Union Electric Company; Notice of Withdrawal of Application for Amendment to Facility Operating License, 42111-42112 [05-14361]
Download as PDF
Federal Register / Vol. 70, No. 139 / Thursday, July 21, 2005 / Notices
operating experience report with the
Institute of Nuclear Power Operations.
4. As a result of Mr. Probasco’s
actions, he recognized an opportunity
for licensed operators at Pilgrim, as well
as licensed operators at other nuclear
facilities, to learn from his violation. Mr.
Probasco agreed to participate in future
training sessions at Pilgrim, including
crew training, teamwork training,
lifestyle training, and requalification
module development, to convey his
personal lessons-learned from this
matter. Mr. Probasco also agreed to
convey his personal lessons-learned to
other licensed operators at other nuclear
power plants by issuance of a letter,
within 90 days of issuance of the Letter
of Reprimand referenced in Section III.5
below, to the Communicator (the
publication of the Professional Reactor
Operator Society) requesting publication
therein, and making a presentation at a
future symposium at a meeting of the
Professional Reactor Operator Society, if
invited.
5. In light of the actions Mr. Probasco
has taken as described in Item 3 above,
those actions he has committed to do as
described in Item 4 above, and his
agreement to a Letter of Reprimand, the
NRC agrees not to issue an Order or a
Notice of Violation to Mr. Probasco.
However, Mr. Probasco agreed to
placement of this Letter of Reprimand
into ADAMS as a publically available
document, and its placement on the
NRC ‘‘Significant Enforcement
Actions—Individuals’’ Web site for a
period of 1 year (the period of time the
NRC routinely places Notices of
Violation at Severity Level III and above
to individuals).
Since Mr. Probasco has agreed to take
additional actions to address NRC
concerns, as set forth in Section III, the
NRC has concluded that its concerns
can be resolved through the NRC’s
confirmation of the commitments as
outlined in this Confirmatory Order.
I find that Mr. Probasco’s
commitments as set forth in Section III
above are acceptable. However, in view
of the foregoing, I have determined that
these commitments be confirmed by this
Confirmatory Order. Based on the above
and Mr. Probasco’s consent, this
Confirmatory Order is immediately
effective upon issuance.
V
Accordingly, pursuant to Sections
103, 161b, 161i, 161o, 182, and 186 of
the Atomic Energy Act of 1954, as
amended, and the Commission’s
regulations in 10 CFR 2.202 and 10 CFR
Part 55, it is hereby ordered, effective
immediately that:
VerDate jul<14>2003
19:42 Jul 20, 2005
Jkt 205001
1. Mr. Probasco participate in future
training sessions at Pilgrim, including
crew training, teamwork training,
lifestyle training, and requalification
module development, to convey his
personal lessons-learned from this
matter. Mr. Probasco will also convey
his personal lessons-learned to other
licensed operators at other nuclear
power plants by issuance of a letter,
within 90 days, to the Communicator
(the publication of the Professional
Reactor Operator Society) requesting
publication therein, and making a
presentation at a future symposium at a
meeting of the Professional Reactor
Operator Society, if invited.
2. Mr. Probasco provide the NRC with
one letter detailing his completion of all
actions specified in Item 1 above, within
30 days of completion of these actions.
The Director, Office of Enforcement
may relax or rescind, in writing, any of
the above conditions upon a showing by
Mr. Probasco of good cause.
VI
Any person adversely affected by this
Confirmatory Order, other than Mr.
Probasco, may request a hearing within
20 days of its issuance. Where good
cause is shown, consideration will be
given to extending the time to request a
hearing. A request for extension of time
must be made in writing to the Director,
Office of Enforcement, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555, and must include a statement
of good cause for the extension. Any
request for a hearing shall be submitted
to the Secretary, U.S. Nuclear
Regulatory Commission, ATTN: Chief,
Rulemaking and Adjudications Staff,
Washington, DC 20555. Copies of the
hearing request shall also be sent to the
Director, Office of Enforcement, U.S.
Nuclear Regulatory Commission,
Washington DC 20555, to the Assistant
General Counsel for Materials Litigation
and Enforcement, to the Director of the
Division of Regulatory Improvement
Programs at the same address, and to
Baxter. Because of continuing
disruptions in delivery of mail to United
States Government offices, it is
requested that answers and requests for
hearing be transmitted to the Secretary
of the Commission either by means of
facsimile transmission to 301–415–1101
or by e-mail to hearingdocket@nrc.gov
and also to the Office of the General
Counsel by means of facsimile
transmission to 301–415–3725 or e-mail
to OGCMailCenter@nrc.gov. If such a
person requests a hearing, that person
shall set forth with particularity the
manner in which his interest is
adversely affected by this Order and
PO 00000
Frm 00088
Fmt 4703
Sfmt 4703
42111
shall address the criteria set forth in 10
CFR 2.714(d).
If a hearing is requested by a person
whose interest is adversely affected, the
Commission will issue an Order
designating the time and place of any
hearing. If a hearing is held, the issue to
be considered at such hearing shall be
whether this Confirmatory Order shall
be sustained.
An answer or a request for a hearing
shall not stay the effectiveness date of
this Order.
Dated this 14th day of July, 2005.
For the Nuclear Regulatory Commission.
Michael R. Johnson,
Director, Office of Enforcement.
[FR Doc. 05–14359 Filed 7–20–05; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–483]
Union Electric Company; Notice of
Withdrawal of Application for
Amendment to Facility Operating
License
The U.S. Nuclear Regulatory
Commission (the Commission) has
granted the request of Union Electric
Company (the licensee) to withdraw its
June 27, 2003, revised by letter dated
December 19, 2003, application for
proposed amendment to Facility
Operating License No. NPF–30 for the
Callaway Plant, Unit 1, located in
Callaway County, Missouri.
The proposed amendment would
have revised Technical Specification
(TS) 3.8.1, ‘‘AC Sources—Operating.’’
The proposed change would revise
Required Actions A.3 and B.4 for TS
3.8.1 to allow a longer required Action
Completion Time (allowed outage time)
for an inoperable diesel generator, when
removing the diesel generator from
service to perform voluntary, planned
maintenance.
The Commission had previously
issued a Notice of Consideration of
Issuance of Amendment published in
the Federal Register on July 22, 2003
(68 FR 43396). However, by letter dated
June 28, 2005, the licensee withdrew the
proposed change.
For further details with respect to this
action, see the licensee’s application for
amendment dated June 27, 2003, as
revised by letter dated December 19,
2003, and the licensee’s letter dated
June 28, 2005, which withdrew the
application for a license amendment.
Documents may be examined, and/or
copied for a fee, at the NRC’s Public
Document Room (PDR), located at One
E:\FR\FM\21JYN1.SGM
21JYN1
42112
Federal Register / Vol. 70, No. 139 / Thursday, July 21, 2005 / Notices
White Flint North, Public File Area O1
F21, 11555 Rockville Pike (first floor),
Rockville, Maryland. Publicly available
records will be accessible electronically
from the Agencywide Documents
Access and Management Systems
(ADAMS) Public Electronic Reading
Room on the Internet at the NRC Web
site, https://www.nrc.gov/reading-rm/
adams/html. Persons who do not have
access to ADAMS or who encounter
problems in accessing the documents
located in ADAMS, should contact the
NRC PDR Reference staff by telephone
at 1–800–397–4209, or 301–415–4737 or
by e-mail to pdr@nrc.gov.
Dated in Rockville, Maryland, this 11th
day of July, 2005.
For the Nuclear Regulatory Commission.
Jack Donohew,
Senior Project Manager, Section 2, Project
Directorate IV, Division of Licensing Project
Management, Office of Nuclear Reactor
Regulation.
[FR Doc. 05–14361 Filed 7–20–05; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–346]
FirstEnergy Nuclear Operating
Company; Davis-Besse Nuclear Power
Station, Unit 1; Environmental
Assessment and Finding of No
Significant Impact
The U.S. Nuclear Regulatory
Commission (NRC) is considering
issuance of an exemption from Title 10
of the Code of Federal Regulations (10
CFR) Part 50, Appendix R, Section
III.G.3 for Facility Operating License No.
NPF–3, issued to FirstEnergy Nuclear
Operating Company (FENOC or the
licensee), for operation of the DavisBesse Nuclear Power Station, Unit 1
(DBNPS), located in Ottawa County,
Ohio. Therefore, as required by 10 CFR
51.21, the NRC is issuing this
environmental assessment and finding
of no significant impact.
Environmental Assessment
Identification of the Proposed Action
The proposed action would be an
exemption to certain requirements of 10
CFR Part 50, Appendix R, ‘‘Fire
Protection Program for Nuclear Power
Facilities Operating Prior to January 1,
1979,’’ Section III.G.3, ‘‘Fire Protection
of Safe Shutdown Capability.’’
Specifically, the licensee would be
exempt from the requirements to install
a fixed fire suppression system in Fire
Area HH for DBNPS and to install fire
detection in the approximately 4
VerDate jul<14>2003
19:42 Jul 20, 2005
Jkt 205001
percent of Fire Area HH not currently
covered by a fire detection system.
The proposed action is in accordance
with the licensee’s application dated
January 20, 2004 (Agencywide
Documents Access Management System
(ADAMS) Accession No.
ML0420220470), as supplemented by
letters dated September 3, 2004
(ADAMS Accession No.
ML0402520326), and February 25, 2005
(ADAMS Accession No. ML050610249).
The Need for the Proposed Action
The requirements specified in 10 CFR
50, Appendix R, Section III.G.3, require
fire detection and fixed fire suppression
in areas for which alternate shutdown
capability is provided. The total
combustible loading in Fire Area HH is
less than 20,000 BTU/ft 2. Existing fire
protection capability in the area consists
of a fire detection system, protecting
Room 603 (approximately 96 percent of
Fire Area HH, not including Rooms
603A and 603B) and manual fire
suppression capability consisting of
portable fire extinguishers and
standpipe hose stations for the
protection of the entire area. The
exemption is needed because the
current fire detection and fire
suppression capability is sufficient to
protect the health and safety of the
public.
Environmental Impacts of the Proposed
Action
The NRC has completed its evaluation
of the proposed action and concludes
that the proposed exemption does not
involve radioactive wastes, release of
radioactive material into the
atmosphere, solid radioactive waste, or
liquid effluents released to the
environment. The details of the staff’s
safety evaluation will be provided in the
exemption that will be issued as part of
the letter to the licensee approving the
exemption to the regulation.
The DBNPS systems were evaluated
in the Final Environmental Statement
(FES) dated October 1975 (NUREG 75/
097). The proposed exemption will not
involve any change in the waste
treatment systems described in the FES.
The proposed action will not
significantly increase the probability or
consequences of accidents, no changes
are being made in the types of effluents
that may be released off site, and there
is no significant increase in
occupational or public radiation
exposure. Therefore, there are no
significant radiological environmental
impacts associated with the proposed
action.
With regard to potential nonradiological impacts, the proposed
PO 00000
Frm 00089
Fmt 4703
Sfmt 4703
action does not have a potential to affect
any historic sites. It does not affect nonradiological plant effluents and has no
other environmental impact. Therefore,
there are no significant non-radiological
environmental impacts associated with
the proposed action.
Accordingly, the NRC concludes that
there are no significant environmental
impacts associated with the proposed
action.
Environmental Impacts of the
Alternatives to the Proposed Action
As an alternative to the proposed
action, the staff considered denial of the
proposed action (i.e., the ‘‘no-action’’
alternative). Denial of the application
would result in no change in current
environmental impacts. The
environmental impacts of the proposed
action and the alternative action are
similar.
Alternative Use of Resources
The action does not involve the use of
any different resource than those
previously considered in the DBNPS
FES dated October 1975.
Agencies and Persons Consulted
On April 8, 2005, the staff consulted
with Ohio State official, Ms. Carol
O’Claire of the Ohio Emergency
Management Agency, regarding the
environmental impact of the proposed
action. The State official had no
comments.
Finding of No Significant Impact
On the basis of the environmental
assessment, the NRC concludes that the
proposed action will not have a
significant effect on the quality of the
human environment. Accordingly, the
NRC has determined not to prepare an
environmental impact statement for the
proposed action.
For further details with respect to the
proposed action, see the licensee’s
letters dated January 20, 2004,
September 3, 2004, and February 25,
2005. Documents may be examined,
and/or copied for a fee, at the NRC’s
Public Document Room (PDR), located
at One White Flint North, Public File
Area O1 F21, 11555 Rockville Pike (first
floor), Rockville, Maryland. Publicly
available records will be accessible
electronically from the ADAMS Public
Electronic Reading Room on the Internet
at the NRC Web site, https://
www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS, should contact the NRC PDR
Reference staff by telephone at 1–800–
E:\FR\FM\21JYN1.SGM
21JYN1
Agencies
[Federal Register Volume 70, Number 139 (Thursday, July 21, 2005)]
[Notices]
[Pages 42111-42112]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-14361]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-483]
Union Electric Company; Notice of Withdrawal of Application for
Amendment to Facility Operating License
The U.S. Nuclear Regulatory Commission (the Commission) has granted
the request of Union Electric Company (the licensee) to withdraw its
June 27, 2003, revised by letter dated December 19, 2003, application
for proposed amendment to Facility Operating License No. NPF-30 for the
Callaway Plant, Unit 1, located in Callaway County, Missouri.
The proposed amendment would have revised Technical Specification
(TS) 3.8.1, ``AC Sources--Operating.'' The proposed change would revise
Required Actions A.3 and B.4 for TS 3.8.1 to allow a longer required
Action Completion Time (allowed outage time) for an inoperable diesel
generator, when removing the diesel generator from service to perform
voluntary, planned maintenance.
The Commission had previously issued a Notice of Consideration of
Issuance of Amendment published in the Federal Register on July 22,
2003 (68 FR 43396). However, by letter dated June 28, 2005, the
licensee withdrew the proposed change.
For further details with respect to this action, see the licensee's
application for amendment dated June 27, 2003, as revised by letter
dated December 19, 2003, and the licensee's letter dated June 28, 2005,
which withdrew the application for a license amendment. Documents may
be examined, and/or copied for a fee, at the NRC's Public Document Room
(PDR), located at One
[[Page 42112]]
White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first
floor), Rockville, Maryland. Publicly available records will be
accessible electronically from the Agencywide Documents Access and
Management Systems (ADAMS) Public Electronic Reading Room on the
Internet at the NRC Web site, https://www.nrc.gov/reading-rm/adams/html.
Persons who do not have access to ADAMS or who encounter problems in
accessing the documents located in ADAMS, should contact the NRC PDR
Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by
e-mail to pdr@nrc.gov.
Dated in Rockville, Maryland, this 11th day of July, 2005.
For the Nuclear Regulatory Commission.
Jack Donohew,
Senior Project Manager, Section 2, Project Directorate IV, Division of
Licensing Project Management, Office of Nuclear Reactor Regulation.
[FR Doc. 05-14361 Filed 7-20-05; 8:45 am]
BILLING CODE 7590-01-P