Joint Board for Enrollment of Actuaries August 12, 2015 – Federal Register Recent Federal Regulation Documents

In the Matter of All Power Reactor Licensees Owned and Operated by Entergy Nuclear Operations, Inc.; Entergy Operations, Inc.; and Entergy Nuclear Generation Company
Document Number: 2015-19853
Type: Notice
Date: 2015-08-12
Agency: Joint Board for Enrollment of Actuaries
The U.S. Nuclear Regulatory Commission (NRC) is issuing a confirmatory order to Entergy Operations, Inc. (Entergy), confirming an agreement reached in an Alternative Dispute Resolution mediation session held on September 22, 2014. As part of this agreement, Entergy will take actions to review and evaluate its security procedures; strengthen its procedures and set expectations regarding the conduct of security personnel; and conduct a presentation describing the event that formed the bases for the violation and the lessons learned, to its employees and the industry. Entergy is required to have an independent safety culture assessment conducted of the security organization at its River Bend Station. Entergy is also required to notify the NRC periodically of the status of its efforts.
South Carolina Electric & Gas Company; Virgil C. Summer Nuclear Station, Unit 1
Document Number: 2015-19851
Type: Notice
Date: 2015-08-12
Agency: Joint Board for Enrollment of Actuaries
The U.S. Nuclear Regulatory Commission (NRC) has granted the request of South Carolina Electric & Gas Company to withdraw its application dated November 12, 2014, for a proposed amendment to Renewed Facility Operating License NPF-12. The proposed amendment would have revised the Virgil C. Summer Nuclear Station, Unit 1, Radiation Emergency Plan to relocate the Technical Support Center.
Duke Energy Carolinas, LLC; McGuire Generating Station, Units 1 and 2
Document Number: 2015-19850
Type: Notice
Date: 2015-08-12
Agency: Joint Board for Enrollment of Actuaries
The U.S. Nuclear Regulatory Commission (NRC) has granted the request of Duke Energy Carolinas, LLC to withdraw its application dated February 22, 2012, as supplemented by letters dated November 13, 2012 and February 4, 2013, for a proposed amendment to Renewed Facility Operating License Nos. NPF-9 and NPF-17, for the McGuire Nuclear Station, Units 1 and 2. The proposed amendment would have revised the McGuire Technical Specification 3.7.7, ``Nuclear Service Water System (NSWS).'' Specifically, the proposed change would have the use of the NSWS pump discharge crossover valves and associated piping to cross tie McGuire Nuclear Station, Units 1 and 2 NSWS trains to mitigate a Loss of Service Water event.
Environmental Impacts of Severe Reactor and Spent Fuel Pool Accidents
Document Number: 2015-19843
Type: Rule
Date: 2015-08-12
Agency: Joint Board for Enrollment of Actuaries
The U.S. Nuclear Regulatory Commission (NRC) is denying 15 petitions for rulemaking submitted by the petitioners identified in the table in Section IV, ``Availability of Documents.'' The petitioners requested that the NRC rescind its regulations that ``reach generic conclusions about the environmental impacts of severe reactor and/or spent fuel pool accidents and therefore prohibit considerations of those impacts in reactor licensing proceedings.''
Interim Staff Guidance on Changes During Construction
Document Number: 2015-19811
Type: Notice
Date: 2015-08-12
Agency: Joint Board for Enrollment of Actuaries
The U.S. Nuclear Regulatory Commission (NRC) is issuing its final Interim Staff Guidance (ISG) COL-ISG-025, ``Interim Staff Guidance on Changes During Construction.'' This ISG provides guidance to the NRC staff on the Preliminary Amendment Request (PAR) review process available to the combined license (COL) holders. The PAR is implemented through a license condition for use as an elective precursor to the license amendment process.
In the Matter of Bradley D. Bastow, D. O.
Document Number: 2015-19808
Type: Notice
Date: 2015-08-12
Agency: Joint Board for Enrollment of Actuaries
The U.S. Nuclear Regulatory Commission (NRC) is issuing an Imposition Order to Bradley D. Bastow, D. O. imposing a civil penalty of $7,000. On November 6, 2014, the NRC issued a Notice of Violation and Proposed Imposition of Civil Penalty$7,000 to Bradley D. Bastow, D. O. for failing to comply with a Confirmatory Order issued on September 3, 2013.
Virginia Electric and Power Company (Dominion); North Anna Independent Spent Fuel Storage Installation
Document Number: 2015-19807
Type: Notice
Date: 2015-08-12
Agency: Joint Board for Enrollment of Actuaries
The U.S. Nuclear Regulatory Commission (NRC) reviewed an application by Virginia Electric and Power Company (Dominion) for an amendment of Special Nuclear Materials License No. SNM-2507, which authorizes Dominion to receive, possess, store, and transfer spent nuclear fuel and associated radioactive materials at the North Anna (NA) independent spent fuel storage installation (ISFSI). The requested amendment would allow the TN-32 casks to remain in their current positions subsequent to their movement during the August 23, 2011, seismic event that affected the NA ISFSI.
Fitness-for-Duty Programs for New Nuclear Power Plant Construction Sites
Document Number: 2015-19773
Type: Notice
Date: 2015-08-12
Agency: Joint Board for Enrollment of Actuaries
The U.S. Nuclear Regulatory Commission (NRC) is issuing a new regulatory guide (RG), RG 5.84, ``Fitness-for-Duty Programs at New Reactor Construction Sites.'' This RG provides guidance for implementing fitness-for-duty (FFD) requirements at nuclear power plant construction sites.
Information Collection: NRC Form 664, “General Licensee Registration”
Document Number: 2015-19734
Type: Notice
Date: 2015-08-12
Agency: Joint Board for Enrollment of Actuaries
The U.S. Nuclear Regulatory Commission (NRC) invites public comment on the renewal of Office of Management and Budget (OMB) approval for an existing collection of information. The information collection is entitled, ``NRC Form 664, General Licensee Registration.''
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.