Nuclear Regulatory Commission 2009 – Federal Register Recent Federal Regulation Documents
Results 701 - 750 of 799
Office of New Reactors; Notice of Availability of the Final Interim Staff Guidance COL/ESP-ISG-04 on the Definition of Construction and on Limited Work Authorizations
The NRC is issuing its Final Interim Staff Guidance (ISG) COL/ ESP-ISG-004 (ML090060897). This ISG provides guidance regarding the definition of construction and the delineation of preconstruction activities and those activities requiring prior approval of the U.S. Nuclear Regulatory Commission (NRC or the Commission). In addition, this ISG provides guidance regarding the information to be submitted by any applicant for a limited work authorization (LWA). The NRC staff issues ISGs to facilitate timely implementation of the current staff guidance and to facilitate activities associated with review of applications for early site permits and combined licenses for the Office of New Reactors. The NRC staff will also incorporate COL/ ESP-ISG-004 into the next revisions of the Regulatory Guide 1.206, ``Combined License Applications for Nuclear Power Plants,'' and related guidance documents.
Exelon Generation Company, LLC; Exelon Generation Company, LLC, Three Mile Island Nuclear Station, Unit 1; Notice of Availability of the Draft Supplement 37 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants, and Public Meeting for the License Renewal of Three Mile Island Nuclear Station, Unit 1
This document corrects a notice appearing in the Federal Register on December 9, 2008 (73 FR 74766), that announces a public meeting for the license renewal of Three Mile Island Nuclear Station, Unit 1. This action is necessary to update the date and location of the meeting.
Technical Specifications Task Force; Denial of Petition for Rulemaking
The U.S. Nuclear Regulatory Commission (NRC) is denying a petition for rulemaking (PRM-170-6) submitted by the Technical Specifications Task Force (TSTF), which is a jointly sponsored activity of the Pressurized Water Reactor Owners Group and the Boiling Water Reactor Owners' Group. The petition requests that the NRC amend its regulations to provide an explicit exemption from NRC review fees for activities associated with generic improvements to the Improved Standard Technical Specifications (ISTS). The NRC is denying the petition because the petition presents issues that the NRC has already carefully considered and addressed. Also, the petition fails to present any significant new information or arguments that would warrant the requested amendment.
Protection of Safeguards Information; Correction
This document corrects a rule that appeared in the Federal Register on October 24, 2008 (73 FR 63545), that amends the regulations for the protection of Safeguards Information (SGI) to protect SGI from inadvertent release and unauthorized disclosure which might compromise the security of nuclear facilities and materials. This action is necessary to correct an erroneous authority citation.
Agency Information Collection Activities: Proposed Collection; Comment Request
The NRC invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: Requests to Non- Agreement States For Information. 2. Current OMB approval number: 3150-0200. 3. How often the collection is required: 8 times per year. 4. Who is required or asked to report: The 17 Non-Agreement States (those States and 2 territories that have not signed 274(b) Agreements with NRC). 5. The number of annual respondents: 136. 6. The number of hours needed annually to complete the requirement or request: 1122. 7. Abstract: Requests may be made of States that are similar to those of Agreement States to provide a more complete overview of the national program for regulating radioactive materials. This information would be used in the decisionmaking of the Commission. With Agreement States and as part of the NRC cooperative post-agreement program with the States pursuant to Section 274(b), information on licensing and inspection practices, and/or incidents, and other technical and statistical information are exchanged. Agreement State comments are also solicited in the areas of proposed implementing procedures relative to NRC Agreement State program policies. With the enactment of the Energy Policy Act of 2005, specifically Section 651(e), NRC now has regulatory authority over use of accelerator-produced radioactive materials and discrete sources of radium-226 and other naturally occurring radioactive material as specified by the Commission. Therefore, information requests sought may take the form of surveys, e.g., telephonic and electronic surveys/polls and facsimiles. Submit, by April 13, 2009, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? A copy of the draft supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O-1 F21, Rockville, MD 20852. OMB clearance requests are available at the NRC worldwide Web site: https:// www.nrc.gov/public-involve/doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC-2008-0564. You may submit your comments by any of the following methods. Electronic comments: Go to https://www.regulations.gov and search for Docket No. NRC-2008-0564. Mail comments to NRC Clearance Officer, Gregory Trussell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Gregory Trussell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by telephone at 301- 415-6445, or by email to INFOCOLLECTS.Resource@NRC.GOV.
Agency Information Collection Activities: Proposed Collection; Comment Request
The NRC invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: ``Generic Customer Satisfaction Surveys and NRC Form 671, Request for Review of a Customer Satisfaction Survey under Generic Clearance.'' 2. Current OMB approval number: 3150-0197. 3. How often the collection is required: On occasion. 4. Who is required or asked to report: Voluntary reporting by the public and NRC licensees. 5. The number of annual respondents: 1,261. 6. The number of hours needed annually to complete the requirement or request: 226 hours. 7. Abstract: Voluntary customer satisfaction surveys will be used to contact users of NRC services and products to determine their needs, and how the Commission can improve its services and products to better meet those needs. In addition, focus groups will be contacted to discuss questions concerning those services and products. Results from the surveys will give insight into how NRC can make its services and products cost effective, efficient and responsive to its customer needs. Each survey will be submitted to OMB for its review. Submit, by April 13, 2009, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? A copy of the draft supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O-1 F21, Rockville, MD 20852. OMB clearance requests are available at the NRC worldwide Web site: https:// www.nrc.gov/public-involve/doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC-2009-0048. You may submit your comments by any of the following methods. Electronic comments: Go to https://www.regulations.gov and search for Docket No. NRC-2009-0048. Mail comments to NRC Clearance Officer, Gregory Trussell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Gregory Trussell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by telephone at 301- 415-6445, or by e-mail to INFOCOLLECTS.Resource@NRC.GOV.
Safety Culture Policy Statement Development: Public Meeting and Request for Public Comments
The NRC is developing an update to its policy statement on safety culture to include the unique aspects of security and to ensure that the policy applies to all licensees and certificate holders. The NRC is conducting a public meeting to solicit public input on topics relating to the development of the policy statement. In addition to announcing the public meeting, the NRC is using this notice to request comments on the topics discussed in this notice. These topics can be found in section D (Topics for Discussion) of the SUPPLEMENTARY INFORMATION.
Agency Information Collection Activities: Proposed Collection; Comment Request
The NRC invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: 10 CFR Part 62 ``Criteria and Procedures for Emergency Access to Non-Federal and Regional Low-Level Waste Disposal Facilities.'' 2. Current OMB approval number: 3150-0143. 3. How often the collection is required: The collection would only be required upon application for an exemption when access to a non- federal low-level waste disposal facility is denied, which results in a public health and safety and/or common defense and security concern. 4. Who is required or asked to report: Generators of low-level radioactive waste who are denied access to a non-Federal low-level radioactive waste and who wish to request emergency access for disposal at a non-Federal LLRW disposal facility pursuant to 10 CFR Part 62. 5. The number of annual respondents: 1. 6. The number of hours needed annually to complete the requirement or request: 233. 7. Abstract: 10 CFR part 62 sets out the information which must be provided to the NRC by any low-level waste generator seeking emergency access to an operating low-level waste disposal facility. The information is required to allow NRC to determine if denial of disposal constitutes a serious and immediate threat to public health and safety or common defense and security. 10 CFR part 62 also provides that the Commission may grant an exemption from the requirements in this part upon application of an interested person or upon its own initiative. Submit, by April 10, 2009, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? A copy of the draft supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O-1 F21, Rockville, Maryland 20852. OMB clearance requests are available at the NRC worldwide Web site: https:// www.nrc.gov/public-involve/doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC-2008-0565. You may submit your comments by any of the following methods. Electronic comments: Go to https://www.regulations.gov and search for Docket No. NRC-2008-0565. Mail comments to NRC Clearance Officer, Gregory Trussell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Gregory Trussell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by telephone at 301- 415-6445, or by e-mail to INFOCOLLECTS.Resource@NRC.GOV.
Agency Information Collection Activities: Proposed Collection; Comment Request
The NRC invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: Application for NRC Export/Import License, Amendment, or Renewal. 2. Current OMB approval number: 3150-0027. 3. How often the collection is required: On occasion; for each separate export, import, amendment, or renewal license application, and for exports of incidental radioactive material using existing general licenses. 4. Who is required or asked to report: Any person in the U.S. who wishes to export or import (a) nuclear material and equipment or byproduct material subject to the requirements of a specific license; (b) amend a license; (c) renew a license, and (d) for notification of incidental radioactive material exports that are contaminants of shipments of more than 100 kilograms of non-waste material using existing NRC general licenses. 5. The number of annual respondents: 170. 6. The number of hours needed annually to complete the requirement or request: 484. 7. Abstract: Persons in the U.S. wishing to export or import nuclear material or equipment, or byproduct material requiring a specific authorization, amend or renew a license, or wishing to use existing NRC general licenses for the export of incidental radioactive material over 100 kilograms must file an NRC Form 7 application. The NRC Form 7 application will be reviewed by the NRC and by the Executive Branch, and if applicable statutory, regulatory, and policy considerations are satisfied, the NRC will issue an export, import, amendment or renewal license. Submit, by April 10, 2009, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? A copy of the draft supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O-1 F21, Rockville, MD 20852. OMB clearance requests are available at the NRC worldwide Web site: https:// www.nrc.gov/public-involve/doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC-2008-0563. You may submit your comments by any of the following methods. Electronic comments: Go to https://www.regulations.gov and search for Docket No. NRC-2008-0563. Mail comments to NRC Clearance Officer, Gregory Trussell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Gregory Trussell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by telephone at 301- 415-6445, or by e-mail to INFOCOLLECTS.Resource@NRC.GOV.
Agency Information Collection Activities: Proposed Collection; Comment Request
The NRC invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: Billing Instructions for NRC Cost Type Contracts. 2. Current OMB approval number: 3150-0109. 3. How often the collection is required: Monthly and on occasion. 4. Who is required or asked to report: NRC Contractors. 5. The number of annual respondents: 64. 6. The number of hours needed annually to complete the requirement or request: 1,202 hours. 7. Abstract: In administering its contracts, the NRC Division of Contracts provides billing instructions for its contractors to follow in preparing invoices. These instructions stipulate the level of detail in which supporting data must be submitted for NRC review. The review of this information ensures that all payments made by NRC for valid and reasonable costs are in accordance with the contract terms and conditions. Submit, by April 10, 2009, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? A copy of the draft supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O-1 F21, Rockville, MD 20852. OMB clearance requests are available at the NRC worldwide Web site: https:// www.nrc.gov/public-involve/doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC-2008-0040. You may submit your comments by any of the following methods. Electronic comments: Go to https://www.regulations.gov and search for Docket No. NRC-2008-0040. Mail comments to NRC Clearance Officer, Gregory Trussell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Gregory Trussell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by telephone at 301- 415-6874, or by e-mail to INFOCOLLECTS.Resource@NRC.GOV.
Exelon Generation Company, LLC, and PSEG Nuclear, LLC; Environmental Assessment and Finding of No Significant Impact; Correction NRC-2009-0033
This document corrects a notice appearing in the Federal Register on January 29, 2009 (74 FR 5191), that notified the public of the Environmental Assessment and Finding of No Significant Impact for issuance of an Exemption from Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix R, Section III.G, ``Fire Protection of Safe Shutdown Capability,'' for the use of operator manual actions in lieu of the requirements specified in Section III.G.2 as requested by Exelon Generation Company, LLC for operation of Peach Bottom Atomic Power Station, Units 2 and 3 located in York and Lancaster Counties, Pennsylvania. This action is necessary to correct the Licensee's name as stated in the subject heading of the original notice.
Proposed Standard Review Plan Section 9.5.1.2 on Risk-Informed, Performance-Based Fire Protection Program
The NRC is requesting public comment on NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Section 9.5.1.2 on staff guidance on Risk-Informed (RI), Performance-Based (PB) Fire Protection Program (FPP) for Operating Nuclear Power Plants (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090050052). This guidance is being issued as an alternate to the existing guidance currently provided under Standard Review Plan (SRP) section 9.5.1. This is stand alone guidance and is provided for the benefit of licensees of existing plants who choose to adopt RI/PB FPP that meets the requirements of National Fire Protection Association (NFPA) Standard 805. The NRC staff issues notices to facilitate timely implementation of the current staff guidance and to facilitate activities associated with the review of amendment applications for transitioning to RI/PB FPPs. The NRC staff will also incorporate the approved SRP section 9.5.1.2 into the next revisions of RG 1.205 and any related guidance documents. This proposed guidance is applicable only to currently operating nuclear reactor licensees. Because of the introduction of the now proposed SRP section 9.5.1.2, the current SRP section 9.5.1 will be renumbered to read 9.5.1.1. This SRP is not endorsing NFPA 805, since that standard is already a part of the 10 CFR 50.48(c) rule. In addition, this SRP does not directly endorse the guidance document issued by the industry (NEI 04-02, ``Guidance for Implementing a Risk- Informed, Performance-Based Fire Protection Program under 10 CFR 50.48(c),'' Rev. 2) for plants transitioning to an NFPA 805 FPP. RG 1.205 provides the staff's positions with respect to NEI 04-02.
List of Approved Spent Fuel Storage Casks: MAGNASTOR Addition, Confirmation of Effective Date
The Nuclear Regulatory Commission (NRC) is confirming the effective date of February 4, 2009, for the direct final rule that was published in the Federal Register on November 21, 2008. This direct final rule amended the NRC's regulations to add the NAC International Inc. MAGNASTOR cask system to the list of approved spent fuel storage casks in 10 CFR 72.214.
Notification of Impending Waiver Termination
Section 651(e) of the Energy Policy Act of 2005 (EPAct) authorized the U.S. Nuclear Regulatory Commission (Commission or NRC) to issue a time-limited waiver (70 FR 51581; August 31, 2005) to allow continued use and possession of naturally-occurring and accelerator- produced radioactive materials (NARM) while the Commission developed a regulatory framework for regulation of the new byproduct material. The Commission has begun terminating the time-limited waiver in phases in accordance to the provisions of the ``Plan for the Transition of Regulatory Authority Resulting from the Expanded Definition of Byproduct Material'' (transition plan) issued by the Commission on October 19, 2007 (72 FR 59157). The first phase of waiver terminations occurred on November 30, 2007 (72 FR 68043), and the second phase occurred on September 30, 2008 (73 FR 14376). This document provides advance notification that on August 7, 2009, the Commission will terminate the time-limited waivers for all remaining non-Agreement States and Canadian licenses that are under NRC jurisdiction. Alaska, Connecticut, Hawaii, Michigan, New Jersey, and Virginia. As provided in the transition plan, for existing NRC licensees, NARM use amendments are required within 6 months from the date of waiver termination. For NARM users in non-Agreement States and Canadian licensees without a NRC license, the license applications are required within 12 months from the date waiver termination.
Mr. Eric Epstein, Chairman, Three Mile Island Alert, Inc.; Denial of Petition for Rulemaking
The U.S. Nuclear Regulatory Commission (NRC) is denying a petition for rulemaking (PRM) submitted by Mr. Eric Epstein, Chairman of Three Mile Island Alert, Inc. (TMIA). The petitioner requested that the NRC amend its emergency preparedness regulations to require that all host school pick-up centers be located at least 5 to 10 miles beyond the radiation plume exposure boundary zone to ensure that all school children are protected in the event of a radiological emergency.
Safety Culture Policy Statement Development: Public Meeting and Request for Public Comments; Correction
This document corrects a notice appearing in the Federal Register on January 23, 2009 (74 FR 4260), that informs the public of the public meeting and Request for Comments on topics relating to the development of the policy statement. In addition to announcing the public meeting, the NRC is using this notice to request comments on the topics discussed in this notice. These topics can be found in section D (Topics for Discussion of the Supplementary Information).
Nuclear Ship Savannah; Notice of Receipt and Availability for Comment of Post Shutdown Decommissioning Activities Report
On December 11, 2008, the U.S. Department of Transportation Maritime Administration (MARAD) submitted its PSDAR for the NS Savannah. The PSDAR provides an overview of MARAD's proposed decommissioning activities, schedule, and costs for the NS Savannah. The NS Savannah was brought to power in 1961 and removed from service in 1970. Final reactor shutdown occurred in November 1970 and defueling was completed in fall 1971. The NS Savannah is currently located at the Canton Marine Terminal in Baltimore, Maryland. The PSDAR, dated December 11, 2008, was placed in NRC's Agency-wide Document Access and Management System (ADAMS) with Accession No. ML083500100.
Westinghouse Electric Company LLC; Consideration of Petition in Rulemaking Process
The Nuclear Regulatory Commission (NRC) will consider the issues raised in a petition for rulemaking (PRM) submitted by Westinghouse Electric Company LLC (petitioner) in the NRC's rulemaking process. The petition was dated November 4, 1999, and was docketed as PRM-50-69. The petitioner requested that Table 1 in 10 CFR Part 50, Appendix G, be amended by removing requirements related to the metal temperature of the closure head flange and vessel flange regions. Specifically, the petitioner requested that footnotes (2) and (6) be removed from Table 1.