Office of Energy Efficiency and Renewable Energy December 2011 – Federal Register Recent Federal Regulation Documents

Nationwide Categorical Waivers Under Section 1605 (Buy American) of the American Recovery and Reinvestment Act of 2009 (Recovery Act)
Document Number: 2011-33416
Type: Notice
Date: 2011-12-29
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The U.S. Department of Energy (DOE) is hereby granting a nationwide limited waiver of the Buy American requirements of section 1605 of the Recovery Act under the authority of Section 1605(b)(2), (iron, steel, and the relevant manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality), with respect to Recovery Act projects funded by EERE for (1) Multi-colored Full Wave Rectified strands of 5mm, conical shaped LED mini bulbs in molded sockets with 4'' spacing between bulbs, UL listed with a minimum 50,000 hour lamp life; (2) Ancillary items needed for a T-12 to T-8 retrofit, including the ballast disconnects, ancillary wiring and welding materials where needed, and the spacing clip to accommodate T-8 bulbs into a T-12 fixture; and (3) Roof integrated flat plate collectors producing 1250 btu/square foot, where the installation requires a roof integrated solar collector to meet local historic preservation or local building standards.
Nationwide Categorical Waivers Under Section 1605 (Buy American) of the American Recovery and Reinvestment Act of 2009 (Recovery Act)
Document Number: 2011-33415
Type: Notice
Date: 2011-12-29
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The U.S. Department of Energy (DOE) is hereby granting a nationwide limited waiver of the Buy American requirements of section 1605 of the Recovery Act under the authority of Section 1605(b)(2), (iron, steel, and the relevant manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality), with respect to Recovery Act projects funded by EERE for (1) Absorption chillers rated at 205 and 250 tons; (2) Thermostatic Regulator Valves that regulate the flow of hot water or low pressure steam through free-standing radiators, baseboards, or convectors in hot water and two-pipe steam systems; (3) 28 and 30 W 180 degree LED replacement bulbs for HID street lights; (4) 100% Oil free rotary screw variable speed drive water cooled air compressor with a factory installed dryer capable of supplying air at
Limited Public Interest Waiver Under Section 1605 (Buy American) of the American Recovery and Reinvestment Act of 2009 (Recovery Act)
Document Number: 2011-33407
Type: Notice
Date: 2011-12-29
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The U.S. Department of Energy (DOE) is hereby granting a determination of inapplicability (unreasonable cost waiver) of section 1605 of the American Reinvestment and Recovery Act of 2009 (Recovery Act Buy American provisions) to the Commonwealth Utilities Corporation's (CUC) located in the Commonwealth of the Northern Mariana Islands (CNMI), recipient of the EECBG grant DE-EE0000762, for 5 diesel engine radiators to be installed at the CUC's main power plant located in Saipan, CNMI. This waiver applies only to this project.
Publication of the Petition for Waiver From Samsung Electronics America, Inc. and Granting of the Interim Waiver From the Department of Energy Commercial Package Air Conditioner and Heat Pump Test Procedures
Document Number: 2011-33172
Type: Notice
Date: 2011-12-27
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
This notice announces receipt of and publishes a petition for waiver from Samsung Electronics America, Inc. (Samsung). The petition for waiver (hereafter ``petition'') requests a waiver from the U.S. Department of Energy (DOE) test procedure applicable to commercial package air-source central air conditioners and heat pumps. The petition is specific to the variable capacity Digital Variable Multi (DVM) (commercial) multi-split heat pump models specified in Samsung's petition. Through this document, DOE: (1) Solicits comments, data, and information with respect to the Samsung petition; and (2) announces the grant of an interim waiver to Samsung from the existing DOE test procedure for the subject commercial multi-split air conditioners and heat pumps.
Decision and Order Granting a Waiver to Miele, Inc. From the U.S. Department of Energy Residential Dishwasher Test Procedure
Document Number: 2011-33171
Type: Notice
Date: 2011-12-27
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The U.S. Department of Energy (DOE) gives notice of the decision and order (Case No. DW-006) that grants to Miele, Inc. (Miele) a waiver from the DOE dishwasher test procedure for certain basic models that run on a 208 volt electrical supply. Under today's decision and order, Miele shall be required to test and rate these dishwashers using an alternate test procedure that takes this supply voltage into account when measuring energy and water consumption.
Decision and Order Granting a Waiver to LG from the Department of Energy Residential Clothes Washer Test Procedure
Document Number: 2011-32808
Type: Notice
Date: 2011-12-22
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The U.S. Department of Energy (DOE) gives notice of the decision and order (Case No. CW-021) that grants to LG Electronics U.S.A., Inc. (LG) a waiver from the DOE clothes washer test procedure for determining the energy consumption of clothes washers for the basic models set forth in its petition for waiver. Under today's decision and order, LG shall be required to test and rate these clothes washers using an alternate test procedure that takes their large capacities into account when measuring energy consumption.
Decision and Order Granting a Waiver to LG Electronics U.S.A., Inc. From the Department of Energy Commercial Package Air Conditioner and Heat Pump Test Procedures
Document Number: 2011-32529
Type: Notice
Date: 2011-12-20
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
This notice publishes the U.S. Department of Energy's (DOE) Decision and Order in Case No. CAC-036, which grants LG Electronics U.S.A., Inc. (LG) a waiver from the existing DOE test procedures applicable to commercial package air-source central air conditioners and heat pumps. The waiver is applicable to the LG Multi V III variable refrigerant flow (VRF) multi-split commercial heat pumps specified in LG's July 22, 2011 petition for waiver. As a condition of this waiver, LG must use the alternate test procedure set forth in this notice to test and rate its Multi V III VRF multi-split commercial heat pumps.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.