Nuclear Regulatory Commission June 10, 2015 – Federal Register Recent Federal Regulation Documents

Omaha Public Power District, Nebraska Public Power District
Document Number: 2015-14209
Type: Notice
Date: 2015-06-10
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has issued a director's decision with regard to petitions dated June 26 and July 3, 2011, filed by Mr. Thomas Saporito (the petitioner), requesting that the NRC take action with regard to Fort Calhoun Station (FCS), Unit 1 and Cooper Nuclear Station (CNS), respectively. The petitioner's requests and the director's decision are included in the SUPPLEMENTARY INFORMATION section of this document.
Omaha Public Power District; Fort Calhoun Station, Unit 1
Document Number: 2015-14207
Type: Notice
Date: 2015-06-10
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has issued a director's decision with regard to the petition dated June 21, 2012, filed by Mr. Wallace Taylor on behalf of the Iowa Chapter of the Sierra Club (the petitioner), requesting that the NRC take action with regard to Fort Calhoun Station (FCS), Unit 1. The petitioner's request and the director's decision are included in the SUPPLEMENTARY INFORMATION section of this document.
Virgil C. Summer Nuclear Station, Units 2 and 3; South Carolina Electric & Gas Company
Document Number: 2015-14206
Type: Notice
Date: 2015-06-10
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and issuing License Amendment No. 24 to Combined Licenses (COL), NPF-93 and NPF-94. The COLs were issued to South Carolina Electric & Gas Company (SCE&G), and South Carolina Public Service Authority (the licensee), for construction and operation of the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3 located in Fairfield County, South Carolina. The granting of the exemption allows the changes to Tier 1 information requested in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.
Exelon Generation Company, LLC; Peach Bottom Atomic Power Station, Unit 3
Document Number: 2015-14139
Type: Notice
Date: 2015-06-10
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Renewed Facility Operating License No. DPR- 56, issued to Exelon Generation Company, LLC (the licensee), for operation of the Peach Bottom Atomic Power Station (PBAPS), Unit 3. The proposed amendment would change a license condition pertaining to the PBAPS, Unit 3 replacement steam dryer (RSD). Currently, the license condition requires that a revised analysis for the RSD be submitted to the NRC, as a report, at least 90 days prior to the start of the Unit 3 extended power uprate (EPU) outage. The proposed amendment would reduce the period before the outage by which the analysis is to be submitted from 90 days to 30 days. The licensee indicated that the EPU outage is scheduled to start on September 14, 2015.
FirstEnergy Nuclear Operating Company; Beaver Valley Power Station, Unit Nos. 1 and 2
Document Number: 2015-14138
Type: Notice
Date: 2015-06-10
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Renewed License Nos. DPR-66 and NPF-73, issued on November 5, 2009, and held by FirstEnergy Nuclear Operating Company for the operation of Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS). The proposed action would revise the Emergency Preparedness Plan (EPP) to modify the boundary of the 10-mile Emergency Planning Zone (EPZ). Specifically, the proposed change would align the BVPS EPZ boundary with the boundary that is currently in use by the emergency management agencies of the three counties that implement protective actions around BVPS.
In the Matter of Issuance of a Non-Manufacturing and Distribution Service Provider Order
Document Number: 2015-14129
Type: Notice
Date: 2015-06-10
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) issued an order imposing trustworthiness and reliability requirements for unescorted access to certain radioactive material by request of a service provider licensee that is not a manufacturer or distributor. The order was issued on April 27, 2015, and became effective immediately.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.