Nuclear Regulatory Commission 2016 – Federal Register Recent Federal Regulation Documents
Results 151 - 200 of 586
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information
The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of four amendment requests. The amendment requests are for Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Columbia Generating Station; Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2; and Virgil C. Summer Nuclear Station, Unit No. 1. For each amendment request, the NRC proposes to determine that they involve no significant hazards consideration. Because each amendment request contains sensitive unclassified non-safeguards information (SUNSI) an order imposes procedures to obtain access to SUNSI for contention preparation.
Talen Energy Combined License Application for Bell Bend Nuclear Power Plant
The U.S. Nuclear Regulatory Commission (NRC) is granting the Talen Energy request to withdraw its application for a combined license (COL) for the Bell Bend Nuclear Power Plant (BBNPP). This new reactor would be identified as the BBNPP located adjacent to the existing Susquehanna Steam Electric Station in Luzerne County, Pennsylvania.
License Renewal Application for Fermi 2 Nuclear Power Plant
The U.S. Nuclear Regulatory Commission (NRC) is issuing a final plant-specific supplement, Supplement 56, to NUREG-1437, ``Generic Environmental Impact Statement for License Renewal of Nuclear Plants'' (GEIS), regarding the renewal of the DTE Electric Company (DTE) operating license NPF-43 for an additional 20 years of operation for Fermi 2 Nuclear Power Plant (Fermi 2)
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. This biweekly notice includes all notices of amendments issued, or proposed to be issued, from August 30, 2016, to September 12, 2016. The last biweekly notice was published on September 13, 2016.
Aerotest Operations, Inc.; Aerotest Radiography and Research Reactor; Consideration of Approval of Indirect License Transfer and Conforming Amendment
The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of an application filed by Aerotest Operations, Inc. (Aerotest), and Nuclear Labyrinth LLC (Nuclear Labyrinth), on May 30, 2012. The application seeks NRC approval of the indirect transfer of Facility Operating License No. R-98 for Aerotest Radiography and Research Reactor (ARRR), currently held by Aerotest, to Nuclear Labyrinth. The NRC is also considering amending the license for administrative purposes to reflect the proposed indirect transfer. Because the application contains sensitive unclassified non-safeguards information (SUNSI) an order imposes procedures to obtain access to SUNSI for contention preparation.
Geologic Trench Excavations for Paleoliquefaction Study at Dyer County, Tennessee Site
The U.S. Nuclear Regulatory Commission (NRC) has prepared an environmental assessment (EA) to evaluate the potential environmental impacts that may arise as a result of excavating trenches to observe geologic features for a paleoliquefaction research project at a site located in Dyer County, Tennessee. The NRC has concluded that a finding of no significant impact (FONSI) is appropriate.
Information Collection: Access Authorization
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted a request for renewal of an existing collection of information to the Office of Management and Budget (OMB) for review. The information collection is entitled, ``Access Authorization.''
Information Collection: NRC Form 327, “Special Nuclear Material (SNM) and Source Material (SM) Physical Inventory Summary Report,” and NUREG/BR-0096, “Instructions and Guidance for Completing Physical Inventory”
The U.S. Nuclear Regulatory Commission (NRC) invites public comment on the renewal of Office of Management and Budget's (OMB) approval for an existing collection of information. The information collection is entitled, NRC Form 327, ``Special Nuclear Material (SNM) and Source Material (SM) Physical Inventory Summary Report;'' and NUREG/BR-0096, ``Instructions and Guidance for Completing Physical Inventory.''
Nuclear Power Plant Instrumentation for Earthquakes
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft regulatory guide (DG)-1332, ``Nuclear Power Plant Instrumentation for Earthquakes.'' This DG is proposed Revision 3 of Regulatory Guide 1.12, ``Nuclear Power Plant Instrumentation for Earthquakes.'' The NRC proposes to revise the guide to incorporate advances in seismic instrumentation and operating experience since Revision 2 of RG 1.12 was issued in 1997. The proposed revision describes the seismic instrumentation criteria, including instrumentation type, locations, characteristics, and maintenance, that the NRC staff considers acceptable for nuclear power plants.
Shipping, Receiving, and Internal Transfer of Special Nuclear Material
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment Draft Regulatory Guide (DG) DG-5051, ``Shipping, Receiving, and Internal Transfer of Special Nuclear Material.'' This DG would consolidate in one document NRC guidance concerning the material control and accounting requirements pertaining to shipments, receipts, and internal transfers of special nuclear material. The DG is part of the NRC's ``Regulatory Guide'' series. This series was developed to describe and make available to the public information regarding methods that are acceptable to the NRC staff for implementing specific parts of the NRC's regulations, techniques that the staff uses in evaluating specific issues or postulated events, and data that the staff needs in its review of applications for permits and licenses.
Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2
The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in response to a March 10, 2016, request, as supplemented by letter dated June 24, 2016, from the Tennessee Valley Authority (TVA or the licensee). The exemption permits a one-time reallocation of surplus funds from the nuclear decommissioning trust funds (DTFs) for the Sequoyah Nuclear Plant (SQN), Units 1 and 2, to the DTFs for the Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3, and the Watts Bar Nuclear Plant (WBN), Units 1 and 2.
Environmental Properties Management; Cimarron Facility; Decommissioning Plan
The U.S. Nuclear Regulatory Commission (NRC) has received a license amendment application from Environmental Properties Management (EPM or the licensee) for the Cimarron Facility, located near Crescent, Oklahoma. The licensee is requesting an amendment to its Source and Byproduct Materials License SNM-928 to authorize decommissioning of the Cimarron Facility for unrestricted release.
Issuance of Updates to NUREG-1556 (Consolidated Guidance About Materials Licenses), Volumes 1 (Portable Gauges), 2 (Industrial Radiography), 3 (Sealed Sources and Devices), 4 (Fixed Gauges), 10 (Master Material Licenses), 15 (Changes of Control and Bankruptcy), and 19 (Reciprocity)
The U.S. Nuclear Regulatory Commission (NRC) has issued Revision 2 to NUREG-1556, Volumes 1 and 3 and Revision 1 to NUREG-1556, Volumes 2, 4, 10, 15, and 19, revising licensing guidance for various materials licenses. These documents have been updated to include information on updated regulatory requirements, safety culture, security of radioactive materials, protection of sensitive information, and changes in regulatory policies and practices. The documents are intended for use by applicants, licensees, and the NRC staff.
Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Unit Nos. 2 and 3
The U.S. Nuclear Regulatory Commission (NRC) is giving notice that by petition dated June 30, 2016, Mr. David A. Lochbaum of the Union of Concerned Scientists (the petitioner) requested that the NRC take action with regard to Indian Point Nuclear Generating Unit Nos. 2 and 3. The petitioner's requests are included in the SUPPLEMENTARY INFORMATION section of this document.
In the Matter of Duke Energy Florida, Inc., and Seminole Electric Cooperative, Inc., Crystal River Unit 3 Nuclear Generating Plant
The U.S. Nuclear Regulatory Commission (NRC) is issuing an order approving the direct transfer of the 1.6994 percent of Crystal River Unit 3 Nuclear Generating Plant (CR-3) currently owned by Seminole Electric Cooperative, Inc. (SEC), to Duke Energy Florida, Inc. (DEF). The NRC is also amending the facility-operating license for administrative purposes to reflect the license transfer of the 1.6994 percent ownership from SEC to DEF. The NRC confirmed that the transfer of the license is otherwise consistent with the applicable provisions of law, regulations, and orders issued by the Commission. The order approving the transfer of the 1.6994 percent of CR-3 currently owned by SEC, to DEF became effective on August 10, 2016.
James A. FitzPatrick Nuclear Power Plant; Consideration of Approval of Transfer of License and Conforming Amendment
The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of an application filed by Entergy Nuclear Operations, Inc. (ENO), and Exelon Generation Company, LLC (Exelon) on August 18, 2016. The application seeks NRC approval of the direct transfer of DPR-59 and SFGL-12 for James A. FitzPatrick Nuclear Power Plant (FitzPatrick), from the current holder, ENO, to Exelon. The NRC is also considering amending the renewed facility operating license for administrative purposes to reflect the proposed transfer.
Biweekly Notice: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
Pursuant to Section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. This biweekly notice includes all notices of amendments issued, or proposed to be issued, from August 16, 2016, to August 29, 2016. The last biweekly notice was published on August 30, 2016.
Service Level I, II, III, and In-Scope License Renewal Protective Coatings Applied to Nuclear Power Plants
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft regulatory guide (DG)-1331, ``Service Level I, II, III, and In-Scope License Renewal Protective Coatings Applied to Nuclear Power Plants.'' This DG is proposed Revision 3 of Regulatory Guide (RG) 1.54, ``Service Level I, II, and III Protective Coatings Applied to Nuclear Power Plants.'' The NRC proposes to revise the guide to update the latest American Society for Standards and Testing (ASTM) International standards approved for use in the prior revision of this guide. In addition, the NRC proposes to expand the scope of the regulatory guide to address aging management of internal coatings and linings on components within the scope of the NRC's license renewal regulations.
In the Matter of All Power Reactor Licensees Owned and Operated by First Energy Nuclear Operating Company; and First Energy Corp
The U.S. Nuclear Regulatory Commission (NRC) issued a confirmatory order (Order) to First Energy Nuclear Operating Company (the licensee), confirming the agreement reached in an Alternative Dispute Resolution mediation session held on July 21, 2016. This Order will ensure the licensee restores compliance with NRC regulations.
Information Collection: NRC Form 850A, “Request for NRC Contractor Building Access Authorization,” NRC Form 850B, “Request for NRC Contractor Information Technology Access Authorization” and NRC Form 850C, “Request for NRC Contractor Security Clearance”
The U.S. Nuclear Regulatory Commission (NRC) invites public comment on the renewal of Office of Management and Budget (OMB) approval for an existing collection of information. The information collection is entitled, NRC Form 850A, ``Request for NRC Contractor Building Access Authorization,'' NRC Form 850B, ``Request for NRC Contractor Information Technology Access Authorization,'' and NRC Form 850C, ``Request for NRC Contractor Security Clearance.''
Information Collection: Reporting of Defects and Noncompliance
The U.S. Nuclear Regulatory Commission (NRC) invites public comment on the renewal of Office of Management and Budget (OMB) approval for an existing collection of information. The information collection is titled, ``Reporting of Defects and Noncompliance.''
Information Collection: NRC Form 136, “Security Termination Statement”
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted a request for renewal of an existing collection of information to the Office of Management and Budget (OMB) for review. The information collection is entitled, NRC Form 136, ``Security Termination Statement.''
Information Collection: Suspicious Activity Reporting Using the Protected Web Server (PWS)
The U.S. Nuclear Regulatory Commission (NRC) invites public comment on the renewal of Office of Management and Budget (OMB) approval for an existing collection of information. The information collection is entitled ``Suspicious Activity Reporting using the Protected Web Server (PWS).''
Eagle Rock Enrichment Facility and Lucky Mc Uranium Mill; Consideration of Approval of Transfer of Licenses and Conforming Amendment
The U.S. Nuclear Regulatory Commission (NRC) received, and is considering approval of, an application filed by AREVA, Inc. on July 25, 2016. The application seeks the NRC's consent to: The indirect transfer of control of special nuclear material License SNM-2015 governing the proposed Eagle Rock uranium enrichment facility (EREF) that may later be constructed and operated; the direct transfer of control of source material License SUA-672 for the Lucky Mc Uranium Mill; and the direct transfer of control of Export Licenses XSOU8780, XSNM3643, and XSNM3722. If approved, the transfer of License SNM-2015 would be from AREVA Enrichment Services LLC (AES), to AREVA Nuclear Materials, LLC. The transfer of License SUA-672 and Export License XSOU8780 would be from AREVA, Inc. to AREVA Nuclear Materials, LLC. The transfer of Export Licenses XSNM3643 and XSNM3722 would be from AREVA, Inc. to TN Americas, LLC. In its application, AREVA, Inc. also requests approval of its proposed conforming amendments to reflect the new names of the ``AREVA Nuclear Materials, LLC'' and ``TN Americas, LLC,'' which would hold the licenses to be transferred if the NRC consents to the transfers.
Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Diverse Actuation System Cabinet Changes
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment No. 50 to Combined Licenses (COLs), NPF-91 and NPF-92. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia, and the City of Dalton, Georgia (the licensee); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.
Lost Creek In Situ
The U.S. Nuclear Regulatory Commission (NRC) is considering a license amendment request for Source Material License: SUA-1598, for the Lost Creek In Situ Uranium Recovery (ISR) Project located in Sweetwater County, Wyoming. The NRC staff is issuing an environmental assessment (EA) and finding of no significant impact (FONSI) associated with the proposed action.
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2016; Correction
The U.S. Nuclear Regulatory Commission (NRC) published a final rule amending regulations that became effective August 23, 2016. The fiscal year (FY) 2016 final fee rule, published June 24, 2016, amended the licensing, inspection, special project, and annual fees charged to NRC applicants and licensees. This document corrects the annual fee for materials licensees in the category ``Nuclear laundries'' from the FY 2016 rate of $0 to the FY 2015 rate of $40,100. This correction allows Agreement States to continue to collect fees in this fee category.
South Carolina Electric & Gas Company, South Carolina Public Service Authority; Virgil C. Summer Nuclear Station, Units 2 and 3; Diverse Actuation System Cabinet Changes
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment No. 50 to Combined Licenses (COLs), NPF-93 and NPF- 94. The COLs were issued to South Carolina Electric & Gas Company, (the licensee); for construction and operation of the Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3, located in Fairfield County, South Carolina. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.
Virgil C. Summer Nuclear Station, Units 2 and 3
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Combined Licenses (NPF-93 and NPF-94), issued to South Carolina Electric & Gas (SCE&G) and South Carolina Public Service Authority (Santee Cooper) (the licensee), for construction and operation of the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3 located in Fairfield County, South Carolina.
Exelon Generation Company, LLC; LaSalle County Station, Units 1 and 2; License Renewal
The U.S. Nuclear Regulatory Commission (NRC) is issuing a final plant-specific supplement, Supplement 57, to NUREG-1437, ``Generic Environmental Impact Statement for License Renewal of Nuclear Plants'' (GEIS), regarding the renewal of Exelon Generation Company, LLC, operating licenses NPF-11 and NPF-18 for an additional 20 years of operation for LaSalle County Station, Units 1 and 2 (LSCS).
Enhancing Participation in NRC Public Meetings
To further clarify and enhance participation in public meetings conducted by the U.S. Nuclear Regulatory Commission (NRC), the NRC is proposing to revise its public meeting policy. The revised policy statement redefines the three categories of public meetings and identifies the level of public participation offered at each type of meeting. The revised policy statement also clarifies notification expectations for meetings that include physical presence in the meeting room and meetings that rely solely on remote access technology such as a teleconferencing. The proposed revisions will improve the consistency of the NRC's public meetings and help participants better prepare for NRC meetings.
Instrumentation and Controls Guidance
The U.S. Nuclear Regulatory Commission (NRC) is issuing a final revision to Chapter 7, ``Instrumentation and Controls,'' of NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition.''
Advisory Committee on the Medical Uses of Isotopes: Call for Nominations
The U.S. Nuclear Regulatory Commission (NRC) is advertising for nominations for the position of Radiation Safety Officer on the Advisory Committee on the Medical Uses of Isotopes (ACMUI). Nominees should currently be functioning as a Radiation Safety Officer.
Omaha Public Power District; Fort Calhoun Station, Unit No. 1
The U.S. Nuclear Regulatory Commission (NRC) has granted the request of the Omaha Public Power District (the licensee) to withdraw its license amendment application dated April 4, 2016, for a proposed amendment to Renewed Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No. 1 (FCS). The proposed amendment would have modified License Condition D, Fire Protection Program, by withdrawing the commitments in REC-119 and REC-120 to implement certain plant modifications as stated in License Condition Paragraph 3.D.(3)(b).
Exelon Generation Company, LLC; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Update Schedule for Updated Final Safety Analysis Report
The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in response to a January 29, 2016, application from Exelon Generation Company, LLC (Exelon), the licensee for Calvert Cliffs Nuclear Power Plant (CCNPP), Units 1 and 2, for Renewed Facility Operating License Nos. DPR-53 and DPR-60, which requested an exemption from the updated final safety analysis report (UFSAR) update schedule requirements in the NRC's regulations. The NRC staff reviewed this request and is granting an exemption from the requirement that an update to the UFSAR be submitted 6 months after the refueling outage for each unit. The exemption allows the update to the CCNPP UFSAR to be submitted within 6 months following the completion of each CCNPP Unit 2 refueling outage, not to exceed 24 months from the last submittal.
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. This biweekly notice includes all notices of amendments issued, or proposed to be issued, from August 2, 2016, to August 15, 2016. The last biweekly notice was published on August 16, 2016.
Information Collection: Criteria and Procedures for Determining Eligibility for Access to or Control Over Special Nuclear Material
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted a request for renewal of an existing collection of information to the Office of Management and Budget (OMB) for review. The information collection is entitled, ``Criteria and Procedures for Determining Eligibility for Access to or Control Over Special Nuclear Material.''
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.