Notice of Solicitation of Applications for Stakeholder Representative Members of the Missouri River Recovery Implementation Committee
The Commander of the Northwestern Division of the U.S. Army Corps of Engineers (Corps) is soliciting applications to fill vacant stakeholder representative member positions on the Missouri River Recovery Implementation Committee (MRRIC). Members are sought to fill vacancies on a committee to represent various categories of interests within the Missouri River basin. The MRRIC was formed to advise the Corps on a study of the Missouri River and its tributaries and to provide guidance to the Corps with respect to the Missouri River recovery and mitigation activities currently underway. The Corps established the MRRIC as required by the U.S. Congress through the Water Resources Development Act of 2007 (WRDA), Section 5018.
Notice of Solicitation of Applications for Stakeholder Representative Members of the Missouri River Recovery Implementation Committee
The Commander of the Northwestern Division of the U.S. Army Corps of Engineers (Corps) is soliciting applications to fill vacant stakeholder representative member positions on the Missouri River Recovery Implementation Committee (MRRIC). Members are sought to fill vacancies on a committee to represent various categories of interests within the Missouri River basin. The MRRIC was formed to advise the Corps on a study of the Missouri River and its tributaries and to provide guidance to the Corps with respect to the Missouri River recovery and mitigation activities currently underway. The Corps established the MRRIC as required by the U.S. Congress through the Water Resources Development Act of 2007 (WRDA), Section 5018.
Notice of Intent To Prepare a Supplemental Joint Draft Environmental Impact Statement/Environmental Impact Report for the 2007 Folsom Dam Safety/Flood Damage Reduction Environmental Impact Statement/Environmental Impact Report
The U.S. Army Corps of Engineers, Sacramento District (USACE) intends to prepare a Supplemental Joint Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the 2007 Folsom Dam Safety/Flood Damage Reduction EIS/EIR (hereafter referred to as the Project). USACE will serve as lead National Environmental Policy Act (NEPA) agency and the Central Valley Flood Protection Board (CVFPB) will serve as lead agency for compliance with the California Environmental Quality Act (CEQA). The Project was originally authorized in the 2004 Energy and Water Development Appropriations Act (EWDAA) and was later reauthorized in the 2007 Water Resources Development Act (WRDA). The Project is authorized for 4 components: (1) Emergency spillway gate modifications, (2) raising the right and left wings of the main dam, Mormon Island Auxiliary Dam (MIAD), and the reservoir dikes (1-8) by 3.5 feet, (3) temperature control shutter automation and reconfiguration, and 4) downstream ecosystem restoration of Bushy Lake and Woodlake. The Supplemental Draft Joint SEIS/SEIR will address two components of the authorized project, specifically the emergency spillway gate modifications and the 3.5 foot raise. These flood damage reduction components of the Project enhance the utilization of the existing surcharge flood storage space (temporary water storage space utilized during rare flood events), as well as increase the surcharge flood storage capacity of the reservoir.