Safety Advisory 2023-01; Evaluation of Policies and Procedures Related to the Use and Maintenance of Hot Bearing Wayside Detectors
Document Number: 2023-04415
Type: Notice
Date: 2023-03-03
Agency: Federal Railroad Administration, Department of Transportation
Preliminary investigation of recent train derailments indicates the cause of, or contributing factor to, the incidents was a mechanical failure, specifically burnt journal bearings. Accordingly, FRA is issuing this Safety Advisory to make recommendations to enhance the mechanical reliability of rolling stock and the safety of railroad operations. This Safety Advisory recommends that railroads: evaluate the thresholds for inspections based on hot bearing detector (HBD) data; consider the use of real-time trend analyses of HBD data as a criterion for inspection; ensure the proper training and qualification of personnel responsible for the calibration, inspection, and maintenance of HBDs; ensure proper inspection of rolling stock with HBD alerts; and improve the safety culture of their organization, particularly as it pertains to operational decisions based on HBD data.
Proposed Agency Information Collection Activities; Comment Request
Document Number: 2023-04299
Type: Notice
Date: 2023-03-02
Agency: Federal Railroad Administration, Department of Transportation
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, FRA will seek approval of the Information Collection Request (ICR) abstracted below. Before submitting this ICR to the Office of Management and Budget (OMB) for approval, FRA is soliciting public comment on specific aspects of the activities identified in the ICR.
Petition for Extension of Waiver of Compliance
Document Number: 2023-03901
Type: Notice
Date: 2023-02-27
Agency: Federal Railroad Administration, Department of Transportation
Petition for Extension of Waiver of Compliance
Document Number: 2023-03900
Type: Notice
Date: 2023-02-27
Agency: Federal Railroad Administration, Department of Transportation
Union Pacific Railroad's Request To Amend Its Positive Train Control Safety Plan and Positive Train Control System
Document Number: 2023-02995
Type: Notice
Date: 2023-02-13
Agency: Federal Railroad Administration, Department of Transportation
This document provides the public with notice that, on February 3, 2023, Union Pacific Railroad (UP) submitted a request for amendment (RFA) to its FRA-approved Positive Train Control Safety Plan (PTCSP). FRA is publishing this notice and inviting public comment on the railroad's RFA to its PTCSP.
Corridor Identification and Development Program
Document Number: 2023-02566
Type: Notice
Date: 2023-02-07
Agency: Federal Railroad Administration, Department of Transportation
FRA is extending the application submittal period for its Notice for the Corridor Identification and Development program published on December 20, 2022, from March 20, 2023, to March 27, 2023.
Notice of Funding Opportunity for the Federal-State Partnership for Intercity Passenger Rail Grants Program for Projects Not Located on the Northeast Corridor
Document Number: 2023-02346
Type: Notice
Date: 2023-02-03
Agency: Federal Railroad Administration, Department of Transportation
FRA is adding funding and extending the application submittal period for its Fiscal Year (FY) 2022 NOFO for the Federal-State Partnership for Intercity Passenger Rail Program (FSP Program) for projects not located on the Northeast Corridor published on December 7, 2022. The basis for the funding increase and extension is the appropriation of additional amounts for the FSP Program from the Consolidated Appropriations Act, 2023, together with the government's goal of efficiently administering such funds.
Amtrak's Request To Conduct Regression Testing of Its Certified Positive Train Control System
Document Number: 2023-02201
Type: Notice
Date: 2023-02-02
Agency: Federal Railroad Administration, Department of Transportation
This document provides the public with notice that on January 6, 2023, the National Railroad Passenger Corporation (Amtrak) submitted a document entitled ``Advanced Civil Speed Enforcement System (ACSES II) Regression Test Waiver Request,'' to FRA. Amtrak asks FRA to approve its request to conduct regression testing of its FRA-certified ACSES II positive train control (PTC) system on its PTC-equipped track.
Notice of Application for Approval of Discontinuance or Modification of a Railroad Signal System
Document Number: 2023-01451
Type: Notice
Date: 2023-01-25
Agency: Federal Railroad Administration, Department of Transportation
Petition for Extension of Waiver of Compliance
Document Number: 2023-01450
Type: Notice
Date: 2023-01-25
Agency: Federal Railroad Administration, Department of Transportation
Petition for Waiver of Compliance
Document Number: 2023-01173
Type: Notice
Date: 2023-01-23
Agency: Federal Railroad Administration, Department of Transportation
Petition for Waiver of Compliance
Document Number: 2023-01172
Type: Notice
Date: 2023-01-23
Agency: Federal Railroad Administration, Department of Transportation
Petition for Extension of Waiver of Compliance
Document Number: 2023-01169
Type: Notice
Date: 2023-01-23
Agency: Federal Railroad Administration, Department of Transportation
Petition for Extension of Waiver of Compliance
Document Number: 2023-01178
Type: Notice
Date: 2023-01-23
Agency: Federal Railroad Administration, Department of Transportation
Proposed Agency Information Collection Activities; Comment Request
Document Number: 2023-01046
Type: Notice
Date: 2023-01-20
Agency: Federal Railroad Administration, Department of Transportation
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, FRA will seek approval of the Information Collection Request (ICR) abstracted below. Before submitting this ICR to the Office of Management and Budget (OMB) for approval, FRA is soliciting public comment on specific aspects of the activities identified in the ICR.
Proposed Agency Information Collection Activities; Comment Request
Document Number: 2023-01045
Type: Notice
Date: 2023-01-20
Agency: Federal Railroad Administration, Department of Transportation
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, FRA will seek approval of the Information Collection Request (ICR) abstracted below. Before submitting this ICR to the Office of Management and Budget (OMB) for approval, FRA is soliciting public comment on specific aspects of the activities identified in the ICR.
Establishment of an Emergency Relief Docket for Calendar Year 2023
Document Number: 2023-00690
Type: Notice
Date: 2023-01-17
Agency: Federal Railroad Administration, Department of Transportation
This Notice announces the establishment of FRA's emergency relief docket (ERD) for calendar year 2023. The designated ERD for calendar year 2023 is docket number FRA-2023-0003.
Notice of Application for Approval of Discontinuance or Modification of a Railroad Signal System
Document Number: 2023-00688
Type: Notice
Date: 2023-01-17
Agency: Federal Railroad Administration, Department of Transportation
Petition for Extension of Waiver of Compliance
Document Number: 2023-00687
Type: Notice
Date: 2023-01-17
Agency: Federal Railroad Administration, Department of Transportation
Petition for Extension of Waiver of Compliance
Document Number: 2023-00686
Type: Notice
Date: 2023-01-17
Agency: Federal Railroad Administration, Department of Transportation
Guidance on Development and Implementation of Railroad Capital Projects
Document Number: 2023-00508
Type: Notice
Date: 2023-01-12
Agency: Federal Railroad Administration, Department of Transportation
FRA is publishing final guidance on the development and implementation of railroad capital projects that may be funded, in whole or in part, by FRA (``final guidance''). This final guidance follows publication of the proposed guidance (``proposed guidance'') on June 28, 2022.
Proposed Agency Information Collection Activities; Comment Request
Document Number: 2023-00293
Type: Notice
Date: 2023-01-10
Agency: Federal Railroad Administration, Department of Transportation
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, this notice announces that FRA is forwarding the Information Collection Requests (ICRs) abstracted below to the Office of Management and Budget (OMB) for review and comment. These ICRs describe the information collections and their expected burdens. On July 5, 2022, FRA published a notice providing a 60-day period for public comment on the ICRs.
Guidance on Submitting Requests for Waivers, Block Signal Applications, and Other Approval Requests to the Federal Railroad Administration
Document Number: 2023-00238
Type: Notice
Date: 2023-01-10
Agency: Federal Railroad Administration, Department of Transportation
FRA is issuing this notice to advise all interested stakeholders that it has issued and made available on its website a guidance document addressing requirements related to the submission of requests for waivers, applications to modify or discontinue a railroad signal system, and other special approval requests to FRA. The guidance document is intended to provide information regarding existing requirements and best practices when submitting requests for waivers, block signal applications, and other special approval requests to FRA.
Massachusetts Bay Transportation Authority's Request To Amend Its Positive Train Control System
Document Number: 2023-00123
Type: Notice
Date: 2023-01-09
Agency: Federal Railroad Administration, Department of Transportation
This document provides the public with notice that, on December 21, 2022, the Massachusetts Bay Transportation Authority (MBTA) submitted a request for amendment (RFA) to its FRA-certified positive train control (PTC) system. FRA is publishing this notice and inviting public comment on MBTA's RFA to its PTC system.
Notice of Funding Opportunity for Projects Located on the Northeast Corridor for the Federal-State Partnership for Intercity Passenger Rail Program
Document Number: 2022-28034
Type: Notice
Date: 2022-12-27
Agency: Federal Railroad Administration, Department of Transportation
This notice details the application requirements and procedures to obtain grant funding for projects located on the Northeast Corridor (NEC) under the Federal-State Partnership for Intercity Passenger Rail Program (FSP Program) for Fiscal Year 2022 and 2023. This notice solicits applications for FSP Program funds made available by the Consolidated Appropriations Act, 2022, and Division J of the Infrastructure Investment and Jobs Act (IIJA). The opportunity described in this notice is made available under Assistance Listings Number 20.326, ``Federal-State Partnership for Intercity Passenger Rail.''
Brightline Trains Florida's Request for Approval To Field Test Positive Train Control
Document Number: 2022-27668
Type: Notice
Date: 2022-12-21
Agency: Federal Railroad Administration, Department of Transportation
This document provides the public with notice that on December 9, 2022, Brightline Trains Florida (BTF) submitted a document entitled, ``Brightline OX Line Segment Test Request 120922,'' dated December 9, 2022, to FRA. BTF asks FRA to approve its request so that BTF may field test its trains that have been equipped with positive train control (PTC) technology.
Union Pacific Railroad's Request To Amend Its Positive Train Control Safety Plan and Positive Train Control System
Document Number: 2022-27667
Type: Notice
Date: 2022-12-21
Agency: Federal Railroad Administration, Department of Transportation
This document provides the public with notice that, on December 12, 2022, Union Pacific Railroad (UP) submitted a request for amendment (RFA) to its FRA-approved Positive Train Control Safety Plan (PTCSP). As this RFA may involve a request for FRA's approval of proposed material modifications to an FRA-certified positive train control (PTC) system, FRA is publishing this notice and inviting public comment on the railroad's RFA to its PTCSP.
Notice of Solicitation of Corridor Proposals and Funding Opportunity for the Corridor Identification and Development Program
Document Number: 2022-27559
Type: Notice
Date: 2022-12-20
Agency: Federal Railroad Administration, Department of Transportation
This notice details the application requirements and procedures for the selection of eligible corridors to participate in the Corridor Identification and Development Program and obtain grant funding appropriated in fiscal year 2022. This notice solicits applications for the Corridor Identification and Development Program funds made available by the Infrastructure Investment and Jobs Act and subsequent appropriations. The opportunity described in this notice is made available under Assistance Listings Number 20.326, ``Federal-State Partnership for Intercity Passenger Rail.''
Drug and Alcohol Testing: Determination of Minimum Random Testing Rates for 2023
Document Number: 2022-27553
Type: Notice
Date: 2022-12-20
Agency: Federal Railroad Administration, Department of Transportation
This notification of determination announces FRA's minimum annual random drug and minimum annual random alcohol testing rates for employees performing covered service under the hours of service laws (HOS employees), maintenance-of-way (MOW) employees, and mechanical (MECH) employees for calendar year 2023.
Petition for Extension of Waiver of Compliance
Document Number: 2022-26552
Type: Notice
Date: 2022-12-07
Agency: Federal Railroad Administration, Department of Transportation
Notice of Application for Approval of Discontinuance or Modification of a Railroad Signal System
Document Number: 2022-26551
Type: Notice
Date: 2022-12-07
Agency: Federal Railroad Administration, Department of Transportation
Notice of Funding Opportunity for the Federal-State Partnership for Intercity Passenger Rail Program
Document Number: 2022-26610
Type: Notice
Date: 2022-12-07
Agency: Federal Railroad Administration, Department of Transportation
This notice (FSP-National) details the application requirements and procedures to obtain grant funding for projects not located on the Northeast Corridor under the Federal-State Partnership for Intercity Passenger Rail Program (FSP Program) for Fiscal Year 2022. The FSP-National notice solicits applications for FSP funds made available by the Consolidated Appropriations Act, 2022, and the Infrastructure Investment and Jobs Act. The opportunity described in this notice is made available under Assistance Listings Number 20.326, ``Federal-State Partnership for Intercity Passenger Rail.''
CSX Transportation's Request To Amend Its Positive Train Control Safety Plan and Positive Train Control System
Document Number: 2022-25963
Type: Notice
Date: 2022-11-29
Agency: Federal Railroad Administration, Department of Transportation
This document provides the public with notice that, on November 11, 2022, CSX Transportation (CSX) submitted an updated request for amendment (RFA) to its FRA-approved Positive Train Control Safety Plan (PTCSP). As this RFA may involve a request for FRA's approval of proposed material modifications to an FRA-certified positive train control (PTC) system, FRA is publishing this notice and inviting public comment on the railroad's RFA to its PTCSP.
Equivalent Protective Arrangements for Railroad Employees
Document Number: 2022-25882
Type: Notice
Date: 2022-11-28
Agency: Federal Railroad Administration, Department of Transportation
This is a notice of final guidance issued by the Federal Railroad Administration (FRA) in connection with statutorily required protective arrangements for employees impacted by certain projects financed by the Federal government.
Petition for Extension of Waiver of Compliance
Document Number: 2022-25323
Type: Notice
Date: 2022-11-22
Agency: Federal Railroad Administration, Department of Transportation
Petition for Extension of Waiver of Compliance
Document Number: 2022-25322
Type: Notice
Date: 2022-11-22
Agency: Federal Railroad Administration, Department of Transportation
Petition for Extension of Waiver of Compliance
Document Number: 2022-25321
Type: Notice
Date: 2022-11-22
Agency: Federal Railroad Administration, Department of Transportation
Safety Glazing Standards; Codifying Existing Waivers and Adding Test Flexibility
Document Number: 2022-24469
Type: Rule
Date: 2022-11-17
Agency: Federal Railroad Administration, Department of Transportation
FRA is amending its Safety Glazing Standards for exterior windows on railroad equipment to codify long-standing waivers, add a new testing option to improve consistency of glazing testing, and revise outdated section headings. The changes update and clarify existing requirements to maintain and, in some cases, enhance safety, while reducing unnecessary costs. Codification of the waivers is also consistent with the Infrastructure Investment and Jobs Act and will enable FRA to use its inspection resources more efficiently.
Petition for Waiver of Compliance
Document Number: 2022-24964
Type: Notice
Date: 2022-11-16
Agency: Federal Railroad Administration, Department of Transportation
Petition for Waiver of Compliance
Document Number: 2022-24963
Type: Notice
Date: 2022-11-16
Agency: Federal Railroad Administration, Department of Transportation
Notice of Application for Approval of Discontinuance or Modification of a Railroad Signal System
Document Number: 2022-24962
Type: Notice
Date: 2022-11-16
Agency: Federal Railroad Administration, Department of Transportation
Petition for Waiver of Compliance
Document Number: 2022-24961
Type: Notice
Date: 2022-11-16
Agency: Federal Railroad Administration, Department of Transportation
Petition for Waiver of Compliance
Document Number: 2022-24960
Type: Notice
Date: 2022-11-16
Agency: Federal Railroad Administration, Department of Transportation
Federal-State Partnership for Intercity Passenger Rail Program; Northeast Corridor Project Inventory
Document Number: 2022-24860
Type: Notice
Date: 2022-11-15
Agency: Federal Railroad Administration, Department of Transportation
FRA is publishing the Northeast Corridor (NEC) project inventory (NEC Project Inventory), which is a requirement of the Federal-State Partnership for Intercity Passenger Rail Program (FSP). FRA is required to publish the NEC Project Inventory not later than one year after the enactment of the Infrastructure Investment and Jobs Act, also known and the Bipartisan Infrastructure Law (BIL).
Railroad Safety Advisory Committee; Notice of Meeting
Document Number: 2022-24730
Type: Notice
Date: 2022-11-15
Agency: Federal Railroad Administration, Department of Transportation
FRA announces the sixty-third meeting of the Railroad Safety Advisory Committee (RSAC), a Federal Advisory Committee that develops railroad safety regulations through a consensus process.
Proposed Agency Information Collection Activities; Comment Request
Document Number: 2022-24723
Type: Notice
Date: 2022-11-14
Agency: Federal Railroad Administration, Department of Transportation
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, FRA will seek approval of the Information Collection Request (ICR) abstracted below. Before submitting this ICR to the Office of Management and Budget (OMB) for approval, FRA is soliciting public comment on specific aspects of the activities identified in the ICR.
Notice of Final Agency Actions on Proposed Railroad Project in California, on Behalf of the California High-Speed Rail Authority
Document Number: 2022-24523
Type: Notice
Date: 2022-11-10
Agency: Federal Railroad Administration, Department of Transportation
FRA, on behalf of the California High-Speed Rail Authority (Authority), is issuing this notice to announce actions taken by the Authority that are final. By this notice, FRA is advising the public of the time limit to file a claim seeking judicial review of the actions. The actions relate to the California High-Speed Rail San Francisco to San Jose Project Section (Project). These actions grant approvals for project implementation pursuant to the National Environmental Policy Act (NEPA) and other laws, regulations, and executive orders.
Central Florida Rail Corridor's Request for Positive Train Control Safety Plan Approval and System Certification
Document Number: 2022-24394
Type: Notice
Date: 2022-11-09
Agency: Federal Railroad Administration, Department of Transportation
This document provides the public with notice that, on October 26, 2022, Central Florida Rail Corridor (CFRC) submitted its Positive Train Control Safety Plan (PTCSP), Version 4.1, dated October 21, 2022, to FRA's Secure Information Repository. CFRC asks FRA to approve its updated PTCSP and certify CFRC's Interoperable Electronic Train Management System (I-ETMS) as a mixed PTC system.
Long Island Rail Road's Request To Amend Its Positive Train Control Safety Plan and Positive Train Control System
Document Number: 2022-24123
Type: Notice
Date: 2022-11-07
Agency: Federal Railroad Administration, Department of Transportation
This document provides the public with notice that, on October 21, 2022, Long Island Rail Road (LIRR) submitted a request for amendment (RFA) to its FRA-approved Positive Train Control Safety Plan (PTCSP). As this RFA may involve a request for FRA's approval of proposed material modifications to an FRA-certified positive train control (PTC) system, FRA is publishing this notice and inviting public comment on the railroad's RFA to its PTCSP.
Train Crew Size Safety Requirements; Correction
Document Number: 2022-24117
Type: Proposed Rule
Date: 2022-11-04
Agency: Federal Railroad Administration, Department of Transportation
The Federal Railroad Administration published a document in the Federal Register of October 27, 2022, announcing a public hearing and extending the comment period for a notice of proposed rulemaking proposing minimum safety requirements for the size of train crews. The document contained a mis-formatted web address to a public website where further information regarding the announced public hearing could be obtained.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.