Western Area Power Administration May 2008 – Federal Register Recent Federal Regulation Documents

Findings for the Sacramento Area Voltage Support Project (DOE/EIS-0323S1)
Document Number: E8-9956
Type: Notice
Date: 2008-05-06
Agency: Department of Energy, Western Area Power Administration
Western Area Power Administration (Western) plans to construct a new double-circuit, 230-kilovolt (kV) transmission line, approximately 31 miles long, between Western's O'Banion Substation and the area just south of the Sacramento Municipal Utility District's (SMUD) Elverta Substation and reconstruct SMUD's existing 230 kV/115 kV transmission line between SMUD's Elverta and Natomas substations. The Sacramento Area Voltage Support (SVS) Project (Project) would be located in Sutter, Placer, and Sacramento counties in California. Western proposes to build the Project to provide needed transmission system additions and upgrades to maintain system voltage stability, reliability, and security. Western evaluated seven action alternatives and the No Action Alternative in its supplemental environmental impact statement (SEIS). Of these, Alternative B was selected as both the Preferred Alternative and the Environmentally Preferred Action Alternative.
2015 Resource Pool
Document Number: E8-9816
Type: Notice
Date: 2008-05-05
Agency: Department of Energy, Western Area Power Administration
The Western Area Power Administration (Western), a Federal power marketing administration of the U.S. Department of Energy (DOE), published its 2004 Power Marketing Plan (Marketing Plan) for Western's Sierra Nevada Customer Service Region (SNR) in the Federal Register on June 25, 1999 (64 FR 34417). The Marketing Plan specifies the terms and conditions under which Western will market power from the Central Valley Project (CVP) and the Washoe Project beginning January 1, 2005, and continuing through December 31, 2024. The Marketing Plan provides for a 2015 Resource Pool of up to 2 percent of SNR's marketable power resources. The 2015 Resource Pool will be available for power allocations to preference entities that meet the Eligibility Criteria. This notice begins the public process to establish the resources available and to revise the Eligibility Criteria provided in the Marketing Plan for the 2015 Resource Pool. Once Western establishes the final amount of power to be made available under the 2015 Resource Pool and the associated Eligibility Criteria, preference entities who wish to apply for an allocation of power from SNR must submit formal applications in response to Western's Call for 2015 Resource Pool Applications to be published under a separate notice.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.