Current through Bulletin 2024-06, March 15, 2024
(1) The Certifications listed in this section
must include the following information:
(a)
name, address, and telephone number of the operator of the ropeway, name of
ropeway supervisor, operator's designation of the ropeway;
(b) designated certifying
statement;
(c) a certification of
design and construction must also include the name, address, seal, and Utah
license of the qualified engineer making the certification; and
(d) a certification of "As-Built" profile
must also include the name, address, seal, and Utah license of the Qualified
Engineer or Land Surveyor making the certification.
(2) A Certification of Compliance for
Passenger Ropeway must be made on the Application for Certificate of
Registration for the Ropeway.
(a) The
certification must be signed and dated by the ropeway owner or area
operator.
(b) The certification
must include the following statement: "I certify that the reports, requests,
and certificates attached hereto were provided and signed by the persons
required by law to provide them. The required ropeway inspection was completed
and deficiencies noted in the inspection report have been corrected with the
exception of those listed in the Request for Exception from Standards for
Passenger Ropeway."
(3)
A Certification of Ropeway Design for New or Modified Passenger Ropeways must
be submitted.
(a) The Qualified Engineer in
responsible charge of the design must certify to the Committee that the design,
plans, and specifications conform to the Utah Passenger Ropeway Safety Act, the
Governing Standard, and this rule .
(b) The Certification must be submitted
before the performance of the Acceptance Inspection and Test.
(c) The certification must state the
following:
"I hereby certify that the design for this ropeway or ropeway
modification is in complete compliance with the Utah Passenger Ropeway Safety
Act, Governing Standard, and the Utah Ropeway Operation Safety Rule."
(d) This statement must be placed
on the top of the drawing packet and signed and sealed by the qualified
engineer. Each additional sheet of this drawing packet must be sealed by the
qualified engineer.
(e) The
drawings and specifications must include the quality assurance methods used for
the evaluation of the re-used components and must be submitted for review a
minimum of 30 days before installation. Any component on the Utah Passenger
Ropeway Safety Committee Lift Data Form must be addressed.
(4) A Certification of Construction for
passenger ropeways must be submitted by a qualified engineer directly
responsible for the construction for the ropeway.
(a) The Certification must be submitted
before the performance of the Acceptance Inspection and Test.
(b) The certification must state the
following:
"I hereby certify that the construction and installation has
been completed in accordance with the drawings and specifications issued for
this ropeway or ropeway modification by the Qualified Design Engineer."
(5) A Certification of
as-built profile for the Passenger Ropeway must be submitted by a Qualified
Engineer or Land Surveyor licensed in Utah.
(a) The as-built profile must be submitted
before the performance of the Acceptance Inspection and Test.
(b) The certification must state the
following:
"I hereby certify that the attached as-built profile of the
herein-identified ropeway is as represented on the attached profile drawing and
that the completed ropeway conforms to the profile as identified in the plans
and specifications prepared by the Qualified Design Engineer."