Nuclear Regulatory Commission May 4, 2021 – Federal Register Recent Federal Regulation Documents

Southern Nuclear Operating Company, Inc; Vogtle Electric Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and Acceptance Criteria
Document Number: 2021-09312
Type: Notice
Date: 2021-05-04
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) staff has determined that specified inspections, tests, and analyses have been successfully completed, and that specified acceptance criteria are met for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4.
Environmental Assessments and Findings of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans
Document Number: 2021-09293
Type: Notice
Date: 2021-05-04
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is publishing this notice regarding the issuance of a final Environmental Assessment (EA) and a Finding of No Significant Impact (FONSI) for its review and approval of the initial and updated decommissioning funding plans (DFPs) submitted by independent spent fuel storage installation (ISFSI) licensees for each of the ISFSIs listed in the ``Discussion'' section of this document.
Palo Verde Nuclear Generating Station, Units 1, 2, and 3, and Independent Spent Fuel Storage Installation; Consideration of Approval of Transfer of Licenses
Document Number: 2021-09279
Type: Notice
Date: 2021-05-04
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC, the Commission) received and is considering approval of an indirect license transfer application filed by El Paso Electric Company (EPE) on March 18, 2021. The application seeks NRC approval of the indirect transfer of EPE's possession-only non-operating interests in Renewed Facility Operating License Nos. NPF-41, NPF-51, and NPF-74 for Palo Verde Nuclear Generating Station (Palo Verde), Units 1, 2, and 3, respectively, and the general license for the Palo Verde Independent Spent Fuel Storage Installation (ISFSI) as a result of the acquisition of an approximately 33.3 percent membership interest in IIF US Holding 2 GP, LLC (IIF US 2 GP)the general partner of IIF US Holding 2 LP (IIF US 2)by a private individual, Anne Cleary, subsequent to the retirement and relinquishment of an approximately 33.3 percent IIF US 2 GP membership interest held by Dennis Clarke.
Control of Heavy Loads at Nuclear Facilities
Document Number: 2021-09275
Type: Notice
Date: 2021-05-04
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft regulatory guide (DG), DG-1381, ``Control of Heavy Loads at Nuclear Facilities.'' This DG is a proposed new regulatory guide to endorse selected national consensus standards related to heavy load handling that replace NRC technical reports. The national consensus standards provide greater flexibility in the selection of lifting equipment and have incorporated recent operating experience to provide a more accurate risk-informed perspective of heavy load handling activities.
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information
Document Number: 2021-07669
Type: Notice
Date: 2021-05-04
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of one amendment request. The amendment request is for Susquehanna Steam Electric Station. For the amendment request, the NRC proposes to determine that it involves no significant hazards consideration (NSHC). Because the amendment request contains sensitive unclassified non-safeguards information (SUNSI), an order imposes procedures to obtain access to SUNSI for contention preparation.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.