Southern Nuclear Operating Company, Inc; Vogtle Electric Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and Acceptance Criteria, 23756-23757 [2021-09312]
Download as PDF
23756
Federal Register / Vol. 86, No. 84 / Tuesday, May 4, 2021 / Notices
FINDING OF NO SIGNIFICANT IMPACT—Continued
Finding of No Significant Impact ........................
Available Documents ..........................................
Dated: April 28, 2021.
For the Nuclear Regulatory Commission.
John B. McKirgan,
Chief, Storage and Transportation Licensing
Branch, Division of Fuel Management, Office
of Nuclear Material Safety and Safeguards.
[FR Doc. 2021–09293 Filed 5–3–21; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 52–025 and 52–026; NRC–
2008–0252]
khammond on DSKJM1Z7X2PROD with NOTICES
Southern Nuclear Operating Company,
Inc; Vogtle Electric Generating Plant,
Units 3 and 4; Inspections, Tests,
Analyses, and Acceptance Criteria
Nuclear Regulatory
Commission.
ACTION: Determination of the successful
completion of inspections, tests, and
analyses.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) staff has determined
SUMMARY:
VerDate Sep<11>2014
17:13 May 03, 2021
Jkt 253001
The proposed action does not require changes to the ISFSI’s licensed routine operations,
maintenance activities, or monitoring programs, nor does it require new construction or landdisturbing activities. The scope of the proposed action concerns only the NRC’s review and
approval of Florida Power & Light Company’s initial and NextEra Energy’s updated DFPs.
The scope of the proposed action does not include, and will not result in, the review and approval of decontamination or decommissioning activities or license termination for the ISFSI
or for other parts of Seabrook Station Unit No. 1. Therefore, the NRC staff determined that
approval of the initial and updated DFPs for the Seabrook Station Unit No. 1 ISFSI will not
significantly affect the quality of the human environment, and accordingly, the staff has concluded that a FONSI is appropriate. The NRC staff further finds that preparation of an environmental impact statement (EIS) is not required.
FPL, 2012. ISFSI DFPs, dated December 17, 2012. ADAMS Accession No. ML12354A134.
FPL, 2014. Reply to Request for Additional Information for Review of the DFPs Regarding the
ISFSI, dated August 12, 2014. ADAMS Accession No. ML14225A655.
FPL, 2017. Decommissioning Funding Status Reports/ISFSI Financial Assurance Update,
dated March 30, 2017. ADAMS Accession No. ML17093A722.
FPL, 2018. Response to Request for Additional Information Regarding Florida Power & Light/
NextEra Decommissioning Funding Updates for ISFSI, dated April 3, 2018. ADAMS Accession No. ML18095A057.
NextEra Energy, 2015. Decommissioning Funding Status Reports/ISFSI Financial Assurance
Update, dated March 27, 2015. ADAMS Accession No. ML15090A114.
U.S. Nuclear Regulatory Commission. 2003/08/31–NUREG–1748, ‘‘Environmental Review
Guidance for Licensing Actions Associated with NMSS Programs, Final Report.’’ Washington, DC, dated August 2003. ADAMS Accession No. ML032540811.
U.S. Nuclear Regulatory Commission. EA for Final Rule-Decommissioning Planning, dated
February 1, 2009. ADAMS Accession No. ML090500648.
U.S. Nuclear Regulatory Commission. Request for Additional Information for Review of the
DFPs for Florida Power & Light and NextEra Energy ISFSIs, dated May 23, 2014. ADAMS
Accession No. ML14143A141.
U.S. Nuclear Regulatory Commission. Note to File, Re: ESA Section 7 No Effect Determination for ISFSI DFP Reviews, dated May 15, 2017. ADAMS Accession No. ML17135A062.
U.S. Nuclear Regulatory Commission. Review of the Draft EA and FONSI for the Seabrook
Station ISFSI DFP, dated August 17, 2017. ADAMS Accession No. ML17226A329.
U.S. Nuclear Regulatory Commission. Request for Additional Information Regarding Florida
Power & Light/NextEra DFP Updates for St. Lucie, Units 1 and 2; Seabrook Station; Duane
Arnold Energy Center; and Point Beach, Units 1 and 2 ISFSIs, dated February 27, 2018.
ADAMS Package Accession No. ML18058A051.
U.S. Nuclear Regulatory Commission. Final EA and FONSI for Florida Power & Light Company’s Initial and NextEra Energy’s Updated DFPs Submitted in Accordance with 10 CFR
72.30(b) and (c) for Seabrook Station Unit No. 1 ISFSI, dated April 21, 2021. ADAMS Package Accession No. ML21062A145.
that specified inspections, tests, and
analyses have been successfully
completed, and that specified
acceptance criteria are met for the
Vogtle Electric Generating Plant (VEGP),
Units 3 and 4.
DATES: Determinations of the successful
completion of inspections, tests, and
analyses for VEGP Units 3 and 4 are
effective on the dates indicated in the
NRC staff’s verification evaluation forms
for the inspections, tests, analyses, and
acceptance criteria (ITAAC).
ADDRESSES: Please refer to Docket ID
NRC–2008–0252 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly available
information related to this document
using any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2008–0252. Address
questions about Docket IDs to Stacy
Schumann; telephone: 301–415–0624;
email: Stacy.Schumann@nrc.gov. For
technical questions, contact the
PO 00000
Frm 00087
Fmt 4703
Sfmt 4703
individual listed in the FOR FURTHER
section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. The ADAMS accession number
for each document referenced in this
document (if that document is available
in ADAMS) is provided the first time
that a document is referenced.
• Attention: The PDR, where you may
examine and order copies of public
documents, is currently closed. You
may submit your request to the PDR via
email at pdr.resource@nrc.gov or call 1–
800–397–4209 or 301–415–4737,
between 8:00 a.m. and 4:00 p.m. (EST),
INFORMATION CONTACT
E:\FR\FM\04MYN1.SGM
04MYN1
Federal Register / Vol. 86, No. 84 / Tuesday, May 4, 2021 / Notices
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT:
Cayetano Santos, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
7270, email: Cayetano.Santos@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Licensee Notification of Completion
of ITAAC
Southern Nuclear Operating
Company, Inc. (SNC) (hereafter called
the licensee) has submitted ITAAC
closure notifications (ICNs) under
§ 52.99(c)(1) of title 10 of the Code of
Federal Regulations (10 CFR), informing
the NRC that the licensee has
successfully performed the required
inspections, tests, and analyses, and that
the acceptance criteria are met for:
VEGP Unit 3 ITAAC
2.1.02.01 (12), 2.1.02.09b.ii (43),
2.1.02.12a.i (53), 2.1.03.13 (88),
2.2.01.07.i (107), 2.2.01.11a.i (114),
2.2.02.05c (130), 2.2.02.07a.iii (137),
2.2.03.08c.i.01 (177), 2.2.03.12a.iv (216),
2.2.04.01 (219), 2.2.05.01 (252),
2.3.01.03.ii (281), 2.3.02.08a.iii (303),
2.3.02.11a.i (309), 2.3.04.02.i (327),
2.3.04.02.ii (328), 2.3.04.04.i (330),
2.3.05.03b.iii (348), 2.3.06.12a.i (384),
2.3.08.02.i (415), 2.3.08.02.iii (417),
2.3.14.04 (480), 2.4.06.02 (504),
2.5.01.03b (512), 2.6.03.04b (602),
2.7.01.02a (678), 2.7.01.05.i (684),
3.3.00.02b (770), 3.3.00.02f (774),
3.3.00.02h (776), 3.3.00.07e (812),
3.3.00.13 (819), E.3.9.03.00.01 (847),
E.3.9.05.01.08 (856), E.3.9.07.01.02
(866), E.3.9.08.01.01 (870), and
E.3.9.08.01.02 (871).
VEGP Unit 4 ITAAC
2.3.03.03a (320) and 2.6.03.04b (602).
The ITAAC for VEGP Unit 3 are in
Appendix C of the VEGP Unit 3
combined license (ADAMS Accession
No. ML14100A106). The ITAAC for
VEGP Unit 4 are in Appendix C of VEGP
Unit 4 combined license (ADAMS
Accession No. ML14100A135).
khammond on DSKJM1Z7X2PROD with NOTICES
II. Licensee ITAAC Post-Closure
Notifications (IPCNs)
SNC has submitted an IPCN under 10
CFR 52.99(c)(2), informing the NRC of
new information that materially alters
the basis for determining either that
inspections, tests, or analyses was
performed as required, or that
acceptance criteria are met for:
VEGP Unit 4 ITAAC
2.3.05.03a.ii (344).
VerDate Sep<11>2014
17:13 May 03, 2021
Jkt 253001
III. NRC Staff Determination of
Completion of ITAAC
The NRC staff has determined that the
specified inspections, tests, and
analyses have been successfully
completed, and that the specified
acceptance criteria are met. The
documentation of the NRC staff’s
determination is in the ITAAC Closure
Verification Evaluation Form (VEF) for
each ITAAC. The VEF is a form that
represents the NRC staff’s structured
process for reviewing ICNs and IPCNs.
Each ICN presents a narrative
description of how the ITAAC was
completed. The NRC’s ICN review
process involves a determination on
whether, among other things: (1) Each
ICN provides sufficient information,
including a summary of the
methodology used to perform the
ITAAC, to demonstrate that the
inspections, tests, and analyses have
been successfully completed; (2) each
ICN provides sufficient information to
demonstrate that the acceptance criteria
of the ITAAC are met; and (3) any NRC
inspections for the ITAAC have been
completed and any ITAAC findings
associated with that ITAAC have been
closed. The NRC’s review process for
IPCNs is similar to that for ICNs but
focuses on how the licensee addressed
the new, material information giving
rise to the IPCN.
The NRC staff’s determination of the
successful completion of these ITAAC is
based on information available at this
time and is subject to the licensee’s
ability to maintain the condition that
the acceptance criteria are met. If the
NRC staff receives new information that
suggests the NRC staff’s determination
on any of these ITAAC is incorrect, then
the NRC staff will determine whether to
reopen that ITAAC (including
withdrawing the NRC staff’s
determination on that ITAAC). The NRC
staff’s determination will be used to
support a subsequent finding, pursuant
to 10 CFR 52.103(g), at the end of
construction that all acceptance criteria
in the combined license are met. The
ITAAC closure process is not finalized
for these ITAAC until the NRC makes an
affirmative finding under 10 CFR
52.103(g). Any future updates to the
status of these ITAAC can be found by
selecting the link ‘‘ITAAC Status
Report’’ on the NRC’s websites: https://
www.nrc.gov/reactors/new-reactors/colholder/vog3.html and https://
www.nrc.gov/reactors/new-reactors/colholder/vog4.html.
This notice fulfills the NRC staff’s
obligations under 10 CFR 52.99(e)(1) to
publish a notice in the Federal Register
of the NRC staff’s determination of the
PO 00000
Frm 00088
Fmt 4703
Sfmt 4703
23757
successful completion of inspections,
tests, and analyses.
Vogtle Electric Generating Plant Unit 3,
Docket No. 5200025
A complete list of the review status
for VEGP Unit 3 ITAAC, including the
submission date and ADAMS Accession
Number for each ICN received, the
ADAMS Accession Number for each
VEF, and the ADAMS Accession
Numbers for the inspection reports
associated with these specific ITAAC,
can be found by selecting the link
‘‘ITAAC Status Report’’ at the NRC’s
website https://www.nrc.gov/reactors/
new-reactors/col-holder/vog3.html.
Vogtle Electric Generating Plant Unit 4,
Docket No. 5200026
A complete list of the review status
for VEGP Unit 4 ITAAC, including the
submission date and ADAMS Accession
Number for each ICN and IPCN
received, the ADAMS Accession
Number for each VEF, and the ADAMS
Accession Numbers for the inspection
reports associated with these specific
ITAAC, can be found by selecting the
link ‘‘ITAAC Status Report’’ on the
NRC’s website https://www.nrc.gov/
reactors/new-reactors/col-holder/
vog4.html.
Dated: April 28, 2021.
For the Nuclear Regulatory Commission.
Omar R. Lopez-Santiago,
Chief, Vogtle Project Office, Office of Nuclear
Reactor Regulation.
[FR Doc. 2021–09312 Filed 5–3–21; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–528, 50–529, 50–530, and
72–44; NRC–2021–0100]
Palo Verde Nuclear Generating Station,
Units 1, 2, and 3, and Independent
Spent Fuel Storage Installation;
Consideration of Approval of Transfer
of Licenses
Nuclear Regulatory
Commission.
ACTION: Application for indirect transfer
of license; opportunity to comment,
request a hearing, and petition for leave
to intervene.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC, the Commission)
received and is considering approval of
an indirect license transfer application
filed by El Paso Electric Company (EPE)
on March 18, 2021. The application
seeks NRC approval of the indirect
transfer of EPE’s possession-only nonoperating interests in Renewed Facility
SUMMARY:
E:\FR\FM\04MYN1.SGM
04MYN1
Agencies
[Federal Register Volume 86, Number 84 (Tuesday, May 4, 2021)]
[Notices]
[Pages 23756-23757]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-09312]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 52-025 and 52-026; NRC-2008-0252]
Southern Nuclear Operating Company, Inc; Vogtle Electric
Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and
Acceptance Criteria
AGENCY: Nuclear Regulatory Commission.
ACTION: Determination of the successful completion of inspections,
tests, and analyses.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has
determined that specified inspections, tests, and analyses have been
successfully completed, and that specified acceptance criteria are met
for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4.
DATES: Determinations of the successful completion of inspections,
tests, and analyses for VEGP Units 3 and 4 are effective on the dates
indicated in the NRC staff's verification evaluation forms for the
inspections, tests, analyses, and acceptance criteria (ITAAC).
ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly available information related to this document
using any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0252. Address
questions about Docket IDs to Stacy Schumann; telephone: 301-415-0624;
email: [email protected]. For technical questions, contact the
individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The ADAMS accession number for each
document referenced in this document (if that document is available in
ADAMS) is provided the first time that a document is referenced.
Attention: The PDR, where you may examine and order copies
of public documents, is currently closed. You may submit your request
to the PDR via email at [email protected] or call 1-800-397-4209 or
301-415-4737, between 8:00 a.m. and 4:00 p.m. (EST),
[[Page 23757]]
Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: Cayetano Santos, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-7270, email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Licensee Notification of Completion of ITAAC
Southern Nuclear Operating Company, Inc. (SNC) (hereafter called
the licensee) has submitted ITAAC closure notifications (ICNs) under
Sec. 52.99(c)(1) of title 10 of the Code of Federal Regulations (10
CFR), informing the NRC that the licensee has successfully performed
the required inspections, tests, and analyses, and that the acceptance
criteria are met for:
VEGP Unit 3 ITAAC
2.1.02.01 (12), 2.1.02.09b.ii (43), 2.1.02.12a.i (53), 2.1.03.13
(88), 2.2.01.07.i (107), 2.2.01.11a.i (114), 2.2.02.05c (130),
2.2.02.07a.iii (137), 2.2.03.08c.i.01 (177), 2.2.03.12a.iv (216),
2.2.04.01 (219), 2.2.05.01 (252), 2.3.01.03.ii (281), 2.3.02.08a.iii
(303), 2.3.02.11a.i (309), 2.3.04.02.i (327), 2.3.04.02.ii (328),
2.3.04.04.i (330), 2.3.05.03b.iii (348), 2.3.06.12a.i (384),
2.3.08.02.i (415), 2.3.08.02.iii (417), 2.3.14.04 (480), 2.4.06.02
(504), 2.5.01.03b (512), 2.6.03.04b (602), 2.7.01.02a (678),
2.7.01.05.i (684), 3.3.00.02b (770), 3.3.00.02f (774), 3.3.00.02h
(776), 3.3.00.07e (812), 3.3.00.13 (819), E.3.9.03.00.01 (847),
E.3.9.05.01.08 (856), E.3.9.07.01.02 (866), E.3.9.08.01.01 (870), and
E.3.9.08.01.02 (871).
VEGP Unit 4 ITAAC
2.3.03.03a (320) and 2.6.03.04b (602).
The ITAAC for VEGP Unit 3 are in Appendix C of the VEGP Unit 3
combined license (ADAMS Accession No. ML14100A106). The ITAAC for VEGP
Unit 4 are in Appendix C of VEGP Unit 4 combined license (ADAMS
Accession No. ML14100A135).
II. Licensee ITAAC Post-Closure Notifications (IPCNs)
SNC has submitted an IPCN under 10 CFR 52.99(c)(2), informing the
NRC of new information that materially alters the basis for determining
either that inspections, tests, or analyses was performed as required,
or that acceptance criteria are met for:
VEGP Unit 4 ITAAC
2.3.05.03a.ii (344).
III. NRC Staff Determination of Completion of ITAAC
The NRC staff has determined that the specified inspections, tests,
and analyses have been successfully completed, and that the specified
acceptance criteria are met. The documentation of the NRC staff's
determination is in the ITAAC Closure Verification Evaluation Form
(VEF) for each ITAAC. The VEF is a form that represents the NRC staff's
structured process for reviewing ICNs and IPCNs.
Each ICN presents a narrative description of how the ITAAC was
completed. The NRC's ICN review process involves a determination on
whether, among other things: (1) Each ICN provides sufficient
information, including a summary of the methodology used to perform the
ITAAC, to demonstrate that the inspections, tests, and analyses have
been successfully completed; (2) each ICN provides sufficient
information to demonstrate that the acceptance criteria of the ITAAC
are met; and (3) any NRC inspections for the ITAAC have been completed
and any ITAAC findings associated with that ITAAC have been closed. The
NRC's review process for IPCNs is similar to that for ICNs but focuses
on how the licensee addressed the new, material information giving rise
to the IPCN.
The NRC staff's determination of the successful completion of these
ITAAC is based on information available at this time and is subject to
the licensee's ability to maintain the condition that the acceptance
criteria are met. If the NRC staff receives new information that
suggests the NRC staff's determination on any of these ITAAC is
incorrect, then the NRC staff will determine whether to reopen that
ITAAC (including withdrawing the NRC staff's determination on that
ITAAC). The NRC staff's determination will be used to support a
subsequent finding, pursuant to 10 CFR 52.103(g), at the end of
construction that all acceptance criteria in the combined license are
met. The ITAAC closure process is not finalized for these ITAAC until
the NRC makes an affirmative finding under 10 CFR 52.103(g). Any future
updates to the status of these ITAAC can be found by selecting the link
``ITAAC Status Report'' on the NRC's websites: https://www.nrc.gov/reactors/new-reactors/col-holder/vog3.html and https://www.nrc.gov/reactors/new-reactors/col-holder/vog4.html.
This notice fulfills the NRC staff's obligations under 10 CFR
52.99(e)(1) to publish a notice in the Federal Register of the NRC
staff's determination of the successful completion of inspections,
tests, and analyses.
Vogtle Electric Generating Plant Unit 3, Docket No. 5200025
A complete list of the review status for VEGP Unit 3 ITAAC,
including the submission date and ADAMS Accession Number for each ICN
received, the ADAMS Accession Number for each VEF, and the ADAMS
Accession Numbers for the inspection reports associated with these
specific ITAAC, can be found by selecting the link ``ITAAC Status
Report'' at the NRC's website https://www.nrc.gov/reactors/new-reactors/col-holder/vog3.html.
Vogtle Electric Generating Plant Unit 4, Docket No. 5200026
A complete list of the review status for VEGP Unit 4 ITAAC,
including the submission date and ADAMS Accession Number for each ICN
and IPCN received, the ADAMS Accession Number for each VEF, and the
ADAMS Accession Numbers for the inspection reports associated with
these specific ITAAC, can be found by selecting the link ``ITAAC Status
Report'' on the NRC's website https://www.nrc.gov/reactors/new-reactors/col-holder/vog4.html.
Dated: April 28, 2021.
For the Nuclear Regulatory Commission.
Omar R. Lopez-Santiago,
Chief, Vogtle Project Office, Office of Nuclear Reactor Regulation.
[FR Doc. 2021-09312 Filed 5-3-21; 8:45 am]