Southeastern Power Administration 2017 – Federal Register Recent Federal Regulation Documents

Georgia-Alabama-South Carolina System
Document Number: 2017-18424
Type: Notice
Date: 2017-08-31
Agency: Department of Energy, Southeastern Power Administration
The Deputy Secretary, Department of Energy, confirmed and approved, on an interim basis new rate schedules SOCO-1-F, SOCO-2-F, SOCO-3-F, SOCO-4-F, ALA-1-O, Duke-1-F, Duke-2-F, Duke-3-F, Duke-4-F, Santee-1-F, Santee-2-F, Santee-3-F, Santee-4-F, SCE&G-1-F, SCE&G-2-F, SCE&G-3-F, SCE&G-4-F, Pump-1-A, and Replacement-1. These rate schedules are applicable to Southeastern power sold to existing preference customers in Alabama, Florida, Georgia, Mississippi, North Carolina, and South Carolina. The rate schedules are approved on an interim basis through September 30, 2022, and are subject to confirmation and approval by the Federal Energy Regulatory Commission (FERC) on a final basis.
Proposed Rate Adjustment, Public Forum, and Opportunities for Public Review and Comment for Georgia-Alabama-South Carolina System of Projects
Document Number: 2017-06860
Type: Notice
Date: 2017-04-06
Agency: Department of Energy, Southeastern Power Administration
Southeastern Power Administration (Southeastern) proposes to revise existing schedules of rates and charges applicable to the sale of power from the Georgia-Alabama-South Carolina System of Projects effective for a 5-year period, October 1, 2017, through September 30, 2022. Additionally, opportunities will be available for interested persons to review the present rates and the proposed rates and supporting studies, to participate in a public forum and to submit written comments. Southeastern will evaluate all comments received in this process.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.