July 21, 2005 – Federal Register Recent Federal Regulation Documents

Results 101 - 150 of 181
District Export Council Nomination Opportunity
Document Number: 05-14376
Type: Notice
Date: 2005-07-21
Agency: Department of Commerce, International Trade Administration
The U.S. Department of Commerce is currently seeking expressions of interest from individuals in serving as a member of one of the fifty-nine District Export Councils (DECs) nationwide. The DECs are closely affiliated with the U.S. Export Assistance Centers (USEAC) of the U.S. Commercial Service. DECs combine the energy of more than 1,500 exporters and export service providers who promote U.S. exports. DEC members volunteer at their own expense.
Buckhorn Mountain Project a Supplement to the Final Environmental Impact Statement or for Crown Jewel Mine, Okanogan and Wenatchee National Forests, Okanogan County, WA.
Document Number: 05-14375
Type: Notice
Date: 2005-07-21
Agency: Department of Agriculture, Forest Service
On September 5, 2003, a Notice of Intent (NOI) to prepare an environmental impact statement (EIS) for the Buckhorn Mountain Project, a Supplement to the final environmental impact statement for the Crown Jewel Mine was published in the Federal Register (68 FR 52736). The Forest Service has decided to cancel the preparation of this EIS. The NOI is hereby rescinded.
Application for an Incidental Take Permit for the Lockheed Martin Corporation Project, Riverside County, CA
Document Number: 05-14374
Type: Notice
Date: 2005-07-21
Agency: Fish and Wildlife Service, Department of the Interior
In response to an application from the Lockheed Martin Corporation (applicant), the U.S. Fish and Wildlife Service (we, Service) is considering issuance of a 5-year incidental take permit for 1 covered species pursuant to section 10(a)(1)(B) of the Endangered Species Act of 1973, as amended (ESA). In response to this application, we are making it available for public review and comment. If approved, the permit would authorize take of species listed under the ESA incidental to otherwise lawful activities associated with proposed groundwater and soil contamination investigations on the 9,117-acre Potrero Creek and 2,500-acre Laborde Canyon sites, located in Beaumont, Riverside County, California.
Availability of an Environmental Assessment and Receipt of an Application for an Incidental Take Permit for the Hillcrest Travel Plaza in Fresno County, CA
Document Number: 05-14373
Type: Notice
Date: 2005-07-21
Agency: Fish and Wildlife Service, Department of the Interior
The Hillcrest Travel Plaza (applicant) has applied to the Fish and Wildlife Service (Service) for an incidental take permit pursuant to section 10(a)(1)(B) of the Endangered Species Act of 1973, as amended (Act). The Service is considering the issuance of a 10-year permit to the applicant that would authorize take of the endangered San Joaquin kit fox (Vulpes macrotis mutica) incidental to otherwise lawful activities. Such take would occur during the construction and operation of the applicant's proposed travel plaza in Fresno County, California. Construction of the proposed travel plaza would result in the loss of up to 9.27 acres of foraging and migration habitat for the San Joaquin kit fox. We request comments from the public on the permit application and an Environmental Assessment, both of which are available for review. The permit application includes the proposed Habitat Conservation Plan (Plan) and an accompanying Implementing Agreement. The Plan describes the proposed project and the measures that the applicant would undertake to minimize and mitigate take of the San Joaquin kit fox.
Notice of Availability of a Technical Agency Draft Recovery Plan for the Endangered Vermilion Darter for Review and Comment
Document Number: 05-14372
Type: Notice
Date: 2005-07-21
Agency: Fish and Wildlife Service, Department of the Interior
We, the Fish and Wildlife Service, announce the availability of the technical agency draft recovery plan for the vermilion darter (Etheostoma chermocki). The vermilion darter is found only in Turkey Creek, a tributary of the Locust Fork of the Black Warrior River, Jefferson County, Alabama. The species is threatened by degradation of water quality and substrate components of its habitat due to sedimentation and other pollutants. The technical agency draft recovery plan includes specific recovery objectives and criteria to be met in order to delist the vermilion darter under the Endangered Species Act of 1973, as amended (Act) (16 U.S.C. 1533 et seq.). We solicit review and comment on this technical agency draft recovery plan from local, State, and Federal agencies, and the public.
Proposed Data Collections Submitted for Public Comment and Recommendations
Document Number: 05-14371
Type: Notice
Date: 2005-07-21
Agency: Centers for Disease Control and Prevention, Department of Health and Human Services
Proposed Data Collections Submitted for Public Comment and Recommendations
Document Number: 05-14370
Type: Notice
Date: 2005-07-21
Agency: Centers for Disease Control and Prevention, Department of Health and Human Services
Proposed Data Collections Submitted for Public Comment and Recommendations
Document Number: 05-14369
Type: Notice
Date: 2005-07-21
Agency: Centers for Disease Control and Prevention, Department of Health and Human Services
FirstEnergy Nuclear Operating Company; Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Correction
Document Number: 05-14363
Type: Notice
Date: 2005-07-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
This document corrects a notice appearing in the Federal Register on June 21, 2005 (70 FR 35737), that incorrectly referenced the date of an amendment request. This action is necessary to correct an erroneous date. The correct date of the amendment request is April 13, 2005.
Union Electric Company; Notice of Withdrawal of Application for Amendment to Facility Operating License
Document Number: 05-14361
Type: Notice
Date: 2005-07-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request
Document Number: 05-14360
Type: Notice
Date: 2005-07-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC has recently submitted to OMB for review the following proposal for the collection of information under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). The NRC hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. 1. Type of submission, new, revision, or extension: Extension. 2. The title of the information collection: NRC Form 354, Data Report on Spouse'. 3. The form number if applicable: NRC Form 354. 4. How often the collection is required: On occasion. 5. Who will be required or asked to report: NRC employees, contractors, licensees, and applicants who marry after completing NRC's Personnel Security forms, or marry after having been granted an NRC access authorization or employment clearance. 6. An estimate of the number of annual responses: 60. 7. The estimated number of annual respondents: 60. 8. An estimate of the total number of hours needed annually to complete the requirement or request: 12 hours (.20 hour per response). 9. An indication of whether Section 3507(d), Pub. L. 104-13 applies: N/A. 10. Abstract: Completion of the NRC Form 354 is a mandatory requirement for NRC employees, contractors, licensees, and applicants who marry after submission of the Personnel Security Forms, or after receiving an access authorization or employment clearance to permit the NRC to assure there is no increased risk to the common defense and security. A copy of the final supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O-1 F21, Rockville, MD 20852. OMB clearance requests are available at the NRC worldwide Web site: https:// www.nrc.gov/public-involve/doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments and questions should be directed to the OMB reviewer listed below by August 22, 2005. Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after this date: John A. Asalone, Office of Information and Regulatory Affairs (3150- 0026), NEOB-10202, Office of Management and Budget, Washington, DC 20503. Comments can also be e-mailed to JohnA.Asalone@omb.eop.gov or submitted by telephone at (202) 395-4650. The NRC Clearance Officer is Brenda Jo. Shelton, 301-415-7233.
In the Matter of Richard M. Probasco; Confirmatory Order (Effective Immediately)
Document Number: 05-14359
Type: Notice
Date: 2005-07-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Office of Governmentwide Policy; Governmentwide Relocation Advisory Board; Charter Renewal
Document Number: 05-14357
Type: Notice
Date: 2005-07-21
Agency: General Services Administration, Agencies and Commissions
The Administrator of General Services has renewed the charter for the Governmentwide Relocation Advisory Board (Board) (see 69 FR 34676, June 22, 2004), extending it to December 31, 2005. The Board is used to obtain advice and recommendations on a wide range of relocation management issues. The Board's first priority is to review the current policies promulgated through the Federal Travel Regulation (FTR) for relocation allowances.
General Management Plan and Environmental Impact Statement, Lincoln Home National Historic Site, Illinois
Document Number: 05-14355
Type: Notice
Date: 2005-07-21
Agency: Department of the Interior, National Park Service
Pursuant to the National Environmental Policy Act of 1969, 42 U.S.C. 4332(C), the National Park Service is preparing an environmental impact statement for a general management plan for Lincoln Home National Historic Site (LIHO). The environmental impact statement will be approved by the Director, Midwest Region. The general management plan will prescribe the resource conditions and visitor experiences that are to be achieved and maintained at LIHO over the next 15 to 20 years. The clarification of what must be achieved according to law and policy will be based on review of the site's purpose, significance, special mandates, and the body of laws and policies directing park management. Based on determinations of desired conditions, the general management plan will outline the kinds of resource management activities, visitor activities, and development that would be appropriate in the future. A range of reasonable management alternatives will be developed through this planning process and will include, at a minimum, no action and the preferred alternative. Major issues to be addressed in the plan include: Issues surrounding preserving park resources (such as developing management strategies to preserve and maintain historic structures and cultural landscapes and protect archaeological sites in the face of a predicted increase in visitation); issues surrounding visitor understanding, education and appreciation of park resources (such as enhancing and expanding meaningful visitor experiences as alternatives to the LIHO tour); and, issues surrounding organizational effectiveness (such as identifying potential partnerships with the city of Springfield, the Abraham Lincoln Presidential Library and Museum and others). Dates: Any comments on the scope of issues to be addressed in the EIS should be received no later than November 15. Public meetings regarding the general management plan will be held during the scoping period. Specific dates, times, and locations will be made available in the local media, on the LIHO Web site (https://www.nps.gov/liho), on the National Park Service Planning, Environment and Public Comment (PEPC) Web site (parkplanning.nps.gov/publicHome.cfm), or by contacting the Superintendent.
Draft Environmental Impact Statement/
Document Number: 05-14354
Type: Notice
Date: 2005-07-21
Agency: Department of the Interior, National Park Service
Pursuant to 102(2)(C) of the National Environmental Policy Act of 1969 (Pub. L. 91-190, as amended), and the Council on Environmental Quality Regulations (40 CFR part 1500-1508), the National Park Service, Department of the Interior, has prepared a draft general management plan (GMP) and environmental impact statement (DEIS) for Minidoka Internment National Monument located in Jerome County, Idaho. In addition to a ``no-action'' alternative (which would maintain current management), the DEIS describes and analyzes three ``action'' alternatives which respond to the concerns and issues of the public identified during the extensive scoping process, as well as conservation planning requirements. These alternatives present varying management strategies for resource protection and preservation, education and interpretation, visitor use and facilities, land protection and boundaries, and long-term operations and management of the national monument. The potential environmental consequences of all the alternatives, and mitigation strategies, are identified and analyzed; a determination as to the ``environmentally preferred'' alternative is also provided in the DEIS. Scoping: A Notice of Intent announcing preparation of the DEIS and general management plan was published in the Federal Register on April 24, 2002. Extensive public involvement was deemed necessary for the success of this planning project, given the nature and sensitivity of the national monument's history, the speed in which the national monument was established, as well as the national monument's remote location. Public engagement and information measures have included public meetings and workshops, presentations and meetings with interested stakeholders, briefings with the Congressional delegation and State and Jerome county officials, newsletter mailings, local and regional and press releases, and Web site postings. Preceding the formal GMP planning process, National Park Service (NPS) staff conducted informational meetings about the national monument with Japanese American organizations, community organizations, various governmental entities, potential stakeholder groups, and individuals during the spring, summer and early fall of 2002. Approximately 50 meetings were held in Idaho, Washington, Oregon, and Alaska during this time, and approximately 2,000 people were contacted. The purpose of these initial meetings was to help characterize the scale and extent of the planning process. Thus far the NPS has encouraged the public to provide relevant information, issues and concerns during two formal public planning stages. The first stage, called Scoping, was intended to elicit issues, concerns, and suggestions to be addressed during the planning process. Nine public workshops were held in Idaho, Washington, and Oregon in November 2002; per Federal Register announcement dated November 19, 2002 the scoping period was extended an additional 30 days through December 31, 2002. Overall 250 people provided comments in workshops, and another 225 people provided written comments. The second stage, called Draft Alternatives, was intended to present the public with preliminary draft alternatives and invite comments on these alternatives. These draft alternatives were developed to address the specific issues and concerns that were raised by the public during the Scoping phase. Eleven public workshops were held in Idaho, Washington, and Oregon in July and August 2003 (215 people provided oral comments in the workshops, and another 50 people provided written comments). Proposed Plan and Alternatives: Alternative A is the ``no-action'' alternative and would continue current management practices. This alternative would provide general management guidance for incremental and minimal changes in park operations, staffing, visitor services, and facilities to accommodate visitors. While the historic resources of the site would continue to be protected, only minor additional site work would be anticipated under this alternative. The ``no-action'' alternative is the baseline for evaluating the changes and impacts of the three ``action'' alternatives. Alternative B emphasizes the development and extensive use of outreach and partnerships to assist the national monument staff in telling the Minidoka story to the American people. Off-site visitor education and interpretation would be conducted through diverse comprehensive programs developed in cooperation with partners, including school districts, museums, and educational and legacy organizations and institutions. Alternative B would focus on identifying off-site facilities for education and interpretation with minimal new development at the national monument site. Historic structures within the national monument would be adaptively reused for visitor and monument functions and for minimal administrative and operational needs. Key historic features would be delineated, restored, or rehabilitated. On-site education and interpretation would be accomplished through a range of self-exploratory visitor experiences. Alternative C, the ``agency preferred'' alternative, emphasizes on- site education and interpretation and the extensive treatment and use of cultural resources in telling the Minidoka story. On-site education and interpretation would be accomplished through a wide range of visitor experiences, including immersion into the historic scene, interaction with a variety of educational and interpretive media and personal services, and participation in creative and self-directed activities. Off-site visitor education and interpretation would be conducted through diverse programs developed in cooperation with partners, including school districts, museums, and educational and legacy organizations and institutions. Various preservation techniques would be used to protect and enhance historic resources, such as delineation, stabilization, restoration, rehabilitation, and reconstruction. These historic resources would be used for interpretive purposes to accurately and authentically convey the history and significance of the national monument. The establishment of one complete residential block in its original location and configuration would be the cornerstone of interpretive services and facilities at the national monument, essential for understanding and appreciation of the incarceration experience and the significance of the national monument. A visitor contact facility and maintenance area would be developed at the national monument by adaptively reusing existing historic buildings. There would be minimal new development. The preferred alternative would require congressional legislation to authorize a boundary expansion to include areas where barracks historically stood in order to reestablish a complete residential block. Additionally, the NPS would request congressional legislation to transfer the Minidoka Relocation Center landfill, located one mile north of the national monument, from the BLM to the NPS. Finally, changing the name to Minidoka National Historic Site would be recommended, to be more reflective of the site's historic value. Alternative D proposes several actions that would focus on education and interpretation on-site, specifically through the development of new visitor facilities. The 9-acre property would be used to develop new facilities and to provide space for a new national monument visitor center, education and research functions, along with a new memorial and garden. On-site education and interpretation would be accomplished through a wide range of visitor experiences, including interaction with a variety of educational and interpretive media, participation in creative and self-guided activities, and limited access of the historic scene. Visitor education programs, adaptive reuse of historic structures for park use, and the establishment of formal partnerships for education and outreach purposes would complement the new construction. Alternative D would focus on sound cultural resource management through preservation, restoration, rehabilitation, and reconstruction of certain historic features. Several actions would provide for the protection and enhancement of natural and scenic resources. Other actions would establish administrative and operational capabilities in terms of facilities and staffing. Most national monument staff activities would be on-site to manage resources and provide for visitor understanding and appreciation of the national monument. However, some off-site educational programs would complement the on-site programs through partnerships. Public Review and Comment: The Draft GMP/EIS is now available for public review. Interested persons and organizations wishing to express any new concerns or provide additional information are encouraged to obtain the document by contacting the Superintendent, Minidoka Internment National Monument, P.O. Box 570, Hagerman, Idaho 83332-0570, or via telephone at (208) 837-4793. The draft document may also be reviewed at area libraries, or can be obtained electronically via the monument's planning Web site at https://parkplanning.nps.gov/miin. In addition, the NPS will conduct public meetings in Idaho, Washington, and Oregon to facilitate public review and comment on the Draft GMP/ EIS. At this time, meetings are intended to be scheduled during the first two weeks of July, 2005. Confirmed details on meeting locations, times, etc will be announced via local and regional news media, will be posted on the monument's planning Web site, or can be obtained by contacting the Superintendent directly. A draft GMP/EIS newsletter will also be distributed widely. All written comments must be postmarked or transmitted not later than September 19, 2005, and should be submitted to the address noted above (or may also be submitted by e-mail to MIINGMP@nps.gov). All comments will become part of the public record. If individuals submitting comments request that their name or address be withheld from public disclosure, the request will be honored to the extent allowable by law. Such requests must be stated prominently in the beginning of the comments. There also may be circumstances wherein the NPS will withhold a respondent's identity as allowable by law. As always: the NPS will make available to public inspection all submissions from organizations or businesses and from persons identifying themselves as representatives or officials of organizations; and anonymous comments may not be considered. Decision: Following the opportunity to review the DEIS/GMP, all comments received will be carefully considered in preparing the final document. This is anticipated to be completed during fall 2006, and its availability will be similarly announced in the Federal Register and via local and regional press media. As a delegated EIS, the official responsible for the final decision is the Regional Director, Pacific West Region; subsequently the official responsible for implementation would be the Superintendent, Minidoka Internment National Monument.
Final Supplemental Environmental Impact Statement for the Elwha Ecosystem Restoration Implementation Final Environmental Impact Statement Olympic National Park, Clallam County, WA; Notice of Availability
Document Number: 05-14353
Type: Notice
Date: 2005-07-21
Agency: Department of the Interior, National Park Service
Pursuant to section 102(2)(c) of the National Environmental Policy Act of 1969 (Pub. L. 91-190, as amended) and corresponding Council of Environmental Quality implementing regulations (40 CFR part 1500-1508), the National Park Service, Department of the Interior and its cooperating agencies have finalized a supplement to the Elwha River Ecosystem Restoration Implementation final environmental impact statement (1996 Implementation EIS). Two dams built in the early 1900s block the Elwha River and substantially limit anadromous fish passage. A 1996 Implementation EIS (second of two EISs that examined how best to restore the Elwha River ecosystem and native anadromous fishery in Olympic National Park) identified dam removal as the preferred option and identified a particular set of actions to remove the dams. The release of sediment from behind the dams would result in sometimes severe impacts to water quality or the reliability of supply to downstream users during the 3-5 year dam removal impact period, which the 1996 Implementation EIS proposed mitigating through a series of specific measures (see below). However, since 1996, when the Record of Decision was signed, new research and changes unrelated to the project have necessitated re-analysis of these measures. The primary purpose of this supplemental EIS (SEIS) is to analyze the potential impacts of a new set of water quality and supply related mitigation measures. Background: Elwha Dam was built on the Elwha River in 1911 and Glines Canyon Dam in 1925, limiting anadromous fish to the lowest 4.9 miles of river and blocking access to more than 70 miles of Elwha River mainstem and tributary habitat. The two dams and their associated reservoirs have also inundated and degraded important riverine and terrestrial habitat and severely affected fisheries habitat through increased temperatures, reduced nutrients, the absence of spawning gravels downstream and other changes. Consequently, salmon and steelhead populations in the river have been considerably reduced or eliminated, and the Elwha River ecosystem within Olympic National Park significantly and adversely altered. In 1992, Congress enacted the Elwha River Ecosystem and Fisheries Restoration Act (Pub. L. 102-495) directing the Secretary of the Interior to fully restore the Elwha River ecosystem and native anadromous fisheries but also protecting municipal and industrial water users from the possible adverse impacts of dam removal. As noted above, the decisions associated with this process indicated removal of both dams was needed to fully restore the ecosystem. Impacts to water quality will result from the release of sediment which has accumulated behind the dams. Impacts to water supply will result from the release of fine sediment (i.e., silts and clays). These sediments can reduce yield by clogging the gravel that overlays subsurface intakes during periods of high turbidities. Increases in flooding or flood stage are also a likely result of dam removal, as sediments would replenish and raise the existing riverbed back to its pre-dam condition. The 1996 Implementation EIS proposed and analyzed numerous mitigation and flood controll measures to protect quality and ensure supply for each of the downstream users, which included: The installation of an infiltration gallery to collect water filtered from the riverbed; Open channel treatment of this water for industrial customers; Closure of the state chinook rearing channel during and for years following dam removal, with chinook production transferred to another state facility; The installation of a second subsurface Ranney collector on the opposite shore to maintain yield during meander away from the existing collector; A temporary package treatment plant to filter water from the Ranney wells during dam removal; Expansion of the tribal hatchery and of its infiltration gallery and drilling of groundwater wells to facilitate protection and production of Elwha anadromous fish for restoration, and; On-site flood protection for the Dry Creek Water Association wellfield, or connection of these users to the Point Angeles water system; The development of a mounded septic system on the Lower Elwha Klallam Reservation; and Strengthening and extension of the federal levee and other smaller levees and flood control structures. Continued study by the cooperating agencies since the 1996 Implementation EIS was finalized revealed the potential for unforeseen difficulties with some of the mitigation facilities, and identified different measures from those analyzed to resolve these difficulties. Further refining of the expected flood stage following the restoring of riverbed sediments also showed it would be higher in some areas of the river and lower in others than the original modeling predicted. In addition, changes in user needs resulting from factors unrelated to the project required a new look at some of the mitigation measures. For example, chinook salmon and bull trout have both been listed as threatened since 1997, resulting in the requirement to keep the state rearing facility open during dam removal. Also, the city of Port Angeles must now meet new standards for the treatment of its municipal supplies. In addition, an industrial customer (Rayonier) which required very high quality water for its operation has since closed. The low- lying lands of the Reservation have also been developed to such a degree since 1996 that a small mounded septic system would not be adequate. Proposal and Alternatives: The 1996 Implementation EIS focused on dam removal and sediment management and analyzed two action alternatives; it was tiered to an earlier programmatic EIS, which examined four options and a ``no action'' alternative for restoring the Elwha River ecosystem. Due to this extensive consideration of the overall project and its alternatives, the SEIS only analyzed the most preferable feasible alternative for mitigating impacts to water quality and supply in some cases. This is true of the facilities that would supply treated water for industrial, hatchery and municipal use. When several options with relatively equal value in protecting users from impacts to water quality or from flooding were available, each was analyzed in the SEIS. These include maintaining water quality for Dry Creek Water Association and Elwha Heights homeowners, upgrading the tribal hatchery, treating tribal wastewater, and providing flood protection mitigation for the tribal and other residents along the river. A discussion of alternatives for industrial, hatchery and municipal use that were not selected for analysis, and rationales for not carrying them further, is provided in the SEIS (Chapt.2) and in the Elwha River Water Quality Mitigation Project Planning Report (available at https://www.nps.gov/olym/elwha/home.htm). As documented in the Draft and Final SEIS, the proposal is deemed to be the ``environmentally preferred'' alternative; and it includes the following: The use of surface water rather than a subsurface infiltration gallery and additional Ranney well to supply the city's municipal and industrial customers, the tribal hatchery and the state chinook rearing channel. This change is intended to prevent ``blinding'', which research after 1996 found was likely to occur in any kind of subsurface water collecting facility. Blinding clogs and effectively seals the surface with fine sediment for a period of time, and can substantially reduce water yield. Removal of the existing rock dam and intake structure that currently supplies the city's industrial customers, and replacement with a graded fish riffle and weir structure to pass fish (``Elwha Water Surface Intake'' in the SEIS) and pool water. The existing intake will be replaced. A sediment removal facility (``Elwha Water Treatment Facility'' in the SEIS) built in the location of the existing industrial treatment channel on the east bank of the river, which will receive water for treatment from the weir and intake described above. This facility will supply industrial customers, and also at times a new water treatment facility during the 3-5 year dam removal impact period. A new permanent water treatment facility in Port Angeles (``Port Angeles Water Treatment Facility'' in the SEIS) adjacent to the city's existing landfill area, which will receive water from the sediment removal facility during and for a period of time following dam removal, and subsequently from the city's existing Ranney collector. Flood protection of the Dry Creek Water Association's existing wellfield. Connecting the Elwha Heights Water Association to the Dry Creek Water Association water delivery system to protect water quality of Elwha Heights water users. Relocation of the tribal hatchery to the Halberd parcel on Lower Elwha Klallam Tribal land, with water supplied from the Elwha Water Treatment Plant during the sediment release impact period. Keeping the state chinook rearing channel open during dam removal with water from the Elwha Water Treatment Plant during the sediment release impact period and creating a rearing pond on nearby Morse Creek as an additional rearing location for use during dam removal. Raising the federal levee an average of 3.3 feet (as compared to 2.5 feet in the 1996 Implementation EIS) and armoring with rock riprap where needed. The federal levee would be extended both north and south to provide additional protection from flooding following dam removal. The northward extension would be 450 feet in length; the southward extension would be a 1,650-foot route south and southeast across the Halberd property. This route includes use (raising and strengthening) of an existing levee haul road. A second levee across the river would also be raised. A series of small-scale flood protection measures, such as raising wellheads, dikes, roads or property to protect private citizens and existing facilities (Ranney collector, state WDFW fish-rearing facility, etc.) would be built. Most are similar or identical to those already analyzed in the 1996 Implementation EIS. Providing an on-reservation wastewater collection and treatment system to handle wastewater generated on the Lower Elwha Klallam Tribe's reservation. Sections removed from Glines Dam would be transported to a private facility to be crushed and recycled if economics indicate this would be advantageous. If not, concrete would be disposed of in open pit mines and other locations evaluated in the 1996 Implementation EIS. A trail, overlook and chemical toilet available to all (including disabled) visitors would be built to observe the removal of Elwha Dam and offer future interpretive opportunities. Property and/or conservation easements would be purchased to offset impacts of dam removal to trumpeter swans. Each of these facilities is funded wholly or in part by the federal government to the extent that they provide mitigation from the effects of dam removal. Additional funding may be provided by homeowners groups or by other interested parties if protection or improvement beyond that resulting directly from dam removal is desired. The No Action alternative is the same alternative as was discussed in the 1996 Implementation EIS; that is, no dam removal would take place. Because the dams would remain, water and flooding mitigation would not be needed. Public Response to Draft SEIS: The draft SEIS was released for public review and comment in January 2005. Comments were received until March 15, 2005. The NPS received 8 letters and an Enviromental Protection Agency (EPA) evaluation of LO, or lack of objections (also noticed in the Federal Register on April 8, 2005). Commenters included the Washington Department of Ecology, Washington Department of Natural Resources, the Lower Elwha Klallam Tribe, the city of Port Angeles, Dry Creek Water Association, Inc., American Whitewater, Trout Unlimited, and Mr. Russ Busch, Tribal Attorney. Synopsis of Comments and Changes in Final SEIS: The state agencies primarily reminded the NPS that various permits to begin dam removal would be required. Three individuals from the Tribe submitted requests for changed language reflecting updates since the draft SEIS was released. Because the Tribe and city of Port Angeles have been unable to reach a final agreement on the acceptance of tribal wastewater to the city's treatment facility, a second alternative was added. This alternative would be located on tribal land and would use a membrane bio-reactor technology and constructed wetland to treat wastewater and minimize impact of any effluent. Effluent would be allowed to infiltrate into soil underlying the wetland, or would be released into the Elwha River. This is the preferred alternative, rather than connecting to the city of Port Angeles' wastewater treatment facility. The Tribe has also evaluated two different alignments for extending the federal levee to the south that would better mitigate impacts from flooding at this end of the reservation. These have been added to the text of the final SEIS, although the preferred alternative is one that was analyzed in the draft SEIS. Additional information on fisheries and vegetation issues that have no bearing on the decision of a preferred alternative, but which add to the completeness of the final SEIS, was suggested by the third tribal individual. The city of Port Angeles' comments were wide ranging: some requested additional clarification on measures to mitigate impacts (to industrial users, for example); others mentioned permitting and final clearances that would be required from the city; some asked for additional impact information, such as to Orca whales, socioeconomics, and current traffic conditions; and others debated accuracy of statements in the draft SEIS. Although additional impact information and clarity on mitigation measures has been added where NPS felt it was incomplete or would be helpful, no changes to the preferred alternative were necessitated as a result of the city's comments. Mr. Busch asked for additional information to be added to the description and impacts of the No Action alternative, as well as to the impacts of the preferred alternative. The added information would not affect selection of the preferred alternative or alter it in any way. American Whitewater asked that the safety of the new surface diversion facility (the Elwha Surface Water Intake) be evaluated so that access for recreational uses would be maintained along the entire river, and Trout Unlimited indicated support for several of the features of the preferred alternative. The diversion would be able to pass kayaks and other craft safely, and signs to indicate any hazard areas would be used to direct recreational users. Distribution of Final SEIS: Those who commented during the review period on the draft SEIS will receive a complete final SEIS document, as will agencies and others on the park mailing list (as noted in chapter 5 of the final SEIS). Others may request a paper copy of the final SEIS, a CD of the final SEIS and/or a CD of the full 1996 Implementation EIS which the subject document supplements. Please specify which of these documents/CDs is desired when contacting the Elwha Project Management Office. Finally, both the final SEIS and 1996 Implementation EIS will be posted on the Elwha project Web site at https://www.nps.gov/olym/elwha/home.htm. Decision Process: Following release of the final SEIS the NPS will wait for a minimum period of at least 30 days from the date this notice is published in the Federal Register before making a final decision on which mitigation facilities it will select. Therefore if there are interested persons or organizations wishing to express any remaining concerns or comments on the content of the final SEIS, they should send them in writing to Dr. Brian Winter, Elwha Project Manager, at 826 East Front Street, Ste.A, Port Angeles, WA 98362; telephone inquires may be directed to (360) 565-1320. Faxed or electronic transmittals will be accept also (electronic comments should be sent to Brian Winter@nps.gov, and faxes may be sent to (360) 565-1325). If substantive new information is submitted that both (1) could not have been raised during scoping or the review of the draft SEIS and (2) that has bearing on the selection of the preferred mitigation alternative, the NPS will consider such information. Respondents are reminded that decisions or facts in the 1996 Implementation EIS are not subject to public review at this time. If any persons or organizations choose to respond, please include name and address (note that names and addresses of commenters become part of the public record). If individuals commenting request that their name or/ and address be withheld from public disclosure, it will be honored to the extent allowable by law. Such requests must be stated prominently in the beginning of the comments. There also may be circumstances wherein the NPS will withhold from the record a respondent's identity, as allowable by law. As always: the NPS will make available to public inspection all submissions from organizations or businesses and from persons identifying themselves as representatives or officials of organizations and businesses; and, anonymous comments may not be considered. As a delegated EIS, the official responsible for the final decision is the Regional Director, Pacific West Region. Subsequently the official responsible for implementing the selected mitigation alternative is the Superintendent, Olympic National Park.
Notice of Availability of the Draft General Management Plan and Draft Environmental Impact Statement for the Niobrara National Scenic River, NE
Document Number: 05-14352
Type: Notice
Date: 2005-07-21
Agency: Department of the Interior, National Park Service
Pursuant to section 102(2)(C) of the National Environmental Policy Act of 1969, the National Park Service (NPS) announces the availability of the draft general management plan and environmental impact statement (GMP/EIS) for the Niobrara National Scenic River (Scenic River).
Acadia National Park, Bar Harbor, ME, Acadia National Park Advisory Commission; Notice of Meeting
Document Number: 05-14351
Type: Notice
Date: 2005-07-21
Agency: Department of the Interior, National Park Service
Notice of Intent To Prepare a Draft Environmental Impact Statement (EIS) for the General Management Plan for Little River Canyon National Preserve, AL
Document Number: 05-14350
Type: Notice
Date: 2005-07-21
Agency: Department of the Interior, National Park Service
Pursuant to section 102(2)(C) of the National Environmental Policy Act of 1969, National Park Service (NPS) policy in Director's Order Number 2 (Park Planning) and Director's Order Number 12 (Conservation Planning, Environmental Impact Analysis, and Decisionmaking), the NPS will prepare an EIS for the General Management Plan (GMP) for Little River Canyon National Preserve. The authority for publishing this notice is contained in 40 CFR 1506.6. The NPS will conduct public scoping meetings in the local area to receive input from interested parties on issues, concerns, and suggestions pertinent to the management of Little River Canyon National Preserve. Suggestions and ideas for managing cultural and natural resource conditions and visitor experiences at the national preserve are encouraged. The comment period for each of these meetings will be announced at the meetings and will be published on the GMP web site for Little River Canyon National Preserve at https://www.nps.gov/sero/ planning/lirigmp/liriinfo.htm.
Proposed Information Collections; Comment Request
Document Number: 05-14349
Type: Notice
Date: 2005-07-21
Agency: Alcohol and Tobacco Tax and Trade Bureau, Department of Treasury, Department of the Treasury
As part of our continuing effort to reduce paperwork and respondent burden, and as required by the Paperwork Reduction Act of 1995, we invite comments on the proposed or continuing information collections listed below in this notice.
Proposed Changes to Arbitration Policies, Functions, and Procedures
Document Number: 05-14347
Type: Proposed Rule
Date: 2005-07-21
Agency: Federal Mediation and Conciliation Service, Agencies and Commissions
This document corrects Sec. 1404.5(b) and to add revisions to Sec. 1404.5(d)(7) in a proposed rule published in the Federal Register of July 7, 2005 (70 FR 39209), regarding Arbitration Policies, Functions and Procedures. The corrections clarify the Proof of Qualification needed to be on the Roster in Sec. 1404.5(b) and adds the non-payment of the annual listing fee in Sec. 1404.5(d)(7).
Petition for Waiver of Compliance
Document Number: 05-14346
Type: Notice
Date: 2005-07-21
Agency: Federal Railroad Administration, Department of Transportation
Petition for Waiver of Compliance
Document Number: 05-14345
Type: Notice
Date: 2005-07-21
Agency: Federal Railroad Administration, Department of Transportation
Petition for Waiver of Compliance
Document Number: 05-14344
Type: Notice
Date: 2005-07-21
Agency: Federal Railroad Administration, Department of Transportation
Petition for Waiver of Compliance
Document Number: 05-14343
Type: Notice
Date: 2005-07-21
Agency: Federal Railroad Administration, Department of Transportation
Petition for Waiver of Compliance
Document Number: 05-14342
Type: Notice
Date: 2005-07-21
Agency: Federal Railroad Administration, Department of Transportation
Petition for Waiver of Compliance
Document Number: 05-14341
Type: Notice
Date: 2005-07-21
Agency: Federal Railroad Administration, Department of Transportation
Petition for Waiver of Compliance
Document Number: 05-14340
Type: Notice
Date: 2005-07-21
Agency: Federal Railroad Administration, Department of Transportation
Modification of Legal Description of the Class E Airspace; Columbia Regional Airport, MO
Document Number: 05-14338
Type: Rule
Date: 2005-07-21
Agency: Federal Aviation Administration, Department of Transportation
An examination of controlled airspace for Columbia Regional Airport, MO, has revealed a discrepancy in the legal description of the Class E airspace area beginning at 700 feet above the surface. This action corrects that discrepancy by incorporating the coordinates of the Columbia Regional Airport ILS Localizer. Extensions to this Class E airspace area are described in relation to the Columbia Regional Airport ILS Localizer, therefore the coordinates for this facility must be included in the legal description to bring the airspace area into compliance with FAA directives.
Modification of Class E Airspace; Newton City-County Airport, KS
Document Number: 05-14337
Type: Rule
Date: 2005-07-21
Agency: Federal Aviation Administration, Department of Transportation
This action amends Title 14 Code of Federal Regulations, part 71 (14 CFR 71) by revising Class E airspace areas at Newton City-County Airport, KS. A modification of the Airport Reference Point (AFP) necessitates the revision of the Class E airspace area extending upward from 700 feet above ground level (AGL) at Newton, KS to conform to the criteria in FAA Orders.
Noise Exposure Map Notice; Receipt of Noise Compatibility Program and Request for Review for Albany International Airport
Document Number: 05-14336
Type: Notice
Date: 2005-07-21
Agency: Federal Aviation Administration, Department of Transportation
The Federal Aviation Administration (FAA) announces its determination that the noise exposure maps submitted by Albany County Airport Authority for Albany International Airport under provisions of Title I of the Aviation Safety and Noise Abatement Act of 1979 (Pub. L. 96-193) and 14 CFR part 150 are in compliance with applicable requirements. The FAA also announces that it is reviewing a proposed noise compatibility program that was submitted for Albany International Airport under Part 150 in conjunction with the noise exposure maps, and that this program will be approved or disapproved on or before January 4, 2006.
Amendment of Class E Airspace; Blairstown, NJ
Document Number: 05-14335
Type: Rule
Date: 2005-07-21
Agency: Federal Aviation Administration, Department of Transportation
This action amends the Class E airspace at Blairstown, NJ. Controlled airspace extending upward from 700 feet Above Ground Level (AGL) is needed to contain aircraft operating into Blairstown Airport, Blairstown, NJ, under Instrument Flight Rules (IFR).
Inspection and Maintenance Standards for Steam Locomotives
Document Number: 05-14334
Type: Rule
Date: 2005-07-21
Agency: Federal Railroad Administration, Department of Transportation
On April 19, 2005, FRA published a notice of proposed rulemaking (NPRM) proposing to correct an inadvertent, small omission from FRA Form 4 (Boiler Specification Card) in the Steam Locomotive Inspection and Maintenance Standards. The form is used to record information about inspections of steam locomotive boilers. FRA received two comments supporting the adoption of the proposed rule. Therefore, FRA adopts the proposed rule as a final rule.
Petition for Waiver of Compliance
Document Number: 05-14333
Type: Notice
Date: 2005-07-21
Agency: Federal Railroad Administration, Department of Transportation
Notice of Proposed Information Collection on PD&R and the Partnership for Advancing Technology in Housing Cooperative Research Efforts
Document Number: 05-14332
Type: Notice
Date: 2005-07-21
Agency: Department of Housing and Urban Development
The proposed information collection requirement described below will be submitted to the Office of Management and Budget (OMB) for review, as required by the Paperwork Reduction Act. The Department is soliciting public comments on the subject proposal.
Notice of Proposed Information Collection: PD&R and PATH Cooperative Research Program-Reporting Requirements
Document Number: 05-14331
Type: Notice
Date: 2005-07-21
Agency: Department of Housing and Urban Development
The proposed information collection requirement described below will be submitted to the Office of Management and Budget (OMB) for review, as required by Paperwork Reduction Act. The Department is soliciting public comments on the subject proposal.
Agency Information Collection Activities; Submission for Office of Management and Budget Review; Comment Request; General Licensing Provisions: Biologics License Application, Changes to an Approved Application, Labeling, Revocation and Suspension, and Forms FDA 356h and 2567
Document Number: 05-14330
Type: Notice
Date: 2005-07-21
Agency: Food and Drug Administration, Department of Health and Human Services
The Food and Drug Administration (FDA) is announcing that a proposed collection of information has been submitted to the Office of Management and Budget (OMB) for review and clearance under the Paperwork Reduction Act of 1995.
New Animal Drugs for Use in Animal Feeds; Roxarsone; Semduramycin
Document Number: 05-14329
Type: Rule
Date: 2005-07-21
Agency: Food and Drug Administration, Department of Health and Human Services
The Food and Drug Administration (FDA) is correcting the single-ingredient roxarsone Type A medicated article that may be used to formulate three-way, combination drug Type C medicated broiler chicken feeds containing semduramicin, virginiamycin, and roxarsone under a new animal drug application (NADA) recently approved for Phibro Animal Health. FDA is also amending the animal drug regulations to reflect two roxarsone Type A medicated articles approved under separate new animal drug applications (NADAs) for different conditions of use. This action is being taken to improve the accuracy of the agency's regulations.
Change of Address; Technical Amendment
Document Number: 05-14328
Type: Rule
Date: 2005-07-21
Agency: Food and Drug Administration, Department of Health and Human Services
The Food and Drug Administration (FDA) is amending its regulations to correct an incorrect address for the Center for Food Safety and Applied Nutrition (CFSAN). This action is editorial in nature and is intended to improve the accuracy of the agency's regulations.
Proposed Information Collection; Comment Request; U.S. Measurement System Biophotonics Survey
Document Number: 05-14327
Type: Notice
Date: 2005-07-21
Agency: Department of Commerce, National Institute of Standards and Technology
The Department of Commerce (DOC), as part of its continuing effort to reduce paperwork and respondent burden, invites the general public and other Federal agencies to comment on the continuing and proposed information collection, as required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)).
Submission for OMB Review; Comment Request
Document Number: 05-14326
Type: Notice
Date: 2005-07-21
Agency: Department of Commerce
Polychloroprene Rubber from Japan
Document Number: 05-14325
Type: Notice
Date: 2005-07-21
Agency: International Trade Commission, Agencies and Commissions
Submission for OMB Review; Comment Request
Document Number: 05-14324
Type: Notice
Date: 2005-07-21
Agency: Department of Commerce
Submission for OMB Review; Comment Request
Document Number: 05-14323
Type: Notice
Date: 2005-07-21
Agency: Department of Commerce
Drawbridge Operation Regulations; New Jersey Intracoastal Waterway, Manasquan River
Document Number: 05-14322
Type: Proposed Rule
Date: 2005-07-21
Agency: Coast Guard, Department of Homeland Security
The Coast Guard proposes to temporarily change the regulations that govern the operation of the Route 35 Bridge, at New Jersey Intracoastal Waterway (NJICW) mile 1.1, across Manasquan River, at Brielle, New Jersey. The bridge will be closed to navigation on three four-month closure periods beginning from 8 a.m. November 1, 2006 until 5 p.m. March 1, 2007; from 8 a.m. on November 1, 2007 until 5 p.m. March 1, 2008; and from 8 a.m. on November 1, 2008 until 5 p.m. March 1, 2009. The extensive structural, mechanical, and electrical repairs and improvements necessitate these closures.
Draft Voluntary Hazard Analysis and Critical Control Point Manuals for Operators and Regulators of Retail and Food Service Establishments; Availability
Document Number: 05-14321
Type: Notice
Date: 2005-07-21
Agency: Food and Drug Administration, Department of Health and Human Services
The Food and Drug Administration (FDA) is announcing the availability of two draft manuals entitled ``Managing Food Safety: A Manual for the Voluntary Use of HACCP Principles for Operators of Food Service and Retail Establishments'' (the ``Operator's Manual'') and ``Managing Food Safety: A Regulator's Manual for Applying HACCP Principles to Risk-Based Retail and Food Service Inspections and Evaluating Voluntary Food Safety Management Systems'' (the ``Regulator's Manual''). The Operator's Manual presents FDA's best advice to retail and foodservice operators for voluntarily implementing food safety management systems based on hazard analysis and critical control point (HACCP) principles to reduce the occurrence of foodborne illness risk factors. The Regulator's Manual is intended to assist State, local, and tribal regulatory authorities in identifying and assessing control of foodborne illness risk factors during routine inspections of retail and foodservice establishments by providing a risk-based inspection methodology.
Public Information Regulations
Document Number: 05-14320
Type: Rule
Date: 2005-07-21
Agency: Food and Drug Administration, Department of Health and Human Services
The Food and Drug Administration (FDA) is amending its public information regulations to implement more comprehensively the exemptions contained in the Freedom of Information Act (FOIA). This action incorporates exemptions one, two, and three of the FOIA into FDA's public information regulations. Exemption one applies to information that is classified in the interest of national defense or foreign policy. Exemption two applies to records that are related solely to an agency's internal personnel rules and practices. Exemption three incorporates the various nondisclosure provisions that are contained in other Federal statutes.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.