Shen; Ming-wan Young; Costas G. Gogos; Chong Peng; Mohamed Elalem; Joseph Palk; Howard (Howie) Shimm, Dale Conti; Elbert Caravaca; Peter Bonnett. ARDEC Reference 2009-015 (disclosure)``Prepare Foamed Energetic Material by Expandable Bead Methodology''Inventors Niloufar Faridi; Linjie Zhu; Ming-wan Young; Costas G. Gogos; Kuanyin Lin; Mohamed Elalem; Joseph Palk; Elbert Caravaca; Dale Conti. Any license granted shall comply with 35 U.S.C. 209 and 37 CFR part 404.
Notice of Intent to Prepare a Draft Environmental Impact Statement (EIS), Initiate the Public Scoping Period and Host Public Scoping Meetings for the Great Lakes and Mississippi River Interbasin Study (“GLMRIS”); Correction, Clarification, Extension of the Public Scoping Period and Announcement of Additional Public Scoping Meeting Locations
Reference the Notice of Intent published in the Federal Register on Tuesday, November 16, 2010, Volume 75, number 220, pages 69983-5. This notice contains corrections and clarifications to this November 16, 2010 notice, extends the public comment period and identifies additional locations for the GLMRIS public scoping meetings. The corrections are typographical errors found in the ``Scoping and Involvement'' section of the November 16, 2010 notice (75 FR 69983). Among the clarifications is information related to the timeframe of on- line registration for those wanting to make an oral comment at a public meeting, as well as the benefit of registering on-line. The registration process is found in the ``Scoping and Involvement'' section of the November 16, 2010 notice (75 FR 69983). For convenience, the SUPPLEMENTARY INFORMATION section of the November 16, 2010 notice (75 FR 69983) has been reprinted with corrections, clarifications, and new text announcing the locations where USACE will host scoping meetings and the extension of the public scoping period.
Availability for Exclusive, Non-Exclusive, or Partially-Exclusive Licensing of an Invention Concerning the Clinical Decision Model
Announcement is made of the availability for licensing of the invention set forth in patent application PCT/US2009/060850, entitled ``Clinical Decision Model,'' filed October 15, 2009. The United States Government, as represented by the Secretary of the Army, has rights to this invention.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.